Laserfiche WebLink
ANCHORS A FASTENERS <br />INSTALLATION SPECIFICATIONS <br />INSTALLATION SPECIFICATIONS <br />Installation Table for Power -Stud+ SD2 <br />Anchor Property/ <br />Notation <br />Units <br />Nominal Anchor Size <br />3/8" <br />1/2" <br />5/8" <br />Setting Information <br />Anchor diameter <br />de <br />in. <br />0 375 <br />0.500 <br />0.625 <br />0.750 <br />(mm) <br />(9.5) <br />(12.7) <br />(15.9) <br />(19.1) <br />Minimum diameter of hole <br />on <br />in. <br />7/16 <br />9/16 <br />11/16 <br />13/16 <br />clearance In fixture <br />(mm) <br />(11.1) <br />(14.3) <br />(17.5) <br />(20.6) <br />Nominal drill on diameter (ANSI) <br />den <br />in. <br />3/8 <br />1/2 <br />5/8 <br />3/4 <br />Minimum nominal <br />hem <br />in. <br />2-3/8 <br />2-1/2 <br />3-3/4 <br />3-7/8 <br />4-7/8 <br />4-1/2 <br />5-3/4 <br />embedment depth' <br />(mm) <br />1 (60) <br />(64) <br />(95) <br />(98) <br />(124) <br />(114) <br />(146) <br />Effective embedment <br />her <br />in. <br />2 <br />2 <br />3-1/4 <br />3-1/4 <br />4-1/4 <br />3-3/4 <br />5 <br />(mm) <br />(51) <br />(51) <br />(83) <br />(83) <br />(108) <br />(95) <br />(127) <br />Minimum hole depth' <br />he <br />in. <br />2-5/8 <br />2-3/4 <br />4 <br />4-1/4 <br />5-1/4 <br />5 <br />6-1/4 <br />(mm) <br />(67) <br />(70) <br />(102) <br />(108) <br />(133) <br />(127) <br />(159) <br />Minimum concrete <br />hmm <br />in. <br />4 <br />4-1/2 <br />6 <br />5-3/4 <br />5-3/4 <br />6 1/2 <br />8 <br />7 <br />10 <br />member thickness <br />(mm) <br />(102) <br />(114) <br />(152) <br />(146) <br />(146) <br />(165) <br />1 (203) <br />(178) <br />(254) <br />Minimum overall anchor length' <br />Eenen <br />In. <br />3 <br />3-3/4 <br />4-1/2 <br />4-3/4 <br />6 <br />5-1/2 <br />7 <br />Minimum edge distance' <br />Cm in <br />in. <br />2-1/2 <br />4 <br />2-3/4 <br />4 <br />2-3/4 <br />4-1/4 <br />4-1/4 <br />5 <br />4-1/2 <br />(mm) <br />(64) <br />(102) <br />(70) <br />(102) <br />(70) <br />(108) <br />(108) <br />(127) <br />(114) <br />Minimum spacing distance' <br />smm <br />in. <br />3-1/2 <br />6 <br />6 <br />4 <br />6 <br />4-V4 <br />4-1/4 <br />6 <br />6 <br />(mm) <br />(89) <br />(152) <br />(152) <br />(102) <br />(152) <br />(108) <br />(108) <br />(152) <br />(152) <br />Critical edge distance' <br />in. <br />6-1/2 <br />8 <br />10 <br />8 <br />15-3/4 <br />10 <br />12 <br />12 <br />(uncracked concrete only) <br />we <br />(mm) <br />(165) <br />(203) <br />(254) <br />(203) <br />(400) <br />(254) <br />(305) <br />(305) <br />Installation torque <br />T„,a <br />R-Ib <br />20 <br />40 <br />60 <br />110 <br />(N-m) <br />(27) <br />(54) <br />(81) <br />(149) <br />Torque wrench socket size <br />- <br />in. <br />9/16 <br />3/4 <br />15/16 <br />1-1/8 <br />Nut height <br />- <br />in. <br />21/64 <br />7/16 <br />35/64 <br />41/64 <br />Washer 0.D <br />- <br />in. <br />13/16 <br />1-1/16 <br />1-5/16 <br />1-15/32 <br />ForSI'. 