SECTION - 02900 LANDSCAPE <br /> PART 1 - GENERAL 1.11 WARRANTY PART 3 - EXECUTION PALM TREE PLANTING <br /> 1.01 WORK INCLUDED Submit warranty to Owners Representative. 3.01 GENERAL 3.11 TURF SOD PART 1 -GENERAL a' <br /> O <br /> *Landscape finish grading. 1.01 WORK INCLUDED -O <br /> Trees,Palm Trees,Sa uams and Ocotillos: Install in accordance with the methods,techniques and specifications of each Soil Preparation:Provide soil with an organic matter content of 25-percent to 9 q P Palm tree installation <br /> *Soil preparation Warrant that}reel,palm}reel,saguaros and ocotillos will be alive and in good representative manufacturer.If a conflict occurs between manufacturers and 34percent.Cultivate entire area to a depth of 6"minimum and remove all 1.02 ESTABLISHMENT,GUARANTEE AND MAINTENANCE ~ T <br /> health for a period of 1 year after acceptance except for defects resultingrock in excess of 1 1/2',all building nibble,building construction material waste <br /> *Tree supports these specifications,consult with Owners Representative for a decision, and any other material that will impair satisfactory Per Specification Section 02900. H _ <br /> p from neglect by Owner,abuse or damage by others. p ry growth.This top b"must meet C o 0 <br /> the topsoil requirements noted in Section 2.01. W o <br /> * Contractor to guarantee palms against the vascular disease Penicillium <br /> Planting Do not begin planting until the irrigation system is completely installed,is )vermoeseni,the fungus Fusarium oxysporum,and the root disease �[ '~^ o <br /> Owner must follow Contractors maintenance schedule and provide current adjusted for full coverage and is completely operational. Soil Amendments:Prior to rototillin a Phymla om <br /> * maintenance to to Owners Representative. 1 g r 1 00 Y.,and s at ul rate of lips <br /> per per sf. <br /> Watering 9 Pr Phytophora and similar vascular infections for a period of five(5)years.sf,phosphate at a rate of 21bs per 1.000 sf.,and soil sulfur at 5 Ibs per 1,000 sf. � � � <br /> *Maintenance Remove and replace dead,unhealthy or girdled trees,palm trees,saguaros Rototill into soil. y 'O <br /> and ocotillos that lose original form and size during warrant 3.02 BACKFILL,IMPORTED FILL OR ARTIFICIAL SOIL AND GRAVEL 1.03 RELATED WORK <br /> Definitions: y period with Contractor.Minimum five IS)-years experience in supply and installation of palm O o <br /> Install sod along the straightest edge of turf area.Sfaggerjoinis in a brick-like <br /> material equal to that specified.Replace any material which does not meet <br /> Owners representative-an authorized agent determined by owner to act on Inspect the integrity of all damp-proofing and water-proofing membranes pattern.Avoid trees. U o <br /> requirements within fifteen days of notification.All replacement}reek palm p gaps and overlapping.Place Sod diagonally across,to avoid Foreman:Minimum five 5- <br /> their behalf,in some cases the Landscape Architect may be the owner which occur over,on or against any construction to be fully or partially I ghtl Water sod at least eve 30 min.Juan I I Years experience in related work shall be on site at all <br /> Y trees,saguaros and ocotillos shall be subject to an additional one year g. every g installation.Finish by wafering times. <br /> concealed su earthwork prior to the placement of any imported soil,backfill, li h}I c rn <br /> representative as outlined in these specs. maintenance period. gravel fill or sub-base. g y and roll in two directions w/sod roller. >-I '4) o <br /> Plants-all shrubs and cacti other than trees,saguaros,ocotillos,palms and turf. 3.12 WATERING 1.05 REFERENCE STANDARDS <br /> Plant Material-all frees,saguaros,ocotillos,palms,shrubs,cacti,ground cover, Shrubs and Other Plantings: ANSI 60 W <br /> Correct defects prior to proceeding with the work <br /> Guarantee all other planting will be alive and in satisfactory condition fora Water all plants immediately after planting,except for saguaros,with hose in MAG S.1-American Standards for Nursery Stock. <br /> ANSI <br /> Section 795 U <br /> and other plants. period of 90 days from date of acceptance or will be replaced at no planting hole until material about the roots is completely saturated from the W w S oo <br /> additional cost to the Owner.All plant material shall be maintained in a 3.03 TOPSOIL 1.06 PRODUCT