Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/6/2024 8/6/2024 GAS 01-ROUGH IN JASON APPROVAL see notes <br /> MORRISSEY <br /> Notes: <br /> 8/4/2024 6:35 PM Crystal Pack <br /> reference electrical permit E2407-239 <br /> Contact Name:Crystal Pack <br /> Site Address:2228 ADAMS AVE <br /> Phone:2063839342 <br /> e-Mail:Crystalpack@live.com <br /> -Rough gas piping ok. **** Make sure to paint all black iron pipe exposed to exterior with corrosion resistant paint per IRC G2415.11.Will inspect for <br /> paint at final.***Tankless to be installed at later date on this permit. <br /> 9/23/2024 9/23/2024 GAS 03-FINAL JASON PARTIAL see notes <br /> MORRISSEY APPROVAL <br /> Notes: <br /> 9/20/2024 8:58 AM Crystal Pack <br /> Contact Name:Crystal Pack <br /> Site Address:2228 ADAMS AVE <br /> Phone:2063839342 <br /> e-Mail:Crystalpack@live.com <br /> -Final gas connections complete.***Just need to confirm function of tankless once gas is turned on. <br /> 9/23/2024 9/23/2024 MECH 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> -Relief line for new tankless water heater needs to be cut back to minimum 6"from the ground per UPC chap 6. <br /> 11/15/2024 11/15/2024 GAS 03-FINAL I JEFF M RHODE I NO ACCESS see notes <br /> Notes: <br /> 11/9/2024 2:17 PM Crystal Pack <br /> Contact Name:Crystal Pack <br /> Site Address:2228 ADAMS AVE <br /> Phone:2063839342 <br /> e-Mail:Crystalpack@live.com <br /> No Access. Please reschedule your inspection online for a new date when access will be available.To speak with an Inspector to get an ETA or to provide <br /> access instructions please call 425-257-8810 option 3 between 7:30 a.m.and 8:30 a.m.the morning of your scheduled inspection. <br /> 11/26/2024 11/26/2024 GAS 03-FINAL JASON APPRVD-PERMIT <br /> MORRISSEY FINAL <br /> Notes: <br /> Contact Name:Crystal Pack <br /> Site Address:2228 ADAMS AVE <br /> Phone:2063839342 <br /> e-Mail:Crystalpack@live.com <br /> I <br /> Printed:Tuesday,28 January,2025 2 of 3 rk <br /> SUPERION <br />