Laserfiche WebLink
s <br /> O <br /> N s <br /> LLI }-. <br /> — �S <br /> V �J <br /> aa. w <br /> f—F <br /> m C; <br /> on <br /> rn Q <br /> iE <br /> C7 <br /> �ppe2 <br /> q5 L <br /> z S e <br /> w <br /> ` T. <br /> 5666 �3 <br /> 7CTW. <br /> I _D 10.0" I =K/10 <br /> LL <br /> i7—P55'-00' <br /> W JLLI <br /> U <br /> P1-6 }( <br /> r - --- - I 2'-0" � LL <br /> P1-6 --- <br /> I yi I I <br /> H- <br /> mop <br /> W Q <br /> I i I I I W <br /> T J <br /> S07 <br /> W <br /> I= m <br /> ALL FRAMING OR HARDWARE I - I I - <br /> NOT SHOWN OR SPECIFIED I I - ALL FRAMING OR HARDWARE <br /> TO REMAIN UNCHANGED I I NOTSHOWN OR SPECIFIED <br /> TO REMAIN UNCHANGED <br /> I I I I <br /> W <br /> it <br /> Z <br /> j <br /> 3 FOUNDATION PLAN NOTES' <br /> O w <br /> S07 Slab on Grade shall he 4'Wck lab shall be poured o er Free Dre n ng Granular Fdl per Geotechmw R epoli ee A ch edu al I .. <br /> Drawings far Slab EfevaVon,Depress reme Depression,and Slope requints <br /> A. , 2 ConstrucaonlConlrol Joint n Slabs are mmn optional but recended to control cracking W—used tw,slab areas beeen p. mall <br /> p —P be appraxuna[aty squam and 400-sf or less <br /> 3. The Contractor shall delennine actual footing elevations based on final grades and site conditions.B m otto of Footings shall be set <br /> on competent,properly graded beano z Z—— "-^;- g sail below Frost Depth,5'0"� <br /> ------- O <br /> 4. Anchor Boils for Exterior Stud Walls shall be in accordance with P1E of the Shear Wall Schedule of VS06,u.o.n. <br /> 10Yz" 8'-3" i0 5. See 10IS06 for Simpson to USP hardware conversion table. O U <br /> vz' <br /> 1L C <br /> LEGEND L� D <br /> EXTENDED GARAGE OPTION-EL w <br /> 3-CAR GARAGE OPTION-ELEV.'B' <br /> X DETAIL CALL-OUT <br /> FP-1-X ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1lSO6 <br /> a- SlAB-0N-GRADE PER PLAN NOTE 1 k <br /> --- m <br /> L� J FOUNDATION WALL <br /> m <br /> RAISED FOUNDATION WALL � <br /> K <br /> BEARING OR SHEAR WALL ABOVE 1 <br /> ~ N <br /> GRAWL SPACE POST BELOW O <br /> O FOOTING CALL-OUT SEE 5/S07 > o <br /> w <br /> of <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16 <br /> S02.1B(M) <br />