Laserfiche WebLink
r BOGARD I PASCUA <br /> (E MBUSTIONAIR ENGINEERS,PS <br /> (E)PAN DP2A UVMB IN CONSULTING ENGINEERS <br /> 1 7 1 8 19 2212111N AVe"ue SE,suite llI <br /> (E)PANEL CP2 (E)1l2" (E)2" Bom 42w 1 4100 zt <br /> 6"CWR FC-1 OUTLET A 42S 15b100 <br /> FC-1 BUTTERFLY VALVE DISCONNECT GAS PIPING n c c <br /> 6"CWR FC-1 INLET AND VENT AND DEMO UNIT <br /> c HEATER AND SUPPORTS (E)UH-1 4E)1-114" <br /> s (E)ET- ON FLOOR W OC <br /> / B <br /> (E)FIRESPRINKLERRISER <br /> (E)ENCLOSURE FENCE �F EXISTING WATER HEATER, <br /> (E)DISCONNECTS DEMO EF-6 v (E)1" PUMP AND ASSOCIATED <br /> AND CONTROLS ON ROOF PIPING TO REMAIN " <br /> EXTEND NP WATER MAKE-UP �ffjs __ �'I�- -� (E)314"IG P a 2736 �e <br /> n TO CONNECTION POINT AT FC-1 -, - �, I 1' o f FGIy�Ew G\a� <br /> 2"DRAIN TO DEMO HEAT EXCHANGER,REMOVE X ' 1 R - -'_ _ DISCONNECT PIPING AND Ss/pNA EN <br /> AREA DRAIN n (E)CONCRETE BASE PAD HOUSEKEEPING PAD AND PATCH i = i I Iti r------ DEMO CONDENSER WATER <br /> FLOOR TO MATCH EXISTING 4 I �� h_r- -I 1 I PUMPS AND BASES <br /> I I II <br /> DEMO CONDENSER <br /> EXTEND12"HIGH WATER PIPING UP "j'L BOIL R <br /> CONCRETE BASE PAD POC TO(E)6"CWR THROUGH CEILING l'^L----,`ROO I tti__I_,_______ <br /> POC TO(E)6"CWR (E)6"CWR DEMO EXISTING C - - fI i________ <br /> AIR SEPARATOR ��� - ----1 Pn � _ I� I DISCONNECTPIPING, <br /> SECTION A r L , E 2"G'i i ' VENT,POWER,GAS PIPE, <br /> A DEMO EXISTING i f1 O '� I i r_� AND CONTROLS AND ASSROOM <br /> M2.1 SCALE:114'=1'-0" feet EXPANSION TANK r f i I G o l '-' c J i I, DEMO BOILER B-1 L <br /> «iJI�-----yrJ I I I (E)B-1 7 l i'J <br /> DEMO BOILER VENT <br /> UP THROUGH ROOF <br /> ISTING DOMESTIC <br /> WATER XPIPING TO REMAIN <br /> DEMO CONDENSER <br /> WATER SUPPLY PIPING <br /> AND SUPPORTS <br /> DEMO CHEMICAL FEED TANK <br /> AND ASSOCIATEDiPIPING <br /> DEMO EXISTING (E12"CW MAKE-UP N <br /> COOLING TOWER PUMP FOOR BOILER& CID CONCRETE PAD COOLING TOWER M <br /> CUT CONCRETE AND (E)4"WASTE, NEW 2"VENT PIPE UP TO AT STO RAGS /� 0 <br /> TRENCH AS REQUIRED TO FIELD VERIFY DEPTH LEAST 8'ABOVE GRADE OR TOP U Q Cb <br /> MAKE CONNECTION TO I OF FENCE,WHICHEVER IS HIGHER �J ^ <br /> (E)4"W BELOW GRADE <br /> POC NEW 4"WASTE AREA DRAIN <br /> TO(E)4"WASTE i FC-1 CONTROL y <br /> PANEL,SEE DETAIL M32 <br /> FILL TRENCH,COMPACT L C rr� <br /> AND PATCH CONCRETE ---------------- -----J O `J <br /> TO MATCH EXISTING I FC-1 CHEMICAL TREATMENT a O <br /> II FC-1 CONTROL PANEL,SEE DETAIL 1 C) <br /> T (E)2"V <br /> (E)CLEANOUT