Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 1/20/2023 1/20/2023 ELEC 03- MICHAEL PARTIAL eTRAKiT Inspection Request <br /> SLAB/CONDUIT I WICKLANDER APPROVAL <br /> Notes: <br /> 1/18/2023 2:35 PM E C COMPANY <br /> Contact Name:E C COMPANY <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:chue.moua@ecpowerslife.com <br /> approve slab work in the building:branch circuits from panel A; 14)branch circuits;feeders to transformer A;camera locations to camera conduit's <br /> coming from the security cabinet in the northeast corner,to security cabinet and on to com cabinet. <br /> Primary and secondary side of a transformer,GEN line and load side of the MTS and block heater/battery charger conduits. <br /> 1/24/2023 1/24/2023 ELEC 03- MICHAEL CANCELLED as noted <br /> SLAB/CONDUIT WICKLANDER <br /> Notes: <br /> 1/23/2023 12:43 PM E C COMPANY <br /> Contact Name:E C COMPANY <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:chue.moua@ecpowerslife.com <br /> Cancelled per Chue w/EC co. <br /> 1/24/2023 1/24/2023 ELEC 02-GROUND MICHAEL PARTIAL as noted <br /> WORK WICKLANDER APPROVAL <br /> Notes: <br /> 1/23/2023 12:43 PM E C COMPANY <br /> Contact Name:E C COMPANY <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:chue.moua@ecpowerslife.com <br /> 3x 4"from stub at roadway to vault location near Highway place substation at S.W.corner of the site. <br /> 1/24/2023 1/24/2023 ELEC 04- MICHAEL PARTIAL as noted <br /> GROUNDING WICKLANDER APPROVAL <br /> Notes: <br /> 1/23/2023 12:43 PM E C COMPANY <br /> Contact Name:E C COMPANY <br /> Site Address:6001 EVERGREEN WAY <br /> Phone:2062423010 <br /> e-Mail:chue.moua@ecpowerslife.com <br /> Approve 3)ground rods w/2/0 copper stubbed to new building on the south side of foundation wall <br /> I <br /> Printed: Monday, 27 January,2025 4 of 6 rk <br /> SUPERION <br />