DELIVERY,STORAGE AND HANDLING v <br /> 1.02 RELATED WORK bottom of the hole to the top to the ground to avoid drying out until the entire ,,.,,// •� <br /> healthy,sturdy condition during the warranty period by the Contractor. A.The Owner's Representative or Landscape Architect maybe available to review and lil S o <br /> Import additional topsoil only as required to brio planting areas u to finish planted area is thoroughly watered and the soil soaked}o the full depth of 5 <br /> P p Y q 9 p 9 P tag palms at place of growth and may review palms upon delivery for conformity to <br /> Contractor:Minimum S Years experience in Supply and installation of rode.Spread and cultivate soil so that no settling takes lace at an time. each plant hole.Water stream shall not cause damage to planting hole or V Z a <br /> All replacement plants,including shrubs,cacti,ay maintenance <br /> vines and 9 P g P Y the specifications.Travel to nurseries out of the metropolitan Phoenix areas,when <br /> landscape materials.A Foreman with a minimum of 5 years experience in plant.Keep exposed roots we}by means of moist sawdust,pea}moss a burlap <br /> related work shall be on site at all times. perennials shall be subject to an additional 90 day maintenance period. a}all times during planting operation.Repeat watering as often as necessary requested by the Contractor,will be paid for by the Contractor. <br /> 3.04 LANDSCAPE FINE GRADING to keep the ground moist but not soaked,well below the root system of the B.In lieu of non-local nursery review,the Contractor may elect to provide photographs N <br /> 1.03 SOURCE QUALITY CONTROL PART 2 - PRODUCTS AND MATERIALS plants. with a person adjacent to each palm for preliminary review.Such review shall not <br /> Allow for the addition of soil amendments,conditioners and any specified top impair the right of review and rejection during progress of the work should the palms 13 <br /> Provide certificates of inspection for all materials as required by law or dressing when determining and executing finish grade. 3.13 CLEAN UP not meet specifications. U <br /> h <br /> regulation. 2.01 FILL MATERIALS C.The Contractor must certify that the palms are free of disease prior to shipment. <br /> Set finish grade 1-1/2 inches below adjacent paving,curb and headers for Keep all areas clean and orderly during and after execution of work.Burning of D.After tagging of the palms,remove all thatch from older leaves and cut back all <br /> Package standard materials with manufacturers certified analysis. Provide Provide dry,loose material for fill,backfill,planting backfill and topsoil for shrubs and ground cover beds and areas or as required for installation of trash is not permitted. resulting stems to within two(2)-inches of the base of the trunk.The crown of the CS <br /> analysis by recognized laboratory made in accordance with methods planter beds. Frozen or muddy soils are not acceptable.Salts not to exceed decomposed granite or turf sod. palm shall be reduced per standard nursery practice prior to shipping.Use soft rope <br /> established by the Association of Official Chemists for all other material. 1500 ppm,and material shall be free of debris,noxious weeds,ingredients or 3.14 ADJUSTMENT (organic twine)to tie remaining fronds to protect crown bud.Do not permit fronds ■ ■ <br /> objects detrimental to healthy plant growth.Topsoil: Screened,fertile,friable, At all planting areas,make entire area smooth and even to finish grade. to become damaged by means of restraint. <br /> Provide trees and shrubs grown in a recognized nurse in accordance with Cultivate all areas so that there are no bumps or hollows,and the area drains Prune each tree and shrub to E.Exercise extreme caution while pruning palms to prevent spread of vascular <br /> 9 9 nursery from well drained arable land,free of nut grass,refuse,roots,heavy clay, Preserve the natural character of the plant per <br /> good horticultural practice.Provide healthy,undamaged,vigorous stock as indicated.Grade and maintain all flow lines,designated or not,to allow American Standards for Nurse stock,as published b the American diseases.Dip pruning fools in a sterilizing agent before beginning pruning and before cq <br /> noxious weeds or any material toxic to plant growth;contents as follows: Nursery Y <br /> rown under climatic conditions similar