My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 80TH ST SW D 2020 BIRDWELL MACHINE Plans 2025-02-03
>
Address Records
>
80TH ST SW
>
1420
>
BIRDWELL MACHINE
>
Plans
>
1420 80TH ST SW D 2020 BIRDWELL MACHINE Plans 2025-02-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 10:40:08 AM
Creation date
1/29/2025 11:49:20 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1420
Unit
D
Tenant Name
BIRDWELL MACHINE
Permit
B2002-028
Year
2020
Notes
TI-DEMO NON STRUCT WALLS AND CONSTUCT NEW WALLS AND
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FASTENMASTER TECHNICAL BULLETIN FASTENMASTER TECHNICAL BULLETIN <br /> I'1 I 1' I I 1 1 1E319- <br /> /fin nn <br /> For this condition,use the RAIL POST TO RIM BOARD <br /> 8"ThruLOK Fastener �jH�lU'lljl <br /> 1.Install first screw in the center of the CONNECTION DETAILS <br /> past and 2"(+/-1/4')ham the cop of According to the 2009 Intsmallonal Residential Code for One and Two-Fami Owellin s Table R301.5(ICC,2009), <br /> O -- the rim hoard g IY g <br /> 2.Install second mew 1"In from the edge guardrails and handrails must he designed to withstand 950 1 ST STREET SOUTH <br /> od a single concentrated load of 200 pounds In any direction.A KIRKLAND,WA 98033 J - of the post and 2" "(+-1 4)from the <br /> / / critical part of this connection is making a strong connection between the guardrail past and the rim board of the deck. TEL:425.827.7850 <br /> ® O bottom of the rim hoard FAX:425.B27.7014 <br /> 014 <br /> In most Cases,a 1/2"throughholt or carriage bolt is used to make this connection.When Installed as instructed in this INFOaPAGEANDBEARD.COM <br /> 3.Install third screw 1"in from the other <br /> edge of the post and 3"(+/-1/4") bulletin,the ThruLOK System can replace 1/2"bolts,meeting the 200 pound design load for this part of the connection. <br /> from the bottom of the rim hoard <br /> 1 <br /> IT�k <br /> R ThruLOK- <br /> For this condition,use two,6 1/4" <br /> �I and one,B"T fasteners <br /> i.Install first 61/4"/4"screw 1"in from the �t <br /> edge of the past and 2"(+/.1/4") , <br /> ---- ' _ from the top of the rim board <br /> O 2.Install second 6 1/4"screw 1"In from <br /> 40 the other edge of the post and 2" e <br /> (+/-1/4")from the bottom of the <br /> O rim board <br /> �J 3.Install 8"screw centered on both the DECK POST TO SINGLE RIM JOIST DECK POST TO DOUBLE RIM OR <br /> post and the rim board SINGLE RIM WITH BLOCKING UJ <br /> I 1 <br /> t 1 F1 M <br /> 1.Choose the correct length(6 1/4"or 8")and fastening 6.Return to driving the screw in the O <br /> Design values used to create the fastening patterns in this International Residential Code"(R319.3)and 20091RC pattern for each post to rim application based on the remaining 1/4"to 1/8"until the 2i N <br /> bulletin were derived from individual fastener testing under (R317.1.3)for use in ACO pressure heated woad. Illustrated conditions. washer and nut are firmly drawn Mlxw U � 00 <br /> 0x <br /> ICC Acceptance Criteria AC233 and reported in ICC-ES Evaluation As with other bolted connections using wet heated wood,the 2.Mark the surface of the wood with the correct pattern. together. �., <br /> Report ESR N1078.Full scale testing of the deck rail post to nut should be inspected and tightened N needed after initial 7.Make sure tilat the point of the a Cn Q <br /> deck frame connections were also conducted by an accredited dr'n period. 3.N a gush mounted head is required,use a 1 1/4"spade bit L <br /> drying P ro create a 1 4"deep roc ThruU3K fastener has passed the <br /> third parry to support these details. / p recess in the rim or post. 'MIN LINE" <br /> The connection details in this bulletin are on acceptable moons printed an the nut. O <br /> The connection details shown in this bulletin apply specifically of transferringthe load from guard post to rim joist only. 4.Remove the pre-assembled ThruLOK nut from the screw and CX) <br /> to 4x4 posts and 2x8,2z10 or 2x12 rims and/or Joists. g P y using a 1/2"drill on low speed/high torque setting,install 8.Repeat until all of the fasteners ore <br /> Addis from <br /> of blocking or hardware may be required ro transfer the ThruLOK screw and washer Into the outside face of the installed corcecdy according to the J O W <br /> For different dimension lumber,wood