Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION EXTENSION <br /> 10/5/2023 10/5/2023 (REASON AUDREY ARBOW APPROVED <br /> REQUIRED) <br /> Notes: <br /> Is it possible to get the Electrical Permit,E1703-197,reactivated or do I need to pay for a new permit to be able to complete the work and have it <br /> inspected? <br /> I have a building inspection consultation(131703-049)scheduled for tomorrow. <br /> Please let me know which is the best way to proceed as far as the Electrical.Permit is concerned. <br /> I appreciate any assistance and guidance you can provide. <br /> Call me if you have any questions. <br /> Sincerely <br /> Jeff Heilman <br /> 425-359-5678 <br /> 1740 Madison St. <br /> Everett,WA 98203-5233 <br /> I <br /> Printed:Wednesday, 29 January,2025 2 of 2 rk <br /> SUPERION <br />