My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1427 100TH ST SW 2025-03-03
>
Address Records
>
100TH ST SW
>
1427
>
1427 100TH ST SW 2025-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 8:42:44 AM
Creation date
1/24/2025 3:44:07 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1427
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1: Describe the project during construction <br /> Nature and purpose of the construction project: <br /> The proposed project includes the widening of the entrance to Fairway Estates <br /> MHC, vehicle entry and exit gates including opening mechanisms and entry call <br /> box, pedestrian gate, feature wall and columns, and entry signage. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roadsthat <br /> might be affected by the construction project: <br /> No impacts are expected to adjacent areas. <br /> How upstream drainage areas may affect the site: <br /> Upstream drainage will remain unchanged and will continue to be collected and <br /> piped to the existing east-west storm drain along 100th St SW. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> The existing piped system to which our project connects, flows along 100th St SW <br /> to a ditch on the south side of the road that continues the stormwater flow to <br /> Swamp Creek about 330' to the west of the site. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> We do not believe there will be any stormwater related issues to any critical areas <br /> within 1/4 mile of the downstream system. All stormwater on the site is proposed to <br /> be collected and treated in Contech catch basin to be sent off site through existing <br /> storm drainage lines. <br /> Special requirements and provisions for working near or within critical areas: <br /> None. <br /> Areas on the site that have potential erosion problems: <br /> None <br /> Locations where surface water leaves the site: <br /> Stormwater is picked up by a catch basin at the southwest corner of the site along <br /> 100th St SW. This catch basin is piped to an existing catch basin and flows off-site <br /> in an existing piped system located east-west along 100th St SW. <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP) Template for Small Projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.