My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BASE FILE 2025-01-31
>
Address Records
>
W CASINO RD
>
3003
>
BASE FILE
>
3003 W CASINO RD BASE FILE 2025-01-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 1:29:09 PM
Creation date
1/28/2025 11:40:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEWALT <br /> INSTALLATION INSTRUCTIONS ENGINEERED BY"Towers <br /> Power-Stud+ SD2 Anchor Detail Head Marking <br /> A. <br /> t t <br /> ranch <br /> ranch Legend <br /> d Fe'h om het Letter Code =Length Identification Mark <br /> o ho o w ha +'Symbol =Strength Design Compliant Anchor <br /> La <br /> Number Code 2=Carbon Steel Body and Stainless Steel Expansion Clip <br /> dbit a dbit <br /> Before After <br /> Length Identification <br /> = Mark A B c B E F G H I J K L M N 0 P <br /> c�O From 1-1/2" 2" 2-1/2" 3" 3-1/2" 4" 4-1/2" 5" 5-1/2" 6" 6-1/2" 7" 7-1/2" 8" 8-1/21, 9" <br /> Up to but not 2" 2-1/2" 3" 3-1/2" 4" 4-1/2" 5" 5-1/2" 6" 6-1/2" 7" 7-1/2" 8" 8-1/2" 9" 9-1/21, <br /> o including <br /> 3 m Length identification mark indicates overall length of anchor. <br /> y INSTALLATION INSTRUCTIONS <br /> CD <br /> Q C Installation Instructions for Power-Stud+ S02 <br /> cc <br /> CD <br /> v <br /> DCAe C D .p <br /> O N Step 1 Step 2 Step 3 Step 4 <br /> o Using the proper drill bit size,drill a hole Remove dust and debris from the hole Position the washer on the anchor and Tighten the anchor with a torque wrench <br /> into the base material to the required during drilling,(e.g.dust extractor, thread on the nut.If installing through by applying the required installation <br /> depth.The tolerances of the drill bit hollow bit)or following drilling(e.g. a fixture,drive the anchor through the torque,Tina, <br /> used should meet the requirements of suction,forced air)to extract loose fixture into the hole. Be sure the anchor <br /> ANSI Standard B212.15. particles created by drilling. is driven to the minimum required <br /> embedment depth,hnom. <br /> z <br /> 0 <br /> 7 <br /> n <br /> n <br /> Az <br /> c� <br /> x <br /> 0 <br /> O <br /> 0 <br /> 13 <br /> mti <br /> CJ <br /> www.DEWALT.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.