Laserfiche WebLink
Proposal <br /> Front Loading PosterGrip Frames <br /> Mounting method when mounting directing to the building - <br /> Wood-wood screws 1"-1.1/2". Mounting holes will be pre drilled from internal <br /> Eifs stucco- Molly wall anchors. Mounting holes will be pre drilled from internal <br /> Concrete- Molly wall anchors. Mounting holes will be pre drilled from internal <br /> Glass-3m VHB tape(double sided high strength acrylic foam tape) no drilling <br /> needed.Attached behind snap frames <br />