My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/01/29 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/01/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:58:09 PM
Creation date
1/29/2025 2:55:28 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/29/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Where existing BMPs are not already provided in the SWMMWW, the following <br />practices will be followed: <br /> <br />• Storm pipe cleaning – Storm pipe cleaning practices will follow the standard for <br />culverts located in a ditch system with inspection for scour and sedimentation to be <br />completed on a regular basis. In addition, pipes are to be cleaned, as needed, and <br />repairs made to the pipe system and inlets and outlets. Practices outlined in WSDOT’s <br />Best Management Practices Field Guide for ESA Habitat Protection (#2 and #3) <br />(incorporated by reference) will be followed. <br /> <br /> <br />• Road repair and resurfacing, including pavement grinding –Practices outlined in <br />WSDOT’s Best Management Practices Field Guide for ESA Habitat Protection (#1) <br />will be followed. <br /> <br />• Pavement striping maintenance - Practices outlined in WSDOT’s Best Management <br />Practices Field Guide for ESA Habitat Protection (#1) will be followed. <br /> <br />• Trash and pet waste management – The Port will conduct regular inspections for trash <br />and pet waste and remove such to an appropriate waste receptacle. <br /> <br />7.0 SPILL RESPONSE AND REPORTING REQUIREMENTS <br /> <br />7.1 Spill Response Plan – A Spill Response Plan shall be prepared by the Port and <br />approved by the City and County. A copy of the plan shall be available on the Premises <br />and accessible by all Port staff. <br /> <br />7.2 Spill Containment and Cleanup Kits - Spill containment and cleanup kits shall be <br />placed in a central location at or near the Premises. <br /> <br />8.0 ILLICIT DISCHARGE DETECTION AND ELIMINATION <br /> [Condition S5.C.9.d. (Phase I Permit), Conditions S5.C.5. (Phase II Permit)] <br />The Port shall implement the requirements of Condition S5.C.9.d of the Phase I Stormwater <br />Permit and Conditions S5.C.5. of the Phase II Stormwater Permit. Notify County and City <br />staff of an IDDE discovered (that is not a G3) within 7 days and provide documented <br />corrective actions within 21 days. <br /> <br />9.0 TRAINING PROGRAM <br /> [ConditionsPhase I Permit S5.C.8.e (Source Control), S5.C.9.e (IDDE) and S5.C.10.h <br />(Operation and Maintenance]; Phase II Permit S5.C.9.e (Source Control), S5.C.5.f <br />(IDDE) and S5.C.9.g (Operation and Maintenance] <br /> <br />Annually, the Port shall train staff responsible for operations or maintenance of the <br />stormwater systems, source control, and illicit discharge detection and elimination on the <br />Premises. Follow-up training will be provided on an as needed basis to address changes <br />in procedure, techniques or staffing. <br /> <br />10.0 RECORDS <br /> The Port shall maintain records for all activities, tasks, and obligations performed by the
The URL can be used to link to this page
Your browser does not support the video tag.