Laserfiche WebLink
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br />An Ordinance creating a special improvement project entitled “Water Pollution Control Facility <br />Combined Conveyance Improvements” Fund 336, Program 032, and repealing Ordinance No. <br />3881-22. <br />Council Bill # <br />CB 2501-06 <br />Consideration: Plans & Systems Ordinance <br />Project: Water Pollution Control Facility Combined Conveyance Improvements <br />Partner/Supplier: <br /> Location: Water Pollution Control Facility (WPCF) <br />Preceding action: Ordinance 3881-22, approved on 7/6/22 <br />Fund: Fund 336 – Water and Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br /> <br />Briefing 1/22/25 <br />Proposed action 1/29/25 <br />Consent <br />Action 2/5/25 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br /> <br />Contact person: <br />Jeff Marrs <br /> <br />Phone number: <br />425-257-8967 <br /> <br />Email: <br />jmarrs@everettwa.gov <br />Initialed by: <br /> RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Ordinance 3881-22 authorized an appropriation of $2,000,000 for design of the project. <br />Additional funding in the amount of $20,100,000 is required to complete the project. This new <br />ordinance is necessary to program the additional funds needed for the construction phase of the <br />project. <br />This Ordinance will repeal Ordinance 4013-24, and authorizes the following appropriations to be <br />programmed: <br /> Design Phase (previously programmed) $ 2,000,000 <br /> Construction Phase (newly programmed) $ 20,100,000 <br /> Total Project Costs $ 22,100,000 <br />The total programmed available funding for design and construction of the project increased by <br />$20,100,000 and is now $22,100,000. <br />The funding sources for this project will be as follows: <br />Fund 401 - Water and Sewer Utility $ 22,100,000 <br />Total source of funds $ 22,100,000 <br /> <br />Project summary statement: <br />This project encompasses improvements to the treatment process at the Water Pollution Control <br />Facility. Currently, peak flows (wet weather flows) that exceed the plant headworks and the primary <br />clarifier capacities are bypassed to the head of Aerated Cell 1. These peak flows subsequently wash <br />solids out of the aerated cells and into the recirculation channel and the oxidation pond. The Combined <br />Conveyance Improvements Project will bypass the peak flows directly to the recirculation channel, <br />preventing solids washout from the aerated cells to the recirculation channel and the oxidation pond. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Water Pollution Control Facility <br />Combined Conveyance Improvements” Fund 336, Program 032, and repealing Ordinance No. 3881-22. <br /> <br /> <br /> <br /> <br />