Laserfiche WebLink
Inspection Types to Select <br /> Please request an inspection that matches the permit type. <br /> Building Public Works <br /> Bldg 01-Consultation PW 01-Jab Start Notification <br /> Bldg 02-Footing/Setback PW 02-Onsfte PreCon <br /> Bldg 03-Foundation Wall PW 03-Erosion Control Evaluation <br /> Bldg 04-UFER Ground PW 04Ciearing/Grading <br /> Bldg OS-Underfloor Framing PIN 05-Sewer Main Install <br /> Bldg 06-Underslab Insulation PW 06-Water Main Install <br /> Bldg 07-Exterior Shear PW 07-Storm&Drainage <br /> Bldg 08-Framing PVJ 08-Footing Drain/Positive Drain <br /> Bldg 09-Drywall Nailing PW 09-Downspouts <br /> Bldg 10-Interior Shear PVJ 10-Fence <br /> Bldg 11-Insulation PW 11-Rockery/Retaining Wall <br /> Bldg 12-Ceiling Grid P'N 12-Traffic Control Evaluation <br /> Bldg 13-Roof Nailing PVJ 13-Pothole Evaluation <br /> Bldg 14-Other PVJ 14Asphalt Subgrade Evaluation <br /> Bldg 15-Final PW 15-Asphalt Paving Final <br /> Bldg 18-Fire Preliminary for Building PW 16-Concrete Formwork Evaluation <br /> Bldg 17-Fire Final for Building PIN 17-Concrete Paving Final <br /> Bldg 18-Fire Other for Building PW 1 8-Curb or Sidewalk Subgrade <br /> Electrical PV119-Curb or Sidewalk Final <br /> Elec 01 Temp Service PIN 20-Above Ground Inspection <br /> Elec 02-Ground Work PIN 21-Underground Utility Inspection <br /> Elec 03-Slab/Conduit PVJ 22-Other <br /> Elec 04-Grounding PW 23-Frontage Improvements Final <br /> Elec 05-Service PIN 24Site Final <br /> Elec 06--Rough In Mechanical/Gas <br /> Elec 07-TGrid Gas 01-Rough In <br /> Elec 08-Other Gas 02-Underground Work <br /> Elec 09-Final Gas 03-Final <br /> Plumbing klech 01-Consultation <br /> Plumb 01-Consultation Mach 02-Ground Work/Slab <br /> Plumb 02-Ground Work/Slab Idech 03-Refrigeration <br /> Plumb 03-Rough In Much 04-Rough In <br /> Plumb 044dedical Gas Mach 05-Other <br /> Plumb 05-0ther Mech 06-Final <br /> Plumb OF-Final Fire Alarm <br /> Utilities FA 01-Fire Alarm Rough In <br /> Util 01-Job Start Notification FA 02-Fire Alarm Final <br /> Util02-Side Sewer Repair Sprinkler/Suppression <br /> t Util 03-Side Sewer Alteration Sprinkler 01-Underground HydrostatictFlush Test <br /> Util 04Side Sewer Connection Sprinkler 02-Sprinkler Rough In <br /> Util 06-Side Sewer Cap Off Sprinkler 03-Sprinkler Final <br /> Util 08-Backwater Valve Install Sprinkler 0401her <br /> Util 09-Meter Setter Evaluation Sprinkler 05-Commercial Hood Trip Test <br /> Util 10-Water Service Pipe Sprinkler 06-Commercial Hood Final <br /> LIN 11-Irrigation Service Pipe Sprinkler 07-Commercial Hood Other <br /> Utl 12-Fire Service Pipe Planning <br /> Util 13-Other Planning General Inspection <br /> Util 14-Final Planning Landscaping <br /> Planning Final <br /> NOTE:Once all inspections have been approved,you must request a FINAL <br /> INSPECTION to close out the permit. <br /> INSPECTION POLICY: Inspection requests submitted online by 11:59pm <br /> Monday-Friday will be tentatively scheduled for the next business day. If <br /> the volume of requests exceeds what can be completed the next business <br /> day,the remaining requests will be given priority on the schedule for the <br /> following business day. Inspection schedules are set by 8:30am daily, <br /> Check the permitting portal dashboard for updates. <br /> CANCELLATIONS: Requested inspections can be cancelled until 11:00pm <br /> the day before the tentatively scheduled inspection date,as shown in you <br /> dashboard in the section called <br /> L\11y Active Inspections <br /> MORNING OF THE INSPECTION:Inspection schedules are set by 8:30am <br /> daily.If you need to speak with the inspector the morning of the <br /> inspection,please call between 7:30am-8:30am.After that,the inspectors <br /> are out of the office for the day.Call 425-257-8810,press option 4 for the <br /> Inspectors,then listen to the extensions for inspector type. <br />