to conditions at project site and free of free flow of surface wafer.Cultivate entire area to a depth of b inches Association of Nurse moving from one palm to another.Do NOT use any chain type saws for pruning <br /> g p j Nurserymen.Prune only as directed by Owners Representative <br /> disease,insects,eggs,larvae and defects such assun-scald,knots,injuries, minimum and remove all rock in excess of 1-I/2 inches diameter,all building and Landscape Architect to remove deadwood,suckers,or broken or badly operations. <br /> a.Silt:20-45% rubble,building construction material,waste and an lattice-type p ydesignedfj Cj <br /> abrasions or disfigurements.Provide trees and shrubs of the sizes indicated. g y other material that will bruised branches.Replace all plants damaged by excessive pruning,planting F. A lattice- a crane,a crane or a s acts)) free crane is <br /> Trees and shrubs of sizes larger than those indicated may be used provided b.Clay:15-20% impair Satisfactory growth, operations or construction damage. acceptable for off-loading and lifting of palm trees.Undersized equipment(i.e. <br /> roots,root ball,staking and planting pits are increased proportionately. c.Sand:30-60% tractor)shall not be used for these purposes.For transporting,the trailer used shall be b, <br /> I.Organic Material(natural or otherwise):2%minimum 3.05 DECOMPOSED GRANITE 3.15 MAINTENANCE PERIOD long enough to avoid damage to the heart of the palm.Loading and unloading of <br /> 1.04 REFERENCE STANDARDS e.pH:7.0-8.3 the palm must be accomplished with the aid of nylon or fabric sling/straps with a <br /> f.Soluble salts:1,500 ppm. Place 2-inches unless otherwise noted,in all planting areas.Decomposed When the Owners Representative and Landscape Architect determine the minimum width of four(4)-inches.Do not use any other type of off-loading <br /> ANSI 60.1-American Standards for Nursery Stock. granite shall extend below all equipment such as metal cables,chains,or ropes that may damage the palm trees. ■ ■ <br /> g.Nutrients:enough to bring levels up to acceptable plant growth. 9 plant material,frees,and cactus.Decomposed work a be substantially complete in accordance with the Conditions p the Excessive scarring or trunk damage due to improper off-loading will be cause for <br /> granite finish grade 1-I/-inch below adjacent paving,curbs,and headers. Contract,Contractor will be advised,in writing,that the maintenance period is rejection of the palms at the project site.During loading and off-loading the palm is <br /> 1.05 SAMPLES Percolation rate shall be between 3 to 4 inches per hour. to begin. to be balanced in the sling to avoid the rootball of the palm from dropping and <br /> Existing top soil may be used provided it meets these requirements. 3.06 HERBICIDE APPLICATION hitting the ground.Any palm handled in an unacceptable manner will be rejected <br /> Submit the following material samples to Owners Representative a minimum of Landscape contractor shall be responsible for maintenance of landscaped and is to be removed from the site. <br /> 48 hours prior to start of work. Apply pre-emergent herbicides in accordance with manufacturers instructions. areas for a period of 90 days.Maintenance includes watering,trimming, G.If the palms are not planted the day they arrive at the project site,the crowns and <br /> 2.02 COMMERCIAL GRADE FERTILIZERS weeding and cultivating of beds. <br /> root ball shall be protected from the sun and from reflected heat from the ground. <br /> a.Topsoil for backfill mix(trees and shrubs). Apply contact herbicides in accordance with manufacturer's Avoid storing on an asphalt surface. <br /> b.Wood Shams s/Mulch. Agri-Sulcult Dispersal-use only for sulfur Landscape contractor,in order to protect his guarantee,shall give typewritten H.Covering material must allow air movement so that heat doesn't build up under the <br /> 0 recommendations.Prior to application,moisten areas for fourteen days to <br /> c.Tree supports. Agriculture grade gypsum to Owner,a complete maintenance instruction booklet on the care and <br /> encourage weed germination and growth.Apply before weeds attain a covering.Do not use plastic or rubberized tarpaulins.Palms may not be stored for <br /> d.Decomposed granite. height of 6 inches.Remove taller weeds manually. feeding of the landscape. more <br /> e Boulders. 