Laserfiche WebLink
Fairway Estates = Entry <br /> 1427 100th St. SW, Everett, WA <br /> LANDSCAPE PLANS - DD SET w 'E o <br /> GENERAL NOTES: IRRIGATION GENERAL NOTES: VICINITY MAP: E <br /> U E y <br /> I. THESE CONSTRUCTION DOCUMENTS,INCLUDING ALL PLANS,NOTES,DETAILS AND SPECIFICATIONS ARE I. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FULL IRRIGATION COVERAGE OF ALL - OIT <br /> d o <br /> INTENDED TO FACILITATE THE INSTALLATION CONTRACTOR BY PROVIDING GENERAL GUIDELINES FOR PLANT MATERIAL. Mai m U <br /> DESIGN INTENT.IT IS THE GOAL OF THE DOCUMENTS THAT THE WORK IS TO BE COMPLETED WITHOUT 2. THE LANDSCAPE CONTRACTOR SHALL SUBMIT FULL PIPING PLANS,AFTER FIELD d <br /> H <br /> a LL <br /> CHANGE ORDERS.ALL QUANTITIES SHOWN IN THE DOCUMENTS ARE ESTIMATES ONLY AND ARE NOT VERIFICATION,DEPICTING POINT OF CONNECTION,METER LOCATION AND SIZE, 'd a <br /> GUARANTEED;THE CONTRACTOR SHALL SUPPLY ALL MATERIALS,LABOR AND EQUIPMENT IN ORDER TO BACKFLOW PREVENTER LOCATION AND SIZE,AND PIPE ROUTING AND SIZES. ° rn <br /> FULFILL THE INTENT OF THE DESIGN DRAWINGS. 3. THE LANDSCAPE CONTRACTOR SHALL INSTALL THE SPECIFIED SYSTEM IN ACCORDANCE o <br /> e <br /> 2 INTERPRETATION <br /> RECORD" THE RESP H TH PLANS AND OENS SHALL BE MADE BY THE CTIVE DOCUMENT AND SAUTHOR"OR WITH THE ATTACHED SCHEDULES,NOTES,DETAILS,AND SPECIFICATIONS. 0 <br /> ALL BE CONSIDERED FINAL. 4. THE LANDSCAPE CONTRACTOR TO SITE VERIFY PRESSURE AND NOTIFY LANDSCAPE <br /> ANY POSSIBLE AMBIGUITY SHALL BE SUBMITTED IN WRITING BY THE CONTRACTOR PRIOR TO SUBMITTING ARCHITECT OF ANY DIFFERENCES PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. W pVj h o <br /> FORMAL BIDS.ALL CLARIFICATIONS SHALL BE PREPARED IN WRITING BY THE IF CONTRACTOR FAILS TO NOTIFY LANDSCAPE ARCHITECT,HE IS FINANCIALLY <br /> "ARCHITECT/ENGINEER-OF-RECORD"PRIOR TO BIDDING.THE CONTRACTOR SHALL ACCEPT THE RESPONSIBLE FOR ANY NECESSARY SYSTEM ALTERATIONS THAT RESULT. <br /> INTERPRETATION OF THE"ARCHITECT/ENGINEER-OF-RECORD"AS THE CORRECT AND FINAL 5. THE LANDSCAPE CONTRACTOR SHALL FIELD VERIFY EXISTING TAP LOCATIONS.INSTALL <br /> INTERPRETATION. NEW METERS PER THE ATTACHED IRRIGATION SCHEDULE. <br /> 3. ANY INCIDENTAL INSTALLATION PROCEDURE,MATERIAL OR EQUIPMENT,NOT MENTIONED IN THESE 6. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING OF a <br /> CONSTRUCTION DOCUMENTS,THE SPECIFICATIONS NOR SHOWN ON THE PLANS,WHICH MAY BE ASPHALT AND CONCRETE AS REQUIRED FOR SLEEVE INSTALLATION ACCORDING TO THE <br /> NECESSARY FOR COMPLETION AND SATISFACTORY OPERATION OF THE DESIGN SYSTEM SHALL BE IRRIGATION SCHEDULE. <br /> FURNISHED AND INSTALLED(AS BASED ON INDUSTRY STANDARDS)AS THOUGH SHOWN OR PROVIDED 7. CONTROLLER TO BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS.CONTROLLER - C <br /> FOR. SIZE AND QUANTITIES TO BE DETERMINED BY THE VALVE REQUIREMENTS AND POINTS OF <br /> 4. