Laserfiche WebLink
2.5 Coastal Considerations <br /> If installed within one mile of salt water, including seacoasts and inland waterways, models without factory sup- <br /> plied Seacoast Salt Shields require the addition of BAYSEAC001 (Seacoast Kit) at installation time. <br /> Section 3. Unit Preparation <br /> 3.1 Prepare The Unit For Installation <br /> STEP 1 - Check for damage and report prompt- <br /> ly to the carrier any damage found to the unit. <br /> STEP 2 -To remove the unit from the pallet, <br /> remove tabs by cutting with a sharp tool. <br /> LTABS <br /> VE <br /> AS <br /> N <br /> Section 4. Setting the Unit <br /> 4.1 Pad Installation <br /> When installing the unit on a support pad, such <br /> as a concrete slab, consider the following: <br /> • The pad should be at least 1" larger than the <br /> unit on all sides. <br /> • The pad must be separate from any structure. a� <br /> • The pad must be level. <br /> • The pad should be high enough above grade a �g EMS <br /> to allow for drainage. �a <br /> • The pad location must comply with National, a <br /> State, and Local codes. �a <br /> 18-BC108D1-1 B-EN 5 <br />