2.03 SOIL AMENDMENTS than thirty-six(36)hours.Do not stack palms,but lay them in a single layer on a <br /> . <br /> Areas to be landscaped shall be maintained in weed-free condition at all <br /> Contractor shall request in writing,a Final Inspection with Landscape Architect flat surface.Covered rootballs must be watered lightly every couple of hours. <br /> The Owner's Representative reserves the right to fake and analyze samples of Wood shavings:nitrogen stabilized fir or pine shavings containing 0.75%total times during construction and maintenance period. at the completion of the maintenance period.If the Owner's Representative <br /> materials for conformity to Specification at anytime.Furnish samples upon nitrogen and 0.1 to 0.15%total iron,and under 60 ppm total manganese; determines the work is satisfactory,the maintenance period will end on the PART 2-PRODUCTS AND MATERIALS <br /> request by Owners Representative.Rejected materials shall be immediately composted,leached and aged for a minimum of 10 to 12 months;ph factor, Do not apply pre-emergent herbicides at locations of revegetation seeding. date of the Final Inspection.If the maintenance is unsatisfactory,the 2.01 PALM TREES <br /> removed from the site and replaced at the contractors additional expense. 4'0 to 4.5.no soil amendments are required for salvaged plan}material and The contractor shall manually remove invasive weeds within these areas. maintenance period will be extended,at the Contractors expense,until such A.Palms shall be free of dead or dying fronds,with all fronds of a normal size and color. <br /> cacti unless otherwise specified. fime as all corrections are made and the work is inspected and approved by B.Palms to have straight trunks.The petiole layer shall have been removed by hand '/� <br /> Submit samples of decomposed granite for approval of graduation and color. 2.04 TREE SUPPORTS 3.07 TREE SUPPORT the Owners Representative and Landscape Architect.Retention will not be using the"classic cut'harvesting method,showing a diamond shape trunk W <br /> Sample shall be representative of variations within size and color to be released until Final inspection is made and approval issued by the Owners appearance. <br /> provided. Tree Stakes:Copper napthenate impregnated lodge pole 10 feet in length for y after planting as shown on the Representative. C.Selected palms shall not vary from adjacent palms by more than one(1)-Foot.It is <br /> Guyed Trees:Guy trees as shown immediate) p g <br /> 5 gallon and 15 gallon,and 12 fee}in length for 24 inch box and larger.No drawings. 3.16 FIELD QUALITY CONTROL unacceptable to plant the rootball deeper than the original soil line of the palm. (/') <br /> 1.06 PRODUCT DATA tree stakes are required for salvaged plant material. Staked Trees:Stake trees as shown on the drawings within 48-hours of planting. D.All palms shall be healthy,vigorous and well foliated prior to pruning and show no Z <br /> signs of disease.They shall be free of disease and of insect pests,eggs or larvae. L 7 <br /> o ~ <br /> Submit to Owner's Representative a minimum of 48 hours prior to start of work Tree Ties:Provide a minimum of two per free;No.10 gauge,pliable,zinc Tree supports shall be installed to prevent lodging,yet allow for trunk hours Notify inO advance.Inspections are required,but not limited to,the following:ner's Representative of the requirement for inspection at leas}48 The y shall also have well developed roof systems.All palms shall be free from <br /> w Q LLJ <br /> manufacturers comprehensive product description,including specifications coated iron wire.Cover wire with hose,cover as specified,where it contacts movement.Hoses that encircle trunks shall be large enough to allow for normal physical damage or adverse conditions that would prevent thriving growth. /� J N <br /> and installation instructions. tree. growth of the trunk during the firs}year without girdling. E. Verify that all field-dug palms contain an adequate rootball to guarantee successful v / 0 <br /> Inspection and acceptance of plant material prior to shipping. transplantation.Do not install palms that have damaged rootballs. 