Laserfiche WebLink
3�, SECTION 14, T 28 N, R 4 E, W.M. LU <br /> d I— <br /> IY a a. 0 <br /> _ N <br /> •£w N <br /> a 3 <br /> + _N O 0 <br /> d (D <br /> >IY N <br /> LU N <br /> aa— N N <br /> O 3 Z <br /> _T m O <br /> C1 y 0 <br /> LU <br /> W 6 <br /> w <br /> >a <br /> u SEE FOUNDATION <br /> SECTION 2a2 L" PK200 LED Light Pole Kit with Single 200 Watt LED Light <br /> f ® 2 PVC <br /> CO <br /> NDUIT(TYP) <br /> 2 <br /> SINGLE OR DOUBLE MAST CONDUIT PER �"� roaldaak, m.: <br /> 5 <br /> ARM AS PER PLANS 1 PLANS(TYP) 4 xe ll a II "mme,<kl-arae.uo Wne rokns.,enhMdw6: <br /> STA&OFFSET OF a _ _ naa ersn;;Rp (opt0<ee <br /> BUSHING REQUIRED ON 2 =_____ __ i o rwle.s,�e unl;RM<on.vkw.un meunu"Rbruser.ea l..ra.,n, <br /> ru — aMro burrs anaa wxwve., loutional <br /> FOUNDATION PER ALL CONDUIT ENDS <br /> CONSTRUCTION PLANS ] E <br /> IUNCf10N BOX 7 _ z 6.z^ <br /> TYPE PER 9wh:Cammer<lal xrede sceel wltn minimum ylek s[renpn a155,p00psl. OheR Mounting Bracket <br /> BASE PLATE PLANS(TYP) 7e1 a za h.yaks:r:gaaw x 13,awe:zs n.yaks:a"sRaare x T Raage; <br /> 4 2"GROUT "voles:r swan x z gaaxe <br /> FACE OF CURB FACE OF CURB exeyne:staaaa.e pak nereniussh.opxamine R.,is ane 30 h.ams are zo <br /> 1/2"EXPANSION JOINT IF CONDITION 1 CONDITION 2 <br /> ar4Pai•ameRe sleelaMn«beluxaradded, <br /> FOUNDATION IN SIDEWALK 181,MIN FJ n«fiorfrol mdeaRszaanandx Wme�R <br /> CLR vok:.1W aaR ordewned m lx rare-11"eon..kL <br /> LEVELING NUTS _un vdas ,eah ogeeIsknee eaae mr Jos-wear—) <br /> —� a—k:Hil—W k bored I.-above[M1e ease pate br 35 fr,30h aM 15 ft wk. <br /> z 1"abweenebase plate lw 30h ppk. C i <br /> ee. <br /> 3. 10 X V k,Is. and 25 h.w.il3 30 x V kpd>. <br /> . Z <br /> 00 '' a wnppx r:A.I.su<nax<wo wnn rweu. <br /> e 2"PVCCONDUR _Jul s m:Awmim,m<ameramipa wim kkRraed nasbm.oa.ae nea ehaipaxaa. <br /> 8-g7 VERTICAL BARS <br /> EVENLY SPACEDszm swoop <br /> z_ z volsrye:110231VRIestaneaM.200dep Vpnogim as special weer. 0 0 <br /> 2"CLR #4 HOOPS ON 12"CFR u u araer_ Pole q <br /> COMMERCIAL e v mndbpdm:T w3mnm 1w 1xo'vtbp eve<kbo.eer k Height <br /> 3' CONCRETE CONDITION 3 NOTES: w<.x:om;p"ITWI,`/L,6php It N <br /> SO O.R.UND ;:uLw OimmlaR capabk.0immbR wapd aat prwmee lfieb msmp. '"� <br /> 4 ANCHOR BOLTS I"x 36NN+ 1. IF POLE FOUNDATION FALLS WITHIN SIDEWALK AREA,TOP OF FOUNDATION WILL BE unear«ww Eocamas, <br /> AST,F 1554 GRADE 55 FLUSH WITH FINISHED SIDEWALK AND BE FINISHED IN THE SAME MANNER AS SIDEWALK. <br /> FOUNDATION SECTION ..IIs`"` "" ^ o <br /> 2. 1/2"EXPANSION JOINT WILL BE PLACED BETWEEN FOUNDATION AND SIDEWALK. up.xarxy:lop,000noars ozRl ®®O Q <br /> CONDITION� weipnc 151�, <br /> BASE PLATE&BOLT CIRCLE NOTES: ®POLE&FOUNDATION NOTES: PLACEMENT NOTES: °n elm Tmd lam , aelAmpa M WiM RaOng LIIr��' m oN <br /> law 15 h.30 h,]Sh 30h F�`io <br /> 1. BASE PLATE PER POLE FABRICATOR'S 1. THE TOP 12"OF ANCHOR BOLTS SHALL BE GALVANIZED. 