BELOW GRADE a <br /> U cnAl <br /> U � <br /> EXISTING GREASE I <br /> (E)CONCRETE BASE PAD CHORAL <br /> INTERCEPTOR <br /> 2"DRAIN [�] <br /> (E)NP WATER <br /> MMAKE-UP ON <br /> (E)4"SANITARY W EXTEND NP WATER MAKE-UP W Q 0 W <br /> BELOW DRADE TO CONNECTION POINT AT FC-1 <br /> 0 <br /> (E)ENCLOSUREFENCE 1 ENLARGED MECHANICAL ROOM DEMOLITION PLAN N W W <br /> M2.1 SCALE:114'=T-0" feet <br /> I 0 1 2 4 8 16 U <br /> I T <br /> I <br /> I (E)REFRIGERATION <br /> I COMPRESSOR PO REDUCER <br /> (E)CO BUTTERFLY <br /> VALVE <br /> Ll <br /> I (E)2"V PROVIDE A NEW BOILER E-STOP ((E))COMBUSTION <br /> BELOW GRADE 6"CWR SWITCH AT ROOM ENTRY L6UVERS IN 0 <br /> A 7 (E)PANEL DP2A 18 (E)3/4"G 19 <br /> A <br /> POC 8x8 DO(T)P n c E 1-114" i (E)ET-2 0 FLOOR <br /> I I (E)4"SANITARY W C ( ) (E)WH-1 <br /> BELOW DRADE (E)FIRE <br /> SPRINKLER RISER � (E)RP-2 <br /> �F+ (E)1„ AENDECTS <br /> CONTROLSFOR <br /> (E)DISCONNECTS LP-1 AND 4P-2 <br /> 3 ENLARGED NEW FLUID COOLER PLAN(IN YARD) AND CONTROLS ®EF-6 1 <br /> M2.1 SCALE:114"=V-0" feet 6"CWR L_ <br /> PROJ.No: 21015.00 <br /> 0 1 2 4 8 16 AS_1 r-_ CWP-1 DRAWN BY: - <br /> 6"CWR UP <br /> CWP-2 CHECKED BY:LWB <br /> 6"CWR DIN B-2 <br /> 6"CWS DAM: FEB 3,2023 <br /> 8"0 BOILER VENT R OM 3"CWR 8"0 BOILER VENT REVisioes: REVISION/ISSUE DATE <br /> 6"CWR DN BID SET <br /> DISCONNECT((E POWER 6" CLASSROOM <br /> AND CONTROLS T�TOWER B-1 _�>~S <br /> AND DEMO PANEL, oo M T-1 \ 12"0 BOILER VENT UP THROUGH 2 11 <br /> _ 6" 3" EXISTING ROOF PENETRATION <br /> --- 3"CWS (E)6"CWS ITO HIPSr-------------� C <br /> I <br /> (E)2"GAS <br /> DISCONNECT POWER, (E)2"CW MAKE-UP <br /> CONTROLS,AND PIPING CHEM FEED TANK FbRR BOILER& <br /> I i <br /> AND DEMO(E)COOLING TOWER COOLING TOWER <br /> NOTE: <br /> DISCONNECT E NP WATER REFER TO MECHANICAL z a <br /> ROOM PIPING DIAGRAM � <br /> TO COOLING 0 ER M3.1 <br /> -� S OlW-1 <br /> I I <br /> I I <br /> (E)ENCLOSUREFENCE <br /> I I <br /> I I <br /> I I <br /> (E)CONCRETE BASE PAD <br /> I I <br /> I I <br /> I I <br /> I I <br /> I I — <br /> DEMO PIPING TO } <br /> T` COOLING TOWER <br /> DISCONNECT(E)CWR <br /> ----- <br /> TOCOOLINGTOWER <br /> a <br /> a <br /> a- <br /> SHEET TITLE <br /> DISCONNECT(E)CWR CH! ENLARGED PLANS <br /> PIPING AT GRADE <br /> SHEET NUMBER <br /> 4 COOLER DEMOLITION PLAN 2 ENLARGED MECHANICAL ROOM PLAN N <br /> M2.1 SCALE:114'=V-0" feet M.1 SCALE:1/4"=T-O" feetM21 <br /> 0 1 2 4 8 16 0 1 2 4 8 16 ■ <br /> 66 <br /> N PBaE x SHEET 11 OF 15 <br /> N <br />