Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/10/2022 8/10/2022 ELEC 02-GROUND MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WORK WICKLANDER APPROVAL <br /> Notes: <br /> 8/9/2022 3:03 PM E C COMPANY <br /> Contact Name:Harry <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2068332449 <br /> e-Mail:harry.stayner@ecpowerslife.com <br /> (8/10/2022 3:19 PM MHW) <br /> ok ditch rough in:4)1 1/4"conduit; 1-data 1-power for gate controls.times 2. <br /> conduits start at the eastern hand hole and go west to new hand hole location <br /> plan is to intercept existing conduit and reroute the conductors to accomidate the new construction without interuption of service. <br /> 10/7/2022 10/7/2022 ELEC 02-GROUND MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WORK WICKLANDER APPROVAL <br /> Notes: <br /> 10/5/2022 1:29 PM E C COMPANY <br /> Contact Name:Kevin Lindsley <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:Kevin.lindsley@ecpowerslife.com <br /> mhw changed Inspection Type from ELEC 09-OTHER to ELEC 02-GROUND WORK <br /> 3x4"conduit and 4) 1"&:2)1 1/2"conduit at new building lines. <br /> 10/14/2022 10/14/2022 ELEC 02-GROUND MICHAEL PARTIAL <br /> WORK WICKLANDER APPROVAL <br /> Notes: <br /> Contact Name:Kevin Lindsley <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:Kevin.lindsley@ecpowerslife.com <br /> Ok ditch rough in ATS A,ATS B,SWITCH GEAR GENERATOR STUBS IN SIDE BUILDING LINE,3)4"and ground wire in duct bank.And added 2)1"in north <br /> duct bank <br /> ELEC 02-GROUND MICHAEL PARTIAL <br /> 11/9/2022 11/9/2022 WORK WICKLANDER APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 11/8/2022 9:55 AM E C COMPANY <br /> Ditch cover for concrete duct bank <br /> Contact Name:Kevin Lindsley <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2066407734 <br /> e-Mail:Kevin.lindsley@ecpowerslife.com <br /> Approve 8)3"GRC,10)3/4")10)1"GRC from existing building to slab of the new building ditch rough in. <br /> Approve 8)3"GRC,10)3/4")10)1"GRC from existing building to slab of the new building ditch rough in. <br /> I <br /> Printed: Monday, 27 January,2025 2 of 6 rk <br /> SUPERION <br />