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE LOCATIONS OF EXISTING AND FUTURE CONNECTION.INSTALL ONE(1)CONTROLLER AT EACH POINT OF CONNECTION. <br /> UNDERGROUND SERVICES AND IMPROVEMENTS WHICH MAY CONFLICT WITH THE WORK TO BE DONE. 8. INSTALL PVC MAINLINE AND LATERALS ACCORDING TO THE IRRIGATION AND PIPING <br /> NOTIFY THE OWNER'S AUTHORIZED REPRESENTATIVE IMMEDIATELY SHOULD A CONFLICT ARISE. SCHEDULES. <br /> r O <br /> 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS AND SHALL NOTIFY ALL 9. ALL VALVE FLOWS SHALL NOT EXCEED MANUFACTURER'S SPECIFICATIONS. --- <br /> UTILITY COMPANIES WITH UTILITIES ON SITE PRIOR TO THE CONSTRUCTION OF THE PROJECT. 10. VALVE BOXES SHALL BE SQUARE TO ADJACENT WALKS OR CURBS AND FLUSH WITH THE <br /> 6. FOR UNDERGROUND UTILITY COORDINATION AND 48 HOURS PRIOR TO START OF CONSTRUCTION FINAL GRADE. { ■ ■ <br /> (DEPENDING ON AREA OR JURISDICTION,THE CONTRACTOR SHALL CONTACT: 11. WORK SHALL CONFORM TO ALL CONSTRUCTION CODES AND REGULATIONS. t- <br /> A)UTILITY NOTIFI I <br /> CATION CENTER WASHINGTON)1-800-424-5555 12. THE LANDSCAPE CONTRACTOR SHALL INSTALL GREEN VALVE BOXES IN TURF AREAS AND <br /> BI UNDERGROUND SERVICES ALERT(USA)1-800-227-2600 TAN VALVE BOXES IN DECOMPOSED GRANITE AREAS(TYPICAL). ' epp �qF <br /> C)SEATTLE PUBLIC UTILITIES 1-206-684-3000 13. REFER TO THE IRRIGATION NOTES FOR THE CALCULATED PRESSURE AT THE WATER METER. <br /> 7. THESE NOTES ARE TO BE USED FOR GENERAL REFERENCE IN CONJUNCTION WITH AND AS A SUPPLEMENT REFER TO NOTE#4 IF PRESSURE DIFFERS FROM THAT NOTED. UU <br /> TO THE WRITTEN SPECIFICATIONS,APPROVED ADDENDUMS,AND THE CHANGE ORDERS AS ASSOCIATED 14. THE LANDSCAPE CONTRACTOR SHALL VISIT SITE PRIOR TO BIDDING ON PROJECT TO <br /> WITH THESE CONSTRUCTION DOCUMENTS. VERIFY INSTALLATION CONDITIONS. <br /> 8. SHOULD THE CONTRACTOR HAVE ANY QUESTIONS REGARDING THESE CONSTRUCTION DOCUMENTS OR 15. PRIOR TO COMMENCEMENT OF ANY WORK,THE CONTRACTOR SHALL CONTACT BLUE STAKE TO VERIFY LOCATIONS AND DEPTHS OF UNDERGROUND UTILITIES THAT MAY BE <br /> SHOULD THERE BE ANY DISCREPANCIES,HE SHALL CONTACT THE LANDSCAPE ARCHITECT FOR - <br /> CLARIFICATION BEFORE PROCEEDING FURTHER. EFFECTED BY HIS WORK,AND HE SHALL BE RESPONSIBLE FOR DAMAGES TO SUCH I <br /> 9. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS AND PER GOVERNING CODES AND/OR UTILITIES CAUSED AS A RESULT OF HIS IRRIGATION INSTALLATION. _ - -� -f ■ ■ <br /> ORDINANCES. 