1 I 1 Z_ <br /> At completion of rough grade and boulder placement F. A maximum of twelve inches(12")of aerial(air)roots should be visible when the palm LU = <br /> 1.07 CERTIFICATES AND TEST REPORTS Hose Covering:1/2 inch minimum diameter;2-ply reinforced rubber,new 3.08 TREES,SHRUBS,AND VINES . At completion of landscape finish grading and soil preparation,prior tree is planted in the ground. U J LUJ to <br /> garden hose. to planting. L Q <br /> Provide and pay for all materials testing.Testing agency shall be acceptable Layout locations with stakes or gypsum.Coordinate with Owners . At installation of irrigation system,prior to backfilling trenches and 2.02 ACCESSORIES: Q <br /> to the Landscape Architect.Submit to Owners Representative a minimum of 48 Tree Guards:'ArborGard+'by Deep Roo},or equal. Representative to assure appropriate location,prior to installation. planting. A.Clean,washed river sand(CONCRETE SAND WILL BE REJECTED) <br /> hours prior to start of work 2 copies of certificates of inspection as required by . During installation of specimen tree,or other specimen plant B.Frond Ties:Minimum of one-half(1/2)-inch diameter soft sisal rope capable of \ Q H <br /> governmental authorities,and manufacturers vendors certified analysis for soil Tree Guys: Minimum 3 per tree;No.10 galvanized wire.Cover wire with hose Test drainage of plant beds and pits by filling with water.Notify Owner's material. LU <br /> where it contacts tree for 24,30 and 36 box tree. Re maintaining fronds n tied position for one(I)-year year \ Z <br /> amendments,fertilizer materials,and chemicals.Submit other data presentative of areas where wafer is retained more than 24 hours. . After staking locations for plant holes,but prior to planting;for � � Q W <br /> C.Fungicides:Soil Drench Subdue by CIBA-GIEGY <br /> substantiation that materials comply with specified requirements. approval. D.12-48-8 water-soluble fertilizer. <br /> Certificates are required to determine the quality and quantity,of all specified Anchors(Deadmen):2 inch x 4 inch x 3 fee}long;construction grade Where rock,underground construction or other detrimental conditions are . Darin the planting 7 W During p g process. L <br /> soil amendments. redwood. encountered at plant pits,Owners Representative may select alternate . oaring the placement and aiming of all light fixtures. PART 3-EXECUTION _location. . At Substantial Completion of the Work. LJJ <br /> Materials certification to be submitted include,but are not limited to:Topsoil Signals(Flags):For guy wires,1/2 inch diameter,white or orange plastic tubing , 3.01 SEQUENCING AND SCHEDULING <br /> P During warranty period to observe maintenance procedures. <br /> source and nutrient analysis,mulch,fertilizers/soil amendments/chemicals. 5 fee}long over each guy used. Do not expose roots to air except during transplanting.Se}up of plants at . At foal Completion of the Work. Coordinate delivery of palms with planting operations to avoid on-site storage longer <br /> Test representative material samples proposed for use.Provide the following same level when planted as in the container.Cut plan}containers on 2 sides than thirty-six(36)hours.Planting delays will result in rejection of the palms. 1 1 <br /> data: 2.05 HERBICIDES without injuring root ball and carefully remove plant.Do not cut container with U_ <br /> Pre-emergent and contact Herbicides: spade.Damaged plants will be rejected. 3.02 PREPARATION OF THE SITE <br /> a.Topsoil and planting backfill. Protect existing plant material,walls,pavements,and other site amenities from <br /> b.Soil PH. Dig pits with perpendicular sides to a minimum of 2 to 3 times the width(see damage.Verify and maintain all clearance requirements for both overhead and <br /> Pre-emergent herbicide shall be Surflan as manufactured by Dow/Fiorito details of the root ball for containerized trees and shrubs.Di pits only as deep underground utilities. <br /> c.Particle size,percentage soil texture. Chemical Company. ) g NOTE: g <br /> d.Percentage organic material. as the root ball to prevent settling of the tree or shrub. <br /> I.Percolotinrate. Washington State Requirements supercede these 3.03 EXECUTION OF PLANTING <br /> f.IN level analysis. Contact herbicide shall be Round-up as manufactured by Monsanto. Place rootball of vines as close to Structure or support system as possible.If Lay out palms at locations as shown on the plans.The Owner's Representative will <br /> g.All macro,secondary and micro nutrient salinity. rootball can't be placed closer than 12"notify Owners