My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10915 16TH AVE SE 2025-02-28
>
Address Records
>
16TH AVE SE
>
10915
>
10915 16TH AVE SE 2025-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 3:21:51 PM
Creation date
1/27/2025 1:44:06 PM
Metadata
Fields
Template:
Address Document
Street Name
16TH AVE SE
Street Number
10915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITSUBISHI ELECTRIC TRANE HVAC US: CITY MULTI VRF OUTDOOR UNIT SCHEDULE <br /> Nom System Refrig Pipe Dim Electrical-Per Module <br /> Connected Design Cooling Design Heating High/Low Corrected Corrected 208/230 or 460 <br /> [Nominal Cooling Nominal Heating Cooling Efficiency Heating COP @ Capacity(%of Outdoor Temp Outdoor Temp Pressure(inch) Cooling Total Heating Capacity Sound Pressure MCA 208/230 orS stem Ta Ta Reference M-NET Address Model Number Modules icitBTU/h Ca aci BTU/h I EER SEER EER2 SEER2 47-F HSPF NOM DB °F WB °F See Note 4 Ca aci BTU/h BTU/h dBA Voltage/Phase [460VI RFS MOCP Notes/O tions206/230V/1-CU-1 CU-1 N/A MUZ-GS09NA-U1 00 10,900 15.4[27] 15.4[28.4] 4.44[12.81 100.0% 85.0 20.3 1/4/3/8 9,405.7 6,365.9 48/50 phase 10 15 15 1,2,3,4,5 <br /> Notes&Options: <br /> 1 Nominal cooling capacities are based on indoor coil EAT of 80/67°F(DB/WB),outdoor of 95°F(DB) <br /> 2 Nominal heating capacities are based on indoor coil EAT of 70°F(DB),outdoor of 43°F(WB) <br /> 3 Efficiency values for EER,IEER,COP are based on AHRI 1230 test method for mixture of ducted&non-ducted indoor units, <br /> 4 For systems with multiple modules,refrigerant pipe dimensions indicate total system combined piping downstream of module twinning <br /> 5 Added field charge listed is in addition to factory charge,this must be updated based upon final as-built piping layout <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.