16. THE CONTRACTORSHALLBE RESPONSIBLE FOR COMPENSATING THE OWNER AND/OR 100TH ST SW 0 1` <br /> 10. THE CONTRACTOR SHALL PROVIDE BARRICADES AND TRAFFIC CONTROL ALONG PUBLIC STREETS,IF THE OWNER'S REPRESENTATIVE FOR ANY DESIGN CHANGES MADE AS A RESULT OF - L <br /> REQUIRED,DURING INSTALLATION. DEVIATION BY THE CONTRACTOR FROM THE PLANS AND SPECIFICATIONS OR DUE TO - <br /> 11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REPORT TO THE LANDSCAPE ARCHITECT AND/OR THE OWNER'S ERRORS,FAULTY MATERIAL OR FAULTY WORKMANSHIP. . <br /> AUTHORIZED REPRESENTATIVE ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND FIELD 17. INSTALL ALL MAINLINES WITH A MINIMUM OF 20"OF COVER. <br /> CONDITIONS PRIOR TO THE START OF WORK. 18. INSTALL ALL LATERALS WITH A MINIMUM OF 12"OF COVER, <br /> 12. BEFORE WORK BEGINS ON THE PROJECT,THE CONTRACTOR SHALL REVIEW THE PROJECT WITH THE 19. ALL PIPE TO BE INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS AND ASTM <br /> LANDSCAPE ARCHITECT AND/OR THE OWNER'S AUTHORIZED REPRESENTATIVE. STANDARD D 2774. <br /> 13. THE LANDSCAPE ARCHITECT AND/OR THE OWNER'S AUTHORIZED REPRESENTATIVE SHALL APPROVE ANY 20. ALL THREADED JOINTS TO BE COATED WITH TEFLON TAPE UNLESS OTHERWISE SPECIFIED <br /> OR ALL CHANGES PRIOR TO THE START OF WORK. BY THE MANUFACTURER.USE LIQUID TEFLON ON METAL PIPE THREADS ONLY. <br /> 14. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND COORDINATING EXISTING SITE CONDITIONS. 21. FLUSHING OF ALL LINES PRIOR TO INSTALLATION OF SPRINKLERS AND EMITTERS IS HARDSCAPE GENERAL NOTES: <br /> 15. THE CONTRACTOR SHALL ADHERE TO ALL APPLICABLE LOCAL,STATE,AND/OR FEDERAL LAWS AND/OR REQUIRED. <br /> REGULATIONS PERTAINING TO THE PROJECT. 22. INSTALL ALL SPRINKLERS,EMITTERS,AND RELATED MATERIAL PER IRRIGATION SYSTEM <br /> 16. THE CONTRACTOR SHALL PROPERLY COORDINATE HIS WORK WITH OTHER CONTRACTOR'S WORK PRIOR SPECIFICATIONS AND DETAILS. <br /> TO INSTALLATION. 23. INSTALL ALL ELECTRICAL JOINTS WITH 3-M WATERPROOF CONNECTORS. 1. FOOTINGS,WALLS AND FENCES SHALL BE PLACED OUTSIDE OF THE <br /> 17. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT EXISTING IMPROVEMENTS AND 24. ALL ELECTRICAL CONNECTIONS SHALL BE MADE AT THE REMOTE CONTROL VALVE PUBLIC RIGHT-OF-WAY. <br /> THE PUBLIC FROM DAMAGE THROUGHOUT CONSTRUCTION. BOXES,CONTROLLER ENCLOSURES AND VALVE BOXES SPECIFICALLY FOR ELECTRICAL 2. ALL DETAILS SHALL BE REVIEWED BY A STRUCTURAL ENGINEER AND <br /> 18. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGES IMPOSED,UNINTENTIONALLY CONNECTIONS. MODIFIED(IF NECESSARY)PRIOR TO CONSTRUCTION. - A <br /> OR ACCIDENTALLY TO EXISTING UTILITIES,STRUCTURES,WALLS,OR OTHER AMENITIES,DUE TO THE ACTION 25. A CERTIFIED ELECTRICIAN SHALL BE RESPONSIBLE FOR INSTALLING ALL WIRING FROM THE 3. THE CONTRACTOR SHALL HAVE SIDEWALK SURVEYED AND STAKED FOR (J J <br /> OF THE CONTRACTOR,CONTRACTOR'S EMPLOYEES AND/OR THE CONTRACTOR'S SUBCONTRACTORS. CIRCUIT