Laserfiche WebLink
L5 <br /> m j <br /> uw <br /> C, <br /> STOOP <br /> I P'l <br /> --- -- ----- <br /> STUB OUT <br /> RE BAR 18" <br /> 3 PLACES) <br /> TYP <br /> -41--3Yz"-12`1 T. <br /> 0- <br /> ,S 1-7 N!/ <br /> I <br /> L <br /> II W <br /> coILL. <br /> Lij <br /> 4--3Yj 2-- <br /> LIJ <br /> < <br /> <50 <br /> "r 1 0.4y�' <br /> d, <br /> —c�00 4 <br /> HO <br /> z <br /> IS <br /> r2 ini i 4z uj <br /> F-71 I <br /> Uj LIJ <br /> LABZ1GRADE <br /> PERPLAN NOTE I <br /> (ELEVVARIES) <br /> 2 4 -3 Xly ALL FRAMING OR HARDWARE <br /> -04" NOT SHOWN OR SPECIFIED <br /> TO REMAIN UNCHANGED <br /> w <br /> I SEEP E OUT STEP <br /> STUB 0 X <br /> 18" REBAR I Z w <br /> wl-AGES) (3 PLACE > <br /> 0 w <br /> FOUNDATION PLAN NOTES — LL <br /> I. STEP 1 Slab-on-Grade shall .In&Slab shall be poured over F, Gran I per Geol.cinnical R.prL Sea And,ilai <br /> Drawings for BI -tiori.Da,sanno <br /> iY I STEP F- 0 <br /> Al_kCH 2�PORCH WALLS Slab Elevation r n,and Slope requirements. <br /> IN I # <br /> DIRECTLY TO PORCH SLAB <br /> PER 12IS07 STEP 2. Cons Wct on/Control Joint in slabs are optional but recommended to control cracking When uses slab areas between joists shall <br /> : V ST T- be approximately square and 400-af,r less, <br /> 22� ----------- <br /> d-ris B.h.-fF..t g.shall be so, <br /> an competent <br /> at <br /> v petarn,property graded bearing soil below Fro Dapth. z <br /> .1-T 4. And,o,Soil,for Edenjor Staid Wall, hall be in accordance wish Pt-6 of the Shear Wait Schedule of 1/506, <br /> T- 2-9- <br /> SLAB-ON-GRADE 5 See 10/S06 for Sknphon to USP hardware con-man table. 0 2 <br /> PORCH LL cl <br /> HD ATTACH 2.PORCH WALLS JAI <br /> 0 D <br /> REFER TO ARCH1 SECTION 4--4Y2- DIRECTLY TO PORCH SLAB LEGEND <br /> FOUNDATION CONSTRUCTION <br /> 0 0 , I REFER TO PER <br /> 1 "y <br /> D3814 FOR FRONT PORCH 4---- —5r=7)�"— ARCIHL SECTION DETAIL--UT <br /> oik -3 D38/4 FOR FRONT PORCH <br /> CONSTRUCTION <br /> i -2-10YI1' <br /> FOUNDATION CONSTIR N F-P1--X-1 ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF IIS06 <br /> EXTENDED FRONT PORCH OPTION-ELEV-'EV S—GRADE PER PLAN NOTE 1 <br /> FOUNDATION WALL <br /> RAISED FOUNDATION WALL <br /> BEARING OR SHEAR WALL ABOVE <br /> CRANK SPACE POST BELOW <br /> OFOOTING CALI-OUT SEE <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16S02B(M) <br />