Representative of landscape specifications.Contractor to notify check iota}ion of palms in the field to verify exact position before planting begins. <br /> h.ESP. situation for inspection and remedy. <br /> 2.06 PLANTING MATERIAL Greey Pickett of any changes. <br /> L Free lime. The Contractor shall be responsible for accurate layout where palms are to be <br /> Plant Material:Healthy,shapely and well rooted.Roots shall show no evidence Tie vines to trellis supports if applicable with green plant tape and remove any pre-planted to permit the installation of site improvements around them.The <br /> Recommendations on of having been restricted or deformed at any time.All plants shall be staking p p protection of these alms while work is taking <br /> type and quantity of amendments required to bring g supplied with Ian}material. Contractor shall be la responsible for the p g <br /> levels into acceptable ranges as detailed in Part 2-Products of Materials of representative of their normal species and variety.They shall have normally place.Provide regular irrigation as necessary until final acceptance. <br /> these specifications. developed branch systems.Plants shall be free from disfiguring knots,sun scald Planting Mixture:One part wood shavings Two parts excavated soil amended <br /> injuries and abrasions of bark.Plants not meeting these requirements shall be to meet standards in Part 2. The Palm tree excavation shall be as depth as shown on the details and one(1)foot <br /> considered defective and shall be replaced immediately.All plants shall be wider than the root ball.The Owner's Re ■ ■ <br /> Separate recommendations to be submitted for each crop.Crop}o be Representative shall approve the depth of the pit <br /> Identified as: true to name and shall be tagged,one of each variety.All plant material shall Mix thoroughly outside the hole before start of backfilling. prior to planting. <br /> a.Irrigated trees and shrubs. be grown in nurseries inspected by the State Department of Agriculture unless R E V I S 10 N S: <br /> otherwise approved by the Owners Representative. Tree Guard:Install tree guard on all trees located in turf areas per Water-test each tree it for drainage b filling the holes twice in succession with water. <br /> b.Turf. 9 p 9 Y 9 <br /> 1.08 MAINTENANCE DATA Provide"S"Specimen"plants with a special height,shape or character.Tag at manufacturer's recommendations. If,when filled with water the second time,the pit fails to drain within twenty-four e l Q <br /> P P P 9 P 9 hours,than additional excavation a necessary to break through the impermeable layer <br /> the Source of supply prior to notifying Landscape Architect for inspection.The 3.09 BACKFILLING and then provide a thick layer of sand below the root ball. <br /> Submit to Owner's Representative 2 copies of typewritten instructions,prior to Landscape Architect shall inspect selections at source of supply for suitability <br /> expiration of the initial maintenance period,recommending procedures to be and adaptability to selected location.When specimen plants cannot be Backfill plan}pits and form shallow basin around the plant to hold enough Before planting,the crown of each tree is to be treated with a SUBDUE 2E(1 tsp/gallon) <br /> followed by the Owner for the maintenance of landscape work for one full purchased locally,provide sufficient photographs of proposed material for water to saturate the root ball and backfill(only form basins if specified on PROJECT#: <br /> year. drench and an QRNALIN(1/2 ounce/gallon)drench. <br /> approval. detail).Wafer plants immediately after planting and allow backfill to settle in CAR 107 <br /> plant pit.Do not water saguaros after planting.Do not raise basin rim above Clean,moist river sand shall be added to the bottom of the tree pit and tamped or <br /> 1.09 PRODUCT DELIVERY,STORAGE AND HANDLING Plants may be inspected and approved at place of growth for compliance surrounding grade. water-jetted prior to planting of the palm. SCALE: <br /> with specification requirements for quality,size,and variety.Such approval NTS <br /> Deliver packaged material in containers showing weight,analysis and shall not impair the right of inspection and rejection upon delivery at the site or Puddle planting mixture when pit is 2/3 full of plant mix.Continue back filling to Install drainage and viewing