BREAKER AT THE 120 VOLT SOURCE LOCATION TO AUTOMATIC CONTROLLER. REVIEW BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. w <br /> DAMAGE OCCURRED DURING THE CONTRACTOR'S OPERATION SHALL BE REPAIRED,AT THE EXPENSE OF 26. ALL 120 VOLT VOLT POWER WIRE TO BE INSTALLED PER LOCAL CODE AND THE N.E.C. 4. IN ADDITION TO SUBMITTING MATERIAL SAMPLES OF ALL SITE RELATED <br /> THE CONTRACTOR,TO THE SATISFACTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. 27. INSTALL ALL VALVE WIRING IN MAINLINE TRENCH AS DETAILED. MATERIALS,THE CONTRACTOR SHALL PREPARE A 4'X4'SAMPLE PANEL N <br /> 19. MATCH GRADES,LAYOUT AND ELEVATIONS OF ADJOINING LANDSCAPE WORK BY OTHERS.NOTIFY THE 28. INSTALL ALL REMOTE CONTROL VALVES AT HEIGHT INDICATED ON DETAILS,AS HIGH AS FOR EACH TYPE OF CONSTRUCTION,I.E.,AI CONCRETE PAVERS,BI <br /> LANDSCAPE ARCHITECT OF CONFLICTS BEFORE PROCEEDING WITH CONSTRUCTION. POSSIBLE BUT ALLOWING CLEARANCE BETWEEN VALVE BOX LID AND FLOW CONTROL EXPOSED AGGREGATE PAVING,C)INTEGRAL COLORED CONCRETE, Z Z <br /> HANDLE ON REMOTE CONTROL VALVE. ETC.,FOR APPROVAL BY THE LANDSCAPE ARCHITECT AND OWNER'S <br /> 29. INSTALL ALL MAINLINE GATE VALVES IN A ROUND PLASTIC VALVE BOX PER DETAILS. AUTHORIZED REPRESENTATIVE PRIOR TO FINAL CONSTRUCTION. �l N H <br /> 30. ALL PVC SOLVENT WELD FITTINGS SHALL BE LASCO OR APPROVED EQUAL. 5. UNLESS NOTED OTHERWISE ON CONSTRUCTION DOCUMENTS OR NOTED <br /> PLANTING GENERAL NOTES. 5' 0 Z <br /> 31. THE MAINLINE,LATERAL PIPE,AND VALVES ARE SHOWN SCHEMATICALLY AND SHALL BE IN DETAILS,SIDEWALKS SHALL BE -0'WIDE,C THICK,3,000 PSI CONCRETE <br /> INSTALLED WITHIN THE LANDSCAPE AREA,OUTSIDE R.O.W.AND P.U.E.,ADJACENT TO ON COMPACTED BASE WITH CONSTRUCTION JOINTS AT 5'-0"ON CENTER _ <br /> SIDEWALK OR CURB AND OFFSET 18"WHEREVER POSSIBLE. AND EXPANSION JOINTS AT 20'-0"ON CENTER.SIDEWALKS SHALL HAVE A Lu L1J N <br /> I. THE CONTRACTOR SHALL REVIEW PLANTING PLAN WITH LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. MEDIUM BROOM,NON-SKID FINISH WITH 1/2'RADIUS TOOLED EDGES. Q Q <br /> 2 THE LANDSCAPE ARCHITECT OR HIS REPRESENTATIVE RESERVES THE RIGHT TO REFUSE ANY PLANT 32. SUPPLY THE FOLLOWING MATERIAL TO THE OWNER: <br /> AI TWO WRENCHES FOR DISASSEMBLY AND ADJUSTING OF EACH TYPE OF SPRINKLER 6. RADIUS AT SIDEWALK INTERSECTIONS SHALL BE 5'-0"(TYPICAL),UNLESS <br /> MATERIALS HE DEEMS UNACCEPTABLE.SEE SPECIFICATIONS. NOTED OTHERWISE. N U <br /> HEAD AND VALVE SUPPLIED. N <br /> 3. THE CONTRACTOR SHALL SUPPLY AND INSTALL ALL PLANT MATERIAL AS SPECIFIED ON THE PLANTING B)TWO KEYS FOR EACH OF THE CONTROLLERS. 