Laserfiche WebLink
ADT Commercial • pored by Experience. <br /> Driven by Excellence." <br /> March 30,2023 ECIEIVEm <br /> Project: R <br /> Fire Alarm Panel/Communicator Upgrade APR3 2023 J <br /> Hobby Lobby#0492 <br /> 10011 Evergreen Way <br /> Everett,WA 98204 CITY OF EVERETT <br /> Permit Services <br /> To Whom it may Concern, <br /> The Scope of Work shall be to upgrade the existing FACP and the addition of a new Cellular Sole Path Communicator to replace <br /> POTS lines. <br /> No other changes shall be made to the fire alarm system, occupant load,occupant type or the structure under this work order. <br /> A complete system test shall be conducted,with all signals being verified and an NFPA 72 Record of Completion form shall be <br /> created, presented to the customer and kept on file with ADT Commercial. <br /> If any system deficiencies/impairments exist,they shall be recorded and corrected as required upon an approved work order from <br /> the customer. <br /> If there are any questions or concerns, please contact me at your earliest convenience. <br /> Sincerely, <br /> Don J.Taylor, SET <br /> Quality Control Engineer III <br /> ADT Commercial <br /> NICET IV Certification#116320 <br /> djtaylor@adt.com <br /> 972-835-3901 <br /> Supporting documentation included: <br /> NICET IV Certificate <br /> Equipment Data Sheets <br /> Submittal Drawing w/Battery Calculation <br /> 1501 YAMATO ROAD, BOCA RATON, FL 33431 adt.com/commercial <br /> 2rC1?}DUI C.. nor_ . 11.,1 <br />