1. CONDITION 1&2 ARE NORMAL INSTALLATION OPTIONS DEPENDING ON STREET DESIGN. zm m r n <br /> DRAWINGS: zgo ss.sop 1.6T en 140 mph 11 mpn <br /> 2. CONDITION 3INSTALLATION IS ALLOWED WITH APPROVAL OFCITY ENGINEER WHERE Handnok ewer N <br /> Z. FOR ALUMINUM POLES,BOLT CIRCLE IS 2. INSTALL 2"x 1"REDUCING WASHER AND 1"CONNECTOR TO SECURE EXISTING R/W OR PHYSICAL CONDITIONS WARRANT THIS TYPE INSTALLATION. <br /> ¢ 11-1/2"+/-1/2". CONDUCTORS,AND COIL 30"OF CABLE FOR FUTURE CONNECTION AT END <br /> OF MAST ARM. <br /> 3. FOR STEEL POLES,BOLT CIRCLE IS z'Sa 111" (21"far <br /> DEPENDENT ON TYPE AND HEIGHT OF 3. FOR DOUBLE MAST ARM INSTALL 2ND CABLE BETWEEN LUMINAIRES WHEN CITY OF EVERETT TO'P01e1 2-Piece <br /> Bx POLE. BOTH LUMINAIRES ARE ON SAME CIRCUIT. Base Cover <br /> PUELIC YrORKS DEPARTMENT tEO Fdmn leonom mewl ibo Rxmre Rop urewl <br /> 4. CONDUCTOR ATTACHMENT BRACKET PER WSDOT/APWA STD PLAN J-28.50. w`A—sm Pav`Txuna. "�� _ ease place Anchor edit <br /> S. PLACE POLE AND BRACKET CABLE IN CONDUCTOR ATTACHMENT BRACKET. STREETLIGHT 11/14/2018 I I I ease elate <br /> B STRIP OUTER CABLE SHEATH BELOW BRACKET AND CONNECT TO FEED eon acne - rpk Ne;gnt Flo. Anmor N <br /> 1 E CABLE WITH QUICK DISCONNECTS. POLE&FOUNDATION DETAILS H12 3 <br /> l &PLACEMENT CONDITIONS g onle can �/'� a0 <br /> Pole Nd ns ease Plate Oim Slot Oim 15 h,Nlh 3/4411"r3• VJ 00 <br /> 1535h h.10SRa0.15'099x3.5 ]Sh 3/4'x30"e3• w Z <br /> 'Sex1' 1.15'a LY I1.0' 30h 1'x36'k4• <br /> my n mmaepeanammamwyen wesuMewlwusmeno,xe.skk Pokrwmn:n".nw � C F <br /> Copyright©2020 Energy Light,In All Rights Reserved 11881 Rose Road,Lake Zurich,IL 60047 0 <br /> OE <br /> 3 W a W Z <br /> LU <br /> N QQLJJ <br /> U U) LU <br /> c' <br /> z U <br /> O <br /> 16 <br /> Qw � <br /> WLL - <br /> U <br /> V <br /> z <br /> w <br /> w <br /> z <br /> C1 <br /> W <br /> THE CONTRACTOR SHALL BE FULL, <br /> 0 RESPONSIBLE FOR THE LOCATION AND <br /> 6 PROTECTION OF ALL EXISTING <br /> U <br /> UTILITIES AND SHALL VERIFY ALL <br /> O UTILITY LOCATIONS PRIOR TO <br /> CONSTRUCTION BY CALLING THE: <br /> 4 UNDERGROUND LOCATE LINE: <br /> 811 <br /> A MINIMUM OF 48 HOURS PRIOR <br /> m TO ANY EXCAVATION <br /> Rd <br /> 10 <br /> 0 <br /> °a <br /> U <br /> O l�0 DIIV <br /> A� <br /> m <br /> w <br /> shoo w <br /> w `S'ORAL E� IV1+y,RFGISTERF,9 Gti2 <br /> 3 <br /> LL <br /> JOB NO.: R313078.01 <br /> DATE: 04/13/2022 <br /> J DESIGNED:D.BAGLEY <br /> M <br /> a � DRAFTED: D.BAGLEY <br /> ED Of CHECKED: B.DUNNING <br /> SCALE: AS SHOWN <br /> a o <br /> 3 DRAWING NO. <br /> _° C3.3 <br /> N <br /> v = SHEET: 8 of 1 <br />