7. THE CONTRACTOR SHALL LAYOUT AND VERIFY ALL HARDSCAPE ELEMENTS 0 <br /> PLANS.HOWEVER,SHOULD THE PLANT MATERIAL BE TEMPORARILY UNAVAILABLE,THE CONTRACTOR C)TWO COUPLERS WITH MATCHING HOSE BIBS AND SHUT-OFF VALVE. PRIOR TO CONSTRUCTION FOR REVIEW BY THE LANDSCAPE ARCHITECT \ z W <br /> SHALL NOTIFY THE LANDSCAPE ARCHITECT AND INSTALL 5 GALLON NURSERY BUCKETS WITH IRRIGATION AT OR OWNER'S AUTHORIZED REPRESENTATIVE.SHOULD DISCREPANCIES Q-' <br /> EACH PLANT LOCATION,AS THE PLANT MATERIAL BECOMES AVAILABLE,THE 5 GALLON BUCKETS SHALL BE DI TWO VALVE BOX KEYS. Q > <br /> 33. ALL MAINLINE FITTINGS FOR PIPE 3"AND LARGER SHALL BE CAST OR DUCTILE IRON FOR EXIST,CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OR � J <br /> REMOVED AND PLANT MATERIAL INSTALLED. PVC;SCHEDULE 80 PVC FOR 21/2"AND SMALLER, OWNER'S AUTHORIZED REPRESENTATIVE BEFORE PROCEEDING FURTHER. 7 W <br /> 4. ANY AND ALL SUBSTITUTIONS TO BE APPROVED BY DESIGN/BUILDER AND/OR THE LANDSCAPE ARCHITECT, 34. ALL MAINLINE PIPE SHALL BE A MINIMUM OF SCHEDULE 40. L <br /> 5. LOCATE PLANTS AWAY FROM SPRINKLER HEADS,LIGHT FIXTURES AND OTHER OBSTRUCTIONS. L u <br /> 6. FINAL LOCATION OF ALL PLANT MATERIAL SHALL BE SUBJECT TO THE APPROVAL OF THE OWNER'S 35. SLEEVES SHALL BE A MINIMUM OF TWO TIMES THE DIAMETER OF THE LINE SIZE. <br /> AUTHORIZED REPRESENTATIVE. 36. ALL MAINLINE AND IRRIGATION EQUIPMENT SHALL BE PLACED IN THE LANDSCAPED /r <br /> 7. PLANTING AND IRRIGATION DESIGN MAY BE MODIFIED TO ADAPT TO WALK CONFIGURATIONS THAT AREAS. \� <br /> DIFFER FROM THESE PLANS,OR BECAUSE OF GRADE LIMITATIONS ON SITE. 37. CONTROLLER WIRES THAT ARE DIRECT BURIED SHALL BE#14 OR BETTER,BUNDLED SH LL <br /> 8. WATER TEST ALL TREE PLANTING HOLES PRIOR TO PLANTING.IF TREE HOLE DOES NOT DRAIN,DO NOT WRAPPED A MINIMUM OF EVERY TWELVE(12')FEET.DURING INSTALLATION WIRES SHALL <br /> PLANT,SEE HARDPAN DETAIL. HAVE A 241"LOOP TIED IN ALL DIRECTION CHANGES GREATER THAT 30 DEGREES AND BE <br /> 9. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS NOT SHOWN ON DRAWINGS. UNTIED SYSTEM R OR TO <br /> HALLILL . SHEET INDEX: <br /> 10. TREES SHALL BE PLANTED A MINIMUM OF 10'-0"FROM STREET LIGHTS/FIRE HYDRANTS,6'-0"FROM EDGE OF 38. DRIP SYSTEM FLUSH CAPS SHALL BE PLACED IN A VALVE BO%AT THE END OF ALL DRIP <br /> UNDERGROUND PIPELINES AND A MINIMUM OF 4'-0"FROM WALKS,CURBS AND WALLS.SHRUBS SHALL BE LATERAL RUNS,AS DESCRIBED ON THE DRAWINGS. <br /> PLANTED A MINIMUM OF 2'-0"FROM CURB AND WALKS. 39. ALL VALVES,PRESSURE REGULATORS AND OTHER DEVICES SHALL BE PLACED IN AN COVER SHEET L0.0 <br /> 11. ALL SPECIMEN TREES,SHRUBS AND CACTI SHALL BE FIELD LOCATED BY LANDSCAPE ARCHITECT OR APPROPRIATELY SIZED VALVE BOX WITH A MINIMUM OF TWO(2")INCHES OF PEA DEMOLITION PLAN L1.1 <br /> OWNER'S AUTHORIZED REPRESENTATIVE. GRAVEL. <br /> 12. THE CONTRACTOR SHALL INSTALL"SHAWTOWN ROOT BARRIER PANELS"(OR APPROVED EQUAL)AT ALL 40. PRIOR TO PLACING