My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 1/27/2025 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Group Inc. 1/27/2025 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 3:53:04 PM
Creation date
1/28/2025 3:52:43 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
1/27/2025
Council Approval Date
1/22/2025
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th St, Prelim Engineering
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002775
Total Compensation
$309,641.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
December 2024 Page 9 of 9 Jacobs Engineering Group to be used during bidding, by completing final design and incorporating comments from previous design submittal to update the estimate. The final construction cost contingency amount will be added as directed by the City. The Consultant will prepare a Class 1 OPCC (+15%/-10%) at 100% design in accordance with the AACEI recommended practices, and a construction schedule. Deliverables: 1. 100% Final OPCC Estimate and Construction Schedule – electronic files (PDF). END OF SCOPE OF WORK FOR AMENDMENT NO. 2 CITY OF EVERETT 36th ST CSO Storage December 2024
The URL can be used to link to this page
Your browser does not support the video tag.