Laserfiche WebLink
<br /> <br /> City Council Agenda Item Cover Sheet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: <br />An Ordinance creating a special improvement project entitled “Edgewater Creek Bridge <br />Replacement” Fund 303, Program 115, to accumulate all costs for the improvement and <br />repealing Ordinance No. 4002-24. <br />Council Bill # <br />CB 2501-07 <br />Consideration: Plans & Systems Ordinance <br />Project: Edgewater Creek Bridge Replacement <br />Partner/Supplier: WA State Department of Transportation (WSDOT) <br /> Location: Mukilteo Boulevard at Shore Avenue <br />Preceding action: Ordinance No. 3636-18, approved on 11/21/18 Ordinance No. 3719-19, approved on 12/18/19 Ordinance No. 4002-24, approved on 2/21/24 <br />Fund: Fund 303 – Public Works Improvement Projects <br />Agenda dates requested: <br /> <br /> <br />Briefing 1/22/25 <br />Proposed action 1/29/25 <br />Consent <br />Action 2/5/25 <br />Ordinance X <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Tom Hood <br /> <br />Phone number: <br />(425) 257-8809 <br /> <br />Email: <br />thood@everettwa.gov <br /> <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />Ordinance 4002-24 authorized an appropriation of $34,000,000 for design and construction of the <br />project. <br />The City was awarded an additional $850,000 DEMO grant from WSDOT in Congressionally Directed <br />Spending funds. This new ordinance is necessary to program the additional grant funds received. <br />This Ordinance will repeal Ordinance 4002-24, and authorizes the following appropriations to be <br />programmed: <br />Design and Construction (previously programmed) $ 34,000,000 <br /> Additional grant funds (newly programmed) $ 850,000 <br /> Total Project Costs $ 34,850,000 <br />The total programmed available funding for design and construction of the project increased by <br />$850,000 and is now $34,850,000. <br />The funding sources for this project will be as follows: <br />Bridge Program – Federal Funds $ 25,000,000 <br /> DEMO Grant ID # WA329 & WA368 $ 3,850,000 <br /> Fund 157 – Traffic Mitigation $ 6,000,000 <br />Total Funds $ 34,850,000 <br /> <br />Project summary statement: <br />This project will remove and replace the existing Edgewater Creek Bridge, which was built in 1946 and <br />is a vital link in a chain of three bridges that provide the only access to neighborhoods along Mukilteo <br />Boulevard. <br />The existing bridge is a non-redundant two girder composite deck concrete structure that is <br />structurally deficient in load capacity. In addition, the bridge is seismically vulnerable and functionally <br />obsolete due to narrow substandard traffic lanes and sidewalks. <br /> <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Edgewater Creek Bridge <br />Replacement” Fund 303, Program 115, to accumulate all costs for the improvement and repealing <br />Ordinance No. 4002-24. <br />