My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 SE EVERETT MALL WAY BASE FILE 2025-04-14
>
Address Records
>
SE EVERETT MALL WAY
>
10
>
BASE FILE
>
10 SE EVERETT MALL WAY BASE FILE 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:29:53 PM
Creation date
1/29/2025 2:55:56 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
10
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 2/7/2022 2/7/2022 FIRE 02-FINAL BRONSON APPROVAL <br /> PEARSON <br /> Notes: <br /> 2/8/2022 2/8/2022 BLDG 01- KURT KECK OTHER <br /> CONSULTATION <br /> Notes: <br /> Needs an inspection after 12pm.Told to call in morning. Marc 360-770-3994 <br /> (2/8/2022 3:16 PM KMK) <br /> Contractor wanted a walk through in prep for final inspection.Discussed process. <br /> 2/9/2022 2/10/2022 BLDG 01- KURT KECK OTHER see notes <br /> CONSULTATION <br /> Notes: <br /> contractor would like to begin stocking E unit <br /> (2/10/2022 7:04 AM KMK) <br /> Ok to begin stocking side E as noted. <br /> Keep area clear for electrical inspector to complete his inspections <br /> 2/11/2022 2/11/2022 TEMP CERTIFICATE KURT KECK APPROVAL Unit E(east side)TCO 30 days <br /> OF OCCUPANCY <br /> Notes: <br /> final inspection for Suite E <br /> "Please note on the request that if the inspector needs to go back to the site,please go between 10 AM and 6 PM,and stop at unit C galaxy vapor to <br /> get a key to get into suite E if the front door is locked.Thanks again appreciate your help.Marc" <br /> Marc 360-770-3994 mestvold@comcast.net <br /> (2/11/2022 2:17 PM KMK) <br /> Unit E(east side)TCO(Temporary Certificate of Occupancy)30 days. <br /> Please recall for final inspection when unit D is ready. <br /> 4/1/2022 4/1/2022 BLDG 08-FRAMING I KURT KECK APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 3/31/2022 8:19 PM Nathan Collord <br /> want to close out final on insulation and framing on demising wall and the shell,we have electrical inspect tomorrow as well <br /> Contact Name:Nathan Collord <br /> Site Address:10 SE EVERETT MALL WAY STE D&E <br /> Phone:2062559554 <br /> e-Mail:collordnathan@gmail.com <br /> 4/1/2022 4/1/2022 BLDG 12- KURT KECK APPROVAL eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 3/31/2022 8:19 PM Nathan Collord <br /> want to close out final on insulation and framing on demising wall and the shell,we have electrical inspect tomorrow as well <br /> Contact Name:Nathan Collord <br /> Site Address:10 SE EVERETT MALL WAY STE D&E <br /> Phone:2062559554 <br /> e-Mail:collordnathan@gmail.com <br /> I <br /> Printed:Wednesday, 29 January,2025 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.