Laserfiche WebLink
Where existing BMPs are not already provided in the SWMMWW, the following <br />practices will be followed: <br /> <br />• Storm pipe cleaning – Storm pipe cleaning practices will follow the standard for <br />culverts located in a ditch system with inspection for scour and sedimentation to be <br />completed on a regular basis. In addition, pipes are to be cleaned, as needed, and <br />repairs made to the pipe system and inlets and outlets. Practices outlined in WSDOT’s <br />Best Management Practices Field Guide for ESA Habitat Protection (#2 and #3) <br />(incorporated by reference) will be followed. <br /> <br /> <br />• Road repair and resurfacing, including pavement grinding –Practices outlined in <br />WSDOT’s Best Management Practices Field Guide for ESA Habitat Protection (#1) <br />will be followed. <br /> <br />• Pavement striping maintenance - Practices outlined in WSDOT’s Best Management <br />Practices Field Guide for ESA Habitat Protection (#1) will be followed. <br /> <br />• Trash and pet waste management – The Port will conduct regular inspections for trash <br />and pet waste and remove such to an appropriate waste receptacle. <br /> <br />7.0 SPILL RESPONSE AND REPORTING REQUIREMENTS <br /> <br />7.1 Spill Response Plan – A Spill Response Plan shall be prepared by the Port and <br />approved by the City and County. A copy of the plan shall be available on the Premises <br />and accessible by all Port staff. <br /> <br />7.2 Spill Containment and Cleanup Kits - Spill containment and cleanup kits shall be <br />placed in a central location at or near the Premises. <br /> <br />8.0 ILLICIT DISCHARGE DETECTION AND ELIMINATION <br /> [Condition S5.C.9.d. (Phase I Permit), Conditions S5.C.5. (Phase II Permit)] <br />The Port shall implement the requirements of Condition S5.C.9.d of the Phase I Stormwater <br />Permit and Conditions S5.C.5. of the Phase II Stormwater Permit. Notify County and City <br />staff of an IDDE discovered (that is not a G3) within 7 days and provide documented <br />corrective actions within 21 days. <br /> <br />9.0 TRAINING PROGRAM <br /> [ConditionsPhase I Permit S5.C.8.e (Source Control), S5.C.9.e (IDDE) and S5.C.10.h <br />(Operation and Maintenance]; Phase II Permit S5.C.9.e (Source Control), S5.C.5.f <br />(IDDE) and S5.C.9.g (Operation and Maintenance] <br /> <br />Annually, the Port shall train staff responsible for operations or maintenance of the <br />stormwater systems, source control, and illicit discharge detection and elimination on the <br />Premises. Follow-up training will be provided on an as needed basis to address changes <br />in procedure, techniques or staffing. <br /> <br />10.0 RECORDS <br /> The Port shall maintain records for all activities, tasks, and obligations performed by the