Laserfiche WebLink
DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY ALL <br /> DIMENSIONS AND ADVISE CONSULTANTS OF ANY ERRORS OR <br /> OMISSIONS.NO VARIATIONS OR MODIFICATIONS TO WORK <br /> SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN <br /> O7 NOT USED APPROVAL ALL PREVIOUS ISSUES OF THIS DRAWING ARE <br /> SUPERSEDED BY THE LATEST REVISION.ALL DRAWINGS AND <br /> SPECIFICATIONS REMAIN THE PROPERTY OF MORRISON <br /> O NEW 24"x24" NEMA-3R ENCLOSURE (FIBER/SITE TECH CABINET) MOUNTED ON H—FRAME. I I HERSHnELD CORPORATION.NEITHER MORRISON HERSHFIELD <br /> I NOR THE ARCHITECT WILL BE PROVIDING CONSTRUCTION <br /> O3 PROPOSED 2" PVC CONDUIT WITH (3) 1-1/4" INNERDUCTS AND TRACEABLE MULE TAPE I REVIEW OF THIS PROJECT. <br /> FROM NEMA-3R TELCO ENCLOSURE TO FIBER CABINET. <br /> ONEW (2) #12 AWG CU. AND (1) #12 AWG CU. GROUND IN 1/2" RNC. I I I <br /> OPROPOSED FIBER HANDHOLE/PULLBOX. COORDINATE WITH FIBER PROVIDER FOR NEW _ L C E CC) <br /> SERVICE. <br /> ONOT USED. _— I ~ tJE `v rI1/ O <br /> � n <br /> O7 NOT USED. <br /> Og NEW (3) #3/0 AWG CU. IN 3" RNC. <br /> V: <br /> OEXISTING UTILITY POLE MOUNTED TRANSFORMER. COORDINATE WITH UTILITY FOR NEW I I <br /> 120/24OV-10-3W, 200A FROM UTILITY POLE TO UTILITY POLE AND THEN UNDERGROUND <br /> SERVICE TO VERIZON WIRELESS METER. <br /> O10 NEW (ILC) INTEGRATED LOAD CENTER, NEMA-3R PPC LOAD CENTER (PANEL "PP1") I I , 422 �O <br /> COMPLETE WITH AN INTEGRATED AUTOMATIC TRANSFER SWITCH, A 20OA-2P UTILITY MAIN <br /> CIRCUIT BREAKER & A 20OA-2P EMERGENCY MAIN CIRCUIT BREAKER. <br /> 11 GENERATOR PLUG. <br /> 12 (3) 3/0 + (1) #6 GROUND, 2"C. PROVIDE RNC B.F.G. AND RGS A.F.G. <br /> 13 NEW 2P-200A MAIN CIRCUIT BREAKER IN METER/MAIN CIRCUIT BREAKER COMBO WITH <br /> INTERRUPTING CAPACITY=10OK AIC. PROVIDE MECH. ATTACHED ENGRAVED LABEL INDICATING <br /> "VERIZON WIRELESS METER". CONSTRUCTION <br /> 14 NEW 120/24OV-10-3W, 200A RATED METER/MAIN CIRCUIT BREAKER COMBO MOUNTED AT 71 <br /> NEW H—FRAME. PROVIDE MECH. ATTACHED ENGRAVED LABEL INDICATING "VERIZON _ T— <br /> WIRELESS METER". __ < <br /> 15 NEW 200A CAPACITY 240V-10 NEMA 3R METER SOCKET PER POWER CO. REQUIREMENTS. <br /> 18 PROPOSED (2) 4" PVC CONDUIT WITH (3) 1-1/4" INNERDUCTS AND TRACEABLE MULE <br /> TAPE FROM POINT OF FIBER CONNECTION TO NEMA-3R TELCO ENCLOSURE. INSTALL <br /> CONDUITS IN A 36" BELOW GRADE TRENCH. COORDINATE EXACT REQUIREMENTS WITH FIBER ' <br /> PROVIDER. I I 0 06/14/18 FINAL CONSTRUCTION <br /> 17 BOND TO GROUND RING W/#2 AWG SOLID TINNED COPPER. <br /> O I 18 NEW MIN. #4 AWG CU TO (2) 5/8"X10' COPPER CLAD RODS SPACED A MINIMUM OF 6. � A 03/22/18 ISSUED FOR REVIEW <br /> � <br /> APART. VERIFY IN FIELD. I No. Date Revision <br /> 19 NOT USED. <br /> I Client: <br /> 20 NEW 2" CONDUIT FOR EQUIPMENT CABINET REFER TO LOAD CENTER DIAG. SHEET E-6 <br /> 21 NOT USED. <br /> 22 NOT USED. � verizonJ <br /> 23 NEW H—FRAME FOR VERIZON EQUIPMENT. I I P4 24 <br /> Os 12 <br /> 24 CONTRACTOR TO ARRANGE TO PAY FOR UNDERGROUND UTILITY LOCATION SURVEYS FOR <br /> ALL TRENCHING. REUSE NATIVE BACKFILL AND REINSTATE TO ORIGINAL CONDITION. INSTALL <br /> 6" WIDE METALLIC LINE RED PLASTIC MARKER TAPE 8" ABOVE ALL BURIED CONDUIT. I E43 UOP 9 Implementation Team: <br /> 25 NOT USED. 5 <br /> 26 NEW RADIO CABINET. I �• •L"T UCN o a CROWN <br /> 27 NEW PRIMARY POWER AND BATTERY ENCLOSURE. ---- , OHP/ llli CASTLE <br /> O28 NEW H—FRAME LIGHT (LITHONIA CAT #HFL1—LED—P1-40K—WFL—MVOLT OR EQUIVALENT). <br /> I ' I 1505 WESTLAKE AVE N,SUITE 800 <br /> I SEATTLE,WA 98109 <br /> I <br /> 29 NEW 4 TO 6 HOUR CRANK TIME LIGHT SWITCH IN WEATHERPROOF ENCLOSURE. <br /> 13 14 15 I 8 24 I A&E Team: <br /> rrA <br /> I <br /> I I MORRISON HERSHFIELD <br /> I <br /> 600 STEWART ST,SUITE 200 <br /> SEATTLE,WA 98101 <br /> Tel:206.268.7370 <br /> I www.morrisonhershfield.com <br /> I I Project Info: <br /> BU# 825709 <br /> _ I I MASONIC CENTER <br /> — _ I 220 OLYMPIC BLVD. <br /> J EVERETT, WA 98203 <br /> Drawing Title: <br /> W MUKILTEO BLVD �— ELECTRICAL <br /> SITE PLAN <br /> Project Number: Start Date: <br /> 1800386 03/22/18 <br /> Drafter: Designer: <br /> RR LB <br /> Project Manager: Professional of Record: <br /> 1. PROVIDE 17"x30" CONCRETE <br /> RKL RL <br /> PULL—BOXES AT EVERY OTHER BEND Revision No: Sheet No: <br /> OR AS REQUIRED BY UTILITY COMPANY <br /> 0 E-2 <br /> ELECTRICAL REFERENCE NOTES 2 11 x17a SCALE: No TO SCALE ELECTRICAL SITE PLAN 1 1 <br />