ANY IRRIGATION SYSTEM IN SERVICE,A WASHINGTON CERTIFIED LAYOUT PLAN L2.1 <br /> TREES WITHIN 7'-0'FEET OF HARDSCAPE ELEMENTS INCLUDING(BUT NOT LIMITED T01 SIDEWALKS,ASPHALT, BACKFLOW DEVICE TESTER SHALL TEST THE BACKFLOW PREVENTION DEVICE AND GIVE A <br /> CONCRETE SLABS/FOOTINGS AND STRUCTURES.CONTRACTOR SHALL SUBMIT SPECIFICATION SHEETS OF COPY OF THE PASSEDOUNTY TEST DEPAULTS RTMENTO THE <br /> FPUBLI WORKS IYINSPEION SCTOR TATION. <br /> MAIL IT PLANTING PLANS L3.1 <br /> PROPOSED ROOT BARRIER PANELS TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO TO THE SNOHOMISH COUNTY DEPARTMENT OF PUBLIC WORKS INSPECTION STATION. LIGHTING PLANS L5.1 <br /> INSTALLATION. 41. AFTER INITIAL TESTING,ALL BACKFLOW DEVICES SHALL BE TESTED ANNUALLY. <br /> 13. THE CONTRACTOR SHALL INSTALL ARBOR GUARDS AT ALL TREES LOCATED IN TURF AREAS. 42. BACKFLOW DEVICES SHALL BE A MINIMUM OF TWO(2')FEET FROM THE WATER METER HARDSCAPE DETAILS L6.1 <br /> 14. ON-SITE AND OFF-SITE TOPSOIL SHALL CONFORM TO CONTENT REQUIREMENTS AS SPECIFIED IN PART 2 OF AND BE THE SAME SIZE AS THE METER SERVICE LINE. <br /> THE PLANTING SPECIFICATIONS.AGRONOMY TEST SUBMITTALS ARE REQUIRED FOR ALL MATERIAL USED 43. ALL CONCRETE <br /> OW PREVENTION DEVICES SHALL HAVE A MINIMUM 2LLED,C CLASS B PLANTING DETAILS L7.1 ■ ■ <br /> FOR TOPSOIL AND BACKFILL.SUBMIT REPORT TO LANDSCAPE ARCHITECT FOR REVIEW. CONCRETE SLAB WITH PIPE SLEEVES.IFASECURITY CAGE IS INSTALLED,CONCRETE SHALL LANDSCAPE SPECIFICATIONS L8.1 REVISIONS: <br /> BE SIX(6")INCHES LARGER ON ALL SIDES THAN THE SECURITY CAGE. <br /> 15. ALL PLANT MATERIAL SHALL BE IN COMPLIANCE WITH THE AMERICAN STANDARDS FOR NURSERY STOCK, 4q ALL PIPE CROSSINGS IN THE RIGHT-OF-WAY SHALL BE MARKED ON EACH SIDE OF THE Q <br /> LATEST EDITION. CURB WITH A NON-DESTRUCTIBLE MARKING. IRRIGATION SPECIFICATIONS LH.2 <br /> 16. THE CONTRACTOR SHALL PROVIDE MAINTENANCE FOR ALL ALL PLANT MATERIAL FROM THE TIME OF Q <br /> INSTALLATION THROUGH SUBSTANTIAL COMPLETION. <br /> 17. CACTI SHALL BE PLANTED A MINIMUM OF 3'-0"AWAY FROM ALL PEDESTRIAN ROUTES. Q <br /> 18. CACTI SHALL BE WELL ROOTED AND NON-SCARRED. GRADING GENERAL NOTES. <br /> 19. PLANT MATERIAL MARKED'SALVAGE'SHALL BE SELECTED FROM ON-SITE SALVAGE INVENTORY.ALL PROJECT #: <br /> MATERIAL SELECTIONS SHALL BE APPROVED BY LANDSCAPE ARCHITECT AND/OR OWNER'S AUTHORIZED <br /> REPRESENTATIVE. 1. CONTRACTOR SHALL GRADE TO MAINTAIN POSITIVE DRAINAGE AWAY FROM ALL CAR107 <br /> 20. IN DISTURBED AREAS INDICATED TO RECEIVE REVEGETATION HYDROSEED AND/OR PLANTING,THE STRUCTURES.REVIEW ENGINEERS PLAN FOR DRAINAGE. <br /> CONTRACTOR SHALL MATCH EXISTING NATURAL DESERT STONE GROUND COVER CONDITIONS ADJACENT 2. FINISH GRADING SHALL BE BY THE DIRECTION OF THE LANDSCAPE ARCHITECT. SCALE: <br /> TO THE PROJECT. 