My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
406 PECKS DR 2025-04-17
>
Address Records
>
PECKS DR
>
406
>
406 PECKS DR 2025-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 7:45:53 AM
Creation date
1/24/2025 3:04:38 PM
Metadata
Fields
Template:
Address Document
Street Name
PECKS DR
Street Number
406
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TYPICAL FOOTING DRAIN <br /> Slope the surface to drain <br /> away from the wall <br /> Compacted soil general backfill, or <br /> structural fill where applicable(refer <br /> to notes below) <br /> J J <br /> NJ - - <br /> -- ----^----^^-w-- FLOOR SLAB <br /> Non-woven geotextile filter ---w^-------- - <br /> fabric(Mirafi 140 NL, or <br /> equivalent), wrapped around ww _ CAPILLARY BREAK <br /> the drain rock �' ' -- <br /> r. a; FOOTING <br /> Washed drain rock oviA, s _ <br /> Minimum 4-inch diameter <br /> slotted or perforated PVC pipe <br /> (perforations facing down);lay <br /> pipe to have sufficient gradient <br /> toward dischargea <br /> NOT TO SCALE <br /> NOTES: <br /> 1.) Perforated or slotted rigid PVC pipe should be tight jointed and laid with perforations or slots down, <br /> and with positive gradient toward discharge location(s). The pipe should be placed at or slightly <br /> above the elevation of the bottom of the footing. Do not replace rigid PVC pipe with flexible <br /> corrugated plastic pipe. <br /> 2.) Do not connect other drainage lines to the footing drain lines. Drain line cleanouts should be <br /> installed at appropriate locations to allow inspection and maintenance of the lines after construction. <br /> 3.) If the backfill will support sidewalks, driveways, patios, or other structures, it should be compacted <br /> to at least 90% of its maximum dry density based on the Modified Proctor test method, except that <br /> the top 12 inches of the backfill should be compacted to at least 95% of the maximum dry density. <br /> 4.) The geotextile filter fabric should be placed around the drain rock as shown, and not wrapped <br /> directly around the pipe. <br /> TYPICAL FOOTING DRAIN <br /> GEO Group Northwest, Inc. PROPOSED GARAGE ADDITION <br /> Geotechnical Engineers,Geologists,& 4730 -SEAHURST AVE <br /> Environmental Scientists EVERETT,WASHINGTON 98203 <br /> SCALE: NONE DATE: 12/30/2021 MADE: GD CHKD: WC JOB NO. G-5593 PLATE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.