My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7822 BEVERLY LN B 2025-04-11
>
Address Records
>
BEVERLY LN
>
7822
>
7822 BEVERLY LN B 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 11:51:52 AM
Creation date
1/29/2025 2:28:59 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
7822
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r , <br /> PACIFIC NORTHWEST INSPECTION ENGINEERS <br /> 10738 169th Avenue S.E., Renton, Washington 98059 (425)228-5975 <br /> BUILDING INSPECTION REPORT <br /> November 22,2019 <br /> Engineer's Inspection of the Real Property Located at 7822-B Beverly Lane <br /> Everett, Washington <br /> For the exclusive use of Carlos Tabarez <br /> Date of Inspection: November 19, 2019 <br /> Inspecting Engineer: Jack A. Swardz,P.E. lee& <br /> °Fc?o?O2 <br /> INTRODUCTION <br /> Aeriir <br /> Off, 1 <br /> The purpose of this inspection was to evaluate deck construction to the extent that a reaso ` <br /> amount of time and conditions permit. The initial presumption is that all elements are adequatAs .�'?' <br /> and proper. Statements,representations or conclusions to the contrary are made only when the <br /> inspecting engineer sees evidence which, in his judgment, indicates the existence of significant <br /> deficiencies. <br /> The inspection is visual only and does not involve the opening or exposure of elements <br /> concealed from view. <br /> Wherever a deficiency of any kind is identified in this report,there is always a possibility that it <br /> is associated with a larger, more serious, or more extensive problem that is hidden from view or <br /> is beyond the scope of this inspection. Consequently,you should take whatever action is <br /> necessary to ensure that the full extent and implications of identified deficiencies are known. <br /> To fully understand the importance of any deficiency, you should obtain bids for its correction. <br /> Bids for repairs vary widely. You should always obtain at least three competitive bids. <br /> Certain limitations apply to any inspection, including those diligently performed by a qualified <br /> expert. The limitations on this inspection include any noted in the body of the report together <br /> with those listed under"Limitations on Inspections" at the end of the report. We consider these <br /> limitations unavoidable. If you make any use of the information contained in this report, it is <br /> necessary that you understand and accept these limitations. IF THESE LIMITATIONS ARE <br /> UNACCEPTABLE TO YOU,YOU SHOULD NOT RELY ON THE INFORMATION IN THIS <br /> REPORT FOR ANY PURPOSE WHATSOEVER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.