My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E CASINO RD 2025-04-11
>
Address Records
>
E CASINO RD
>
801
>
801 E CASINO RD 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 2:16:56 PM
Creation date
1/28/2025 9:04:08 AM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reid iddleton ]log=•• • • • <br /> • <br /> DESIGN SUMMARY <br /> Cascade High School is and existing wood framed structure with concrete foundations. The purpose ol <br /> this review is for the upgrade of mechanical units, and the bracing required for them. <br /> Review Comments: <br /> Commentr <br /> Review <br /> 1. The proposed work includes suspended equipment exceeding 2016s.This equipment requires independent support and seismic bracing. Note that Detail 2/M3.2 does not provide <br /> detailed requirements and only addresses suspension of the heat pumps;the fans also require support and bracing. Details should be included in the drawings.Calculations <br /> substantiating the design should be submitted for review.The design should comply with ASCE 7-16 Chapter 13.See IBC Section 1613.1. <br /> 2. The proposed work includes replacement of existing suspended units with new units,including but not limited to the heat pumps,that significantly exceed the weight of the existing units.The <br /> following commentr should be addressed: <br /> a. Calculations evaluating the strength of the stmcture supporting the units in addition to existing loads(e.g.,self-weight,snow,etc.,including but not limited to joists and supporting beams <br /> and columns,should be submitted for review.See IBC Section SfiO4.1 and 1604.4. <br /> b. Details for the installation of the units should be submitted for review. <br /> c. Continuing with the previous comment,an additional Building permit application must be submitted if structural modifications are required.Minor modifications such as penetrations <br /> through and blocking of the roof sheathing to create small duct openings may be included in the Mechanical permit details.Note that if a Building permit application is required,the <br /> Mechanical permit cannot be issued until[he Building permd is approved. <br /> Comment Responses: <br /> 1) Calculations for existing framing, accounting for the Nonstructural Seismic Loads on <br /> new units, are • • <br /> 2) Mechanical Unit weights have increased, prompting evaluation of: <br /> a) Existing structure. Existing Glulam beams verified for existing design loads <br /> • new unit weightsandseismicoverturning forces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.