Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2410-123 Description: UPGRADE TO A NEW 200A MAIN BUSS/W NEW 200A <br /> MAIN BREAKER <br /> Applied: 10/11/2024 Approved: 10/14/2024 Site Address: 6 77TH ST SE <br /> Issued: 10/15/2024 Finaled: 12/23/2024 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: Brooklyn Moose <br /> Parent Permit: Owner: DUBOSE DAWN M <br /> Parent Project: Contractor:TML INTERNATIONAL LLC(ELEC) <br /> Details: <br /> UPGRADE TO A NEW 200A MAIN BUSS/W NEW 200A MAIN BREAKER <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/23/2024 10/23/2024 ELEC 05-SERVICE** MICHAEL APPROVAL eTRAKiT Inspection Request <br /> WICKLANDER <br /> Notes: <br /> 10/18/2024 1:24 PM Mary Dinsmore-Smith <br /> Contact Name:CORIN REINKE <br /> Site Address:#6 77TH ST SE <br /> Phone:5039913730 <br /> e-Mail:permit@infinitysolarusa.com <br /> Approved service branch circuits aren't ready yet.It'll be taken care of when they do the solar final. <br /> Verify the removal of the NMC cable going into the ground and a conduit this is a violation of the NEC. Even though it is existing,it has to be removed. <br /> 12/23/2024 12/23/2024 ELEC 10-FINAL** MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 12/13/2024 3:07 PM Mary Dinsmore-Smith <br /> PLease have the inspector call Dawn to give her a window time of the inspection <br /> Contact Name:Dawn Riggs <br /> Site Address:6 77TH ST SE <br /> Phone:4257374344 <br /> e-Mail:inspections@infinitysolarusa.com <br /> Approved panel swap. <br /> I <br /> Printed: Monday, 27 January,2025 1 of 1 rk <br /> SUPERION <br />