pipes)in each pit to assure waiting of the whole root ball <br /> Identification of manufacturer.Protect materials from deterioration at all times. during the progress of the work. within 1 inch of surrounding grade. and to enable monitoring and viewing of the tree pit chamber.The vents shall be four ISSUED FOR: <br /> Provide rotective covers to plant life and trees during delivery.Do not rune 2.07 TURF SOD Finish grade}o 2 inches below headers or concrete work. tree <br /> inch diameter a with tad PVC,with sufficient length to extend to the bottom a the REVIEW <br /> p p g ry. p tree pit.Wrap pipe with filter cloth.Loosely cap fops of pipes and glue bottom caps. <br /> trees prior to delivery.Do not bend-tie trees or shrubs in such a manner as to The top caps are to be held above finish grade and painted to match the adjacent DRAWN BY: <br /> cause damage or destroy shape.Deliver materials after preparation for As noted on plans. Top dress planting areas with 2 inches of top dressing after planting. surface material.Do not backfill drainage or viewing pipes. <br /> morelng have been th n 6 hours after dell ery,se}pla immediately. <br /> n}material in shade,profit protect <br /> from for 2.08 DECOMPOSED GRANITE Treat all planting areas with a pre-emergent. Backfill shall be two-thirds(2/3)clean,washed river sand amended with one-third 11/3) TEAM <br /> DATE: <br /> weather and mechanical damage and keep roots moist. native soil.In areas where soils are heavy in caliche additional sand may be added. <br /> Decomposed granite coverage shall be a minimum 2-inch thickness unless 3.10 GROUND COVER The slower the water percolation rate,the deeper the layer of sand that must be used 04.07.2022 <br /> Do not remove container grown stock including ground cover,from containers noted otherwise on plans.Decomposed granite shall be the size and color as beneath the root balls. During and after placement of the palm,moistened sand shall <br /> until planting time. specified on plans,and shall be taken from a single quarry. At time of transplanting,soil in flats shall be sufficient so as not to fall apart when be thoroughly tamped as backfill is being added to assure stability of the tree. DRAWING: <br /> lifting plants.Plant each plant with its proportionate amount of the flat soil in a LANDSCAPE SPECS <br /> 1.10 SITE CONDITIONS 2.09 BOULDERS manner that will ensure a minimum disturbance to the root structure. A six(6)-inch deep swale shall be made around each palm tree to provide <br /> Boulders are to be Surface Select or as noted on the plans.Boulder size as water-holding capability. ■ ■ <br /> Determine location of underground utilities.Execute work as required to Plan}flat material sufficiently deep to coverall roofs.Firmly tamp the earth <br /> noted on the plans and approved by the Owner's Representative.Boulders are around each plant to force out large air pockets. Apply a two(2)-inch layer of mulch planting plans)in all palm tree water basins, S H E E T: <br /> prevent damage. to be harvested,delivered and placed in a manner to avoid marking,scrapin P 9 P (1 Y (Per lantin Ions <br /> 9 being careful to not allow mulch to fall into drainage or viewing pipes. <br /> Maintain grade stakes set by others until directed otherwise. or damaging the natural condition of the boulder.All scarred boulders are to A <br /> be treated with Permeon(or equal)to provide a natural appearance of the After planting,the crown buds of all the palms shall be within one(1)-foot of the j(v')S <br /> Protect all existing plant life not scheduled for removal.If any plant material desert vamish. designated palm tree height above finish grade. <br /> that is to remain is damaged,the Contractor,at his expense,will pay for a 2.09 SEED MIXTURE <br /> replacement plan}of the same size and species(to be approved by Owners After planting,drench soil with the fungicide"SUBDUE"per Manufacturer's <br /> Representative). As noted on plans. recommendations by flooding the planting basin.Reapply as often as label permits PAGE: <br /> throughout the maintenance period.Fertilize palms with a water-soluble,12-48-8 1 8 O F 1 9 <br /> Protect existing utilities,paving and other facilities from damage during solution at a rate of eight(8)-pounds per 100 gallons. <br /> landscaping operation. ■ ■ <br /> Coordinate with other contractors. men222.nb. <br />