3. LANDSCAPE ARCHITECT SHALL APPROVE GRADING PRIOR TO PLANTING. NITS <br /> 21. NATIVE REVEGETATION AREAS AND PLANTER BEDS SHALL BE TREATED WITH PRE-EMERGENT AS PER 4. GRADING FOR THIS PROJECT INCLUDES THE FOLLOWING: <br /> MANUFACTURER'S INSTRUCTIONS.RE-APPLY AS NECESSARY TO ELIMINATE INVASIVE WEEDS.REMOVE ALL A)FINE GRADING OF EXISTING ROUGH GRADES IS REQUIRED TO PROVIDE SMOOTH, ISSUED FOR: <br /> DEAD DEBRIS. EVEN GRADE TRANSITION IN LANDSCAPE AREA. REVIEW <br /> 22. THE CONTRACTOR SHALL PROVIDE A 50'-0"BY 50'-0"TYPICAL MOCK-UP OF NATIVE REVEGETATION AREAS B)IMPORTING AND PLACING"OFF-SITE 3/8"MINUS TOPSOIL"IN THE FOLLOWING <br /> FOR REVIEW BY THE LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE. AREAS: DRAWN BY: <br /> 23. ALL TREE STAKING SHALL CONFORM TO THE PLANTING DETAILS OR AS NOTED IN THE SPECIFICATIONS.THE 1)TURF,AND ANNUAL AREAS(6"DEPTH). <br /> LANDSCAPE ARCHITECT OR OWNER'S AUTHORIZED REPRESENTATIVE SHALL REVIEW TYPICAL TREE STAKING 11)PLANT BACKFILL(CAN BE SCREENED ON-SITE SOIL). TEAM <br /> PRIOR TO FINAL ACCEPTANCE. 5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ANY CALICHE ENCOUNTERED ON DATE: <br /> SITE AT NO ADDITIONAL COST TO THE OWNER.THE OWNER AND CONTRACTOR SHALL <br /> COORDINATE A SUITABLE LOCATION ON SITE TO DISPOSE OF THE CALICHE MATERIAL. 04.07.2022 <br /> INERT GENERAL NOTES: SHOULD A SUITABLE LOCATION ON SITE NOT EXIST,THE OWNER SHALL BE RESPONSIBLE <br /> FOR ALL FEES ASSOCIATED WITH REMOVAL AND DISPOSAL OF THE CALICHE. DRAWING: <br /> 6. FINISH GRADE OF ALL PLANTING AREAS IS TO BEI.5"BELOW ADJACENT PAVING UNLESS COVER SHEET <br /> ANGULAR GRANITE RIP-RAP NOTED OTHERWISE, <br /> 1. INSTALL GRANITE RIP-RAP IN ALL DRAINAGE SWALES,AND WHERE INDICATED ON PLANS(TYPICAL).REFER 7, THE CONTRACTOR SHALL BE RESPONSIBLE THAT THESE ARE PROVIDED FOR AND NOT ■ ■ <br /> TO MATERIALS SCHEDULE/PLANTING LEGEND FOR COLOR AND SIZE OF GRANITE RIP-RAP. IMPAIRED WITH OBSTRUCTIONS. <br /> 2. THE CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL 8. THE CONTRACTOR IS RESPONSIBLE FOR GRADING ALL AREAS AT THE DIRECTION OF THE SHEET: <br /> PRIOR TO INSTALLATION. LANDSCAPE ARCHITECT TO CREATE A NATURALLY UNDULATING GROUND PLANE. <br /> DECOMPOSED GRANITE <br /> 1. DECOMPOSED GRANITE IS REQUIRED IN ALL PLANTING AREAS,EXCEPT AREAS OF TURF AND GRANITE <br /> RIP-RAP,AND SHALL EXTEND UNDER PLANT MATERIAL UNLESS NOTED OTHERWISE ON PLANS.REFER TO <br /> MATERIALS SCHEDULE/PLANTING LEGEND. <br /> 2. ALL PLANTING AREAS SHALL RECEIVE A 2"MINIMUM LAYER OF DECOMPOSED GRANITE,THROUGHOUT PAGE: <br /> (TYPICAL). <br /> 3. CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL PRIOR 1 1 OF 19 <br /> TO INSTALLATION. <br /> car i P=�nP®re�w<om. <br />