species of lower density loads from the rim to deck Joists. specifications contained in this bulletin. J N W than Hem Fir(SYP and DF are higher density and therefore application until the screw is 1/4"to 1/B"from being flush. p <br /> approved),or post heights greater than 31.5'off the top of Fastening patterns assume the following:All components are 5.Thread the ThruLOK nut onto the exposed threaded and of W W <br /> used(screw,washer and nut),holes are not predalled,and <br /> the joists,please contact FastenMoster to determine the proper posts are loaded In an outward direction from the deck. the fastener.Firmly twist on the nut by hand until snug. <br /> fastening solution. <br /> For questions regarding these or other connections,please contact <br /> ThruLOK is coated with mechanically applied zinc in accordance FastenMoster Technical Support at www.fostenmasteccom or by EHectiva until DacmbOT 31,2014.Updated information must be obtained after this date. Q <br /> with ASTM B695,Class 55.This is compliant with the 2006 calling 800-518-3569. PasNnMaster. <br /> FASTER EASIER STRONGER 153 BOWLES ROAD,AGAWAM,MA01001 413-789-0252 800.518.3569 1 WWW.FASTENMASTER.COM <br /> FnanMamr"and TWOlPme a E.Gk,eF One,W. <br /> CMVNMa 2014 OMG,Inc Afi,iRhn nerved. H� <br /> co <br /> FASTENMASTER TECHNICAL BULLETIN FASTENMASTER TECHNICAL BULLETIN <br /> 11MI 1 1 1' 1 IREP�f 0 gill ales1 1 <br /> For this condition,use the For this condition,use the <br /> 6'/•"ThruLOK fastener 8"ThruLOK fastener <br /> _ 1.Install first screw 1"in from the edge of 1.Install first screw I"in from the edge of <br /> the post and 2"(+/-1/4")from the ------ the post and 2"(+/•1/4")from the <br /> top of the rim hoard tap of the rim boards <br /> O O <br /> 2.Install second screw 1"in from the other 0 2.Install second screw I"in from the other PERMIT <br /> - edge of the post and 3"(+/•1/4") © edge of the post and 3"(+/•1/4") SET <br /> from the tap of the rim board from the tap of the am boards <br /> 3.Install third screw in the center of the 3.Install third screw in the center of the JOB NO: 19.63 <br /> O past and 2"(+/-1/4')from the 6 post and 2"(+/-1/4")from the ISSUE <br /> 'J bottom of the rim board o <br /> '•J bottom of the rim boards 2n a/2o2 <br /> -. 01 PERMIT SET a <br /> For this condition,use the <br /> 6 1 4"ThruLOK fastener For this condition,use the <br /> / 8"ThruLOK fastener <br /> 1.Install first screw in the center of the <br /> -----. post and 2"(+/-1/4"9 from the top of 1.Install first screw in the center of the <br /> --- Post an 2"(+-1/4")from the top of <br /> O _ the rim board -- the rim hoards <br /> 2.Install second screw 1"In from the other 0 2.Install second screw 1"in from the edge <br /> edge of the post and 3"(+/-1/4") ° of the post and 3"(+/•1/4")from the <br /> O from the bottom of the rim board O bottom of the rim boards <br /> © 3.Install third screw 1"in from the edge a 3.Install third screw 1"in from the other HIS oom"ex.ee-enrs x PROHREETM <br /> of e post and 2"(+/•1/4')6om the -_---_` edge of the post and 2"(+/•1/4") <br /> s g"no°,eicu:eo o�`o;rE P mecrs <br /> bottom of the rim board from the bottom of the rim boardsMI ACDMOIS TO THIS 111ICT 01'OR <br /> -- - `0 PAGE aoeu o iau'-x"Eris w�" <br /> CONDITION 3-INTERI'MOUNTED 4X4 CORNERPOST TO 2X RIM <br /> REGISTERED <br /> For this condition,use the For this condition,use the AR <br /> 6 1/4"ThruLOK fastener 8"ThruLOK fastener - <br /> Bp 1.Install first screw 1"in from the edge of 1.Install first screw 1"in from the edge of LEN C.PAGE <br /> ? the post and 2"(+/-1/4")from the �� .y/ the past and 2"(+/-1/4")from the STATE OF WASHNJGTON <br /> - _ tap of the rim board --------- '- - top of the rim hoards <br /> 2.Install second screw 1"in from the other O O '� 0 2.Install second screw 1'in from the other <br /> 0 edge of the post and 2"(+/-1/4") o edge of the post and 2"(+/•1/4") <br /> from the bottom of the rim board from the bottom of the rim boards <br /> 3.Install third screw centered on both the O 3.Install third screw centered on bath the <br /> © / post and the rim board .� / <br /> S post and the rim hoards T.I.DETAILS <br /> p�pB <br /> &g� <br /> THRU-LOK 1N5TRUCMNS C, A-8. 1 <br /> �? SCALE: V = 1'-0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.