Laserfiche WebLink
HUITTZOLLARS <br /> HUITT-ZOLLARS,INC. • 1102 Broadway,Suite 301 . Tacoma,WA 98402 . 253.627.9131 phone • 253.627.4730 fax . huitt-zollars.com <br /> Table of Contents <br /> SECTION 1: PROJECT OVERVIEW..............................................................................................................1 <br /> SECTION 2:CORE REQUIREMENTS SUMMARY.........................................................................................1 <br /> SECTION 3: EXISTING CONDITIONS SUMMARY........................................................................................3 <br /> SECTION 4: PERMANENT STORMWATER CONTROL PLAN ........................................................................5 <br /> SECTION5:OFFSITE ANALYSIS..................................................................................................................6 <br /> SECTION 6:CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN...........................................6 <br /> SECTION 7:SPECIAL REPORTS AND STUDIES............................................................................................7 <br /> SECTION 8:OTHER PERMITS.....................................................................................................................7 <br /> SECTION 9:OPERATION AND MAINTENANCE MANUAL...........................................................................7 <br /> List of Figures: <br /> Figure1:Vicinity Map..........................................................................................................11 <br /> Figure 2: Existing Surfaces....................................................................................................12 <br /> Figure 3: Proposed Surfaces .................................................................................................13 <br /> Figure 4: New and Replaced Hard Surfaces...........................................................................14 <br /> Figure 5: New and Replaced Pollution Generating Impervious Surfaces (PGIS).......................15 <br /> Figure6: Offsite Map ...........................................................................................................16 <br /> Figure 7: Demolition and TESC Plan ......................................................................................17 <br /> Figure 8: Grading and Drainage Plan.....................................................................................19 <br /> Figure 9: Flow Chart for Determining Requirements for Redevelopment...............................21 <br /> List of Appendices: <br /> APPENDIX A:SUPPORTING FIGURES......................................................................................................9 <br /> APPENDIX B: NRCS SOILS DATA...........................................................................................................23 <br /> Fairway Estates MHC Entry Huitt-Zollars <br /> Stormwater Drainage Report December 15,2023 <br /> Everett,Washington Page v <br />