Laserfiche WebLink
G_ <br /> Wry <br /> C� <br /> 10 <br /> N� <br /> W �Z <br /> lip w> <br /> U � <br /> �J <br /> 30'-0" a c =w <br /> F <br /> 17'-0" 13'-0" tri m <br /> 2aY4. OPa� <br /> Q SLAB-ON-GRADE <br /> 24 Q STOOP 1{ <br /> - - - ------- a <br /> 2%" <br /> STUB OUT 1 <br /> REBAR IB' I I in W � <br /> (3 PLACES) <br /> - ———————- — ———— <br /> I I I <br /> T. <br /> I I 1 - �OF.ASMN <br /> I ro TMP I ,' I SO7 <br /> o a <br /> I I 8 8 18 Q�� 8 507 8 I TMP s E <br /> s. <br /> N <br /> I ® I ® I I <br /> IL LJ L J L J <br /> 6-6 <br /> I I I ~ <br /> I I I <br /> V— <br /> W <br /> ———— — n <br /> I <br /> m I I I 6'-6y2' <br /> ? < I W <br /> L °l <br /> J <br /> So I =N W <br /> op <br /> I m <br /> ---- -'_ 1 L J L®J PER PLAN NOTE 1 - I S07 <br /> I 2'-0" 6'-5Y" 2-0 (ELEV VARIES) N <br /> I I I• - I I � <br /> '{i I W <br /> LLJ <br /> ALL FRAMING OR HARDWARE : Z <br /> NOT SHOWN OR SPECIFIED ( _ - O W <br /> TO REMAIN UNCHANGED t( I - - L.L <br /> ' - FOUNDATION PLAN NOTES <br /> I HD HD 1 S ab-on Grade shall be 4 thick Slab shall be poured over Free Draining Granular Fill per eotechn ca Report. Architectural O <br /> Draw ngs for Slab Elevation Depression,and Slope requirements. <br /> 24"STEM <br /> MIN RAISED <br /> STUB OUT N N 2. Construct on/Can Vol square <br /> nt n Slabs are optional bid recommended to onto cracking.When used slab areas between jo s s shell Q a <br /> STEM WALL RETURN S I be approximately d aoo-sf or lass <br /> REBAR 18" I , ry `.y y 6„ square an <br /> q No Po Z <br /> STEP (3 PLACES) STEP SQ v - STEP o o v STEP STEM STEP 3 The Contractor shall delenri ne actual footing aeons based on final des and site conditions.Banon of Footings shall be set--- -J —_—_ R L_ — --- geev grades <br /> —————— <br /> on compatent properly graded bearing sail below Frost Depth O <br /> — ———————— —————————— —— J 4. Anchor Bolts for Exter or Stud Walls shall be in accordance with P1-6 of the Shear Wall Schedule of 1/SOB,u.o.n. <br /> 61\ro01 I 1 I �Ty 3 O� - 5. See 10/SO6 for Simpson to USP hardware conversion table. O U <br /> I 1 STUB OUT REBAR PER- I 18(3 PLACES) 'P rr e L <br /> m ATTACH 2x PORCH I I I I 13/SO7 LEGEND <br /> WALLS DIRECTLY I I I I I — — — —— - (H=5'-6") <br /> TO PORCH SLAB 1 <br /> PER 12/S07 ATTACH 2.PORCH <br /> ( I SLA paRCHRADE S07 WALLS DIRECTLY S X DETAIL CALL-OUT <br /> ——_— TO PORCH SLAB <br /> PER 12/SO7 REFER TO ARCH'L p1- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/806 <br /> SLAB-ON-GRADE 1_I SECTION D3814 FOR <br /> PORCH 507 FRONT PORCH a <br /> FOUNDATION SlA6-0N-GRADE PER PLAN NOTE 1 k <br /> REFER TO ARCH'L CONSTRUCTION m <br /> ---, <br /> SECTION 038/4 FOR LOJ FOUNDATION WALL <br /> od <br /> FRONT PORCH <br /> FOUNDATION 2'-SYz' 6'-g" 16-S, <br /> CONSTRUCTION 2-4Y¢" n <br /> I- -''�-I RAISED FOUNDATION WALL <br /> EXTENDED FRONT PORCH OPTION-ELEV.'B' i 30'-0" BEARING OR SHEAR WALL ABOVE <br /> O <br /> u o <br /> CRAWL SPACE POST BELOW <br /> o a <br /> 0 <br /> O FOOTING CALL-OUT SEE 5/S07 <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 1/4"=1'0" 0 1 2 4 8 16 S02B <br />