1 inch—25.4mm, 1 ff-Ibf= 1356 N-m. <br />1. The embedment depth, h.., is measured from the outside surface of the concrete member to the embedded end of the anchor prior to tlghtening. <br />2. For installatons through the soffit of steel deck imb concrete see the installation details in Figure A, B, and C. In addition, anchors shall have an adal spacing along the flute equal to the <br />greater of3heror 1.5 times the flute width. <br />3. The listed minimum overall anchor length is based on anchor sizes commercially available at the time of publicaton compared with the requirements to achieve the minimum nominal <br />embedment depth and possible fixture attachment <br />4. The anchors may be installed in the Npsice of concrete- filled steel deck floor and roof assemblies in accordance with the installaton speciflcatons and design information provided the <br />concrete thickness above the upper flute meets the minimum thicknesses specified in the tables, see Settng Information for Installation on the Top of Concrete Filled Steel Deck Assemblies <br />table and Installaton Detail D. <br />Anchor Setting Information for Installation on the Top of Concrete -Filled Steel Deck Assemblies" <br />Anchor Property/ <br />Nominal Anchor Size (in <br />Setting Information <br />Notation <br />Units <br />3/8" <br />Nominal drill on diameter (ANSI) <br />daa <br />in. <br />3/8 <br />1 /2 <br />Minimum nominal embedment depth' <br />heem <br />in. <br />(mm) <br />2-3/8 <br />(60) <br />2-1/2 <br />(64) <br />Effective embedment <br />her <br />in. <br />200 <br />200 <br />(mm) <br />(51) <br />(51) <br />Minimum concrete member thickness' <br />hmin,deck <br />in. <br />(mm) <br />2-1/2 <br />(64) <br />2-1/2 <br />(64) <br />Critical edge distance for topside of concrete- <br />In. <br />8 <br />9 <br />filled steel deck assemblies with minimum <br />cee,newmp <br />(mm) <br />(203) <br />(229) <br />topping thickness (uncracked concrete only) <br />Minimum edge distance <br />cmm,neehmp <br />in. <br />(mm) <br />4 <br />(102) <br />2-3/4 <br />(70) <br />4 <br />(102) <br />8 <br />(203) <br />Minimum spacing distance <br />sm,e,neehmp <br />in. <br />(mm) <br />3-1/2 <br />(89) <br />6 <br />(152) <br />8 <br />(203) <br />4 <br />(102) <br />Minimum hole depth <br />he <br />in. <br />2-1/2 <br />2-1/2 <br />(mm) <br />(64) <br />(64) <br />Installation torque <br />Tim <br />R-Ib. <br />20 <br />40 <br />(N-m) <br />(27) <br />(54) <br />Torque wrench socket size <br />- <br />in. <br />9/16 <br />3/4 <br />Nut height <br />- <br />in. <br />21/64 <br />7/16 <br />Washer 0.D. <br />- <br />in. <br />13/16 <br />1-1/16 <br />ForSI'. 1 inch—25.4mm, 1 &Ibf= 1356 N-m. <br />1. The embedment depth, h.., is measured from the outside surface of the concrete member to the embedded end of the anchor prior to tlghtening. <br />2. The anchors may be installed in the Npsice of concrete filled steel deck Door and roof assemblies provided the concrete thickness above the upper flute meets the minimum thicknesses <br />specified in this table. Minimum concrete member thickness refers to the concrete thickness above the upper flute (topping thickness). See Installation Detail D. <br />3. For all other anchor diameters and embedment depths, refer to the installaton table for applicable values of hmm, corm and smm. <br />4. Design capacities shall be based on calculations according to values in Tension Design informaton and Shear Design informaton tables. <br />