My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
130 W INTERCITY AVE 2025-04-15
>
Address Records
>
W INTERCITY AVE
>
130
>
130 W INTERCITY AVE 2025-04-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:37:47 PM
Creation date
1/29/2025 3:13:12 PM
Metadata
Fields
Template:
Address Document
Street Name
W INTERCITY AVE
Street Number
130
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2012-026 Description:ADD BONUS ROOM WITH BAR/OFFICE/GAME AREA/BATH <br /> Applied: 12/18/2020 Approved: 5/13/2021 Site Address: 130 W INTERCITY AVE <br /> Issued:6/1/2021 Finaled: City,State Zip Code: EVERETT,WA <br /> Status: EXPIRATION NOTICE SENT Applicant:JOEY PEREZ <br /> Parent Permit: Owner: KEBAYA LYDIA MORAA&OMETE FREDRICK <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> ADD BONUS ROOM WITH BAR/OFFICE/GAME AREA/BATH <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 7/12/2021 7/12/2021 BLDG 02- KURT KECK APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> WOULD PREFER A MORNING INSPECTION <br /> 7/12/2021 7/12/2021 BLDG 03- KURT KECK APPROVAL <br /> FOUNDATION WALL <br /> Notes: <br /> 7/12/2021 7/12/2021 BLDG 04-UFER KURT KECK APPROVAL <br /> GROUND <br /> Notes: <br /> BLDG 05- <br /> 9/7/2021 9/7/2021 UNDERFLOOR KURT KECK APPROVAL <br /> FRAMING <br /> Notes: <br /> 1/19/2022 1/19/2022 BLDG 08-FRAMING KURT KECK NOT READY see notes <br /> Notes: <br /> 2067738308 Frederick <br /> foomete@gmail.com <br /> (1/19/2022 2:47 PM KMK) <br /> Site visit: <br /> 1.Complete plumbing rough in inspection <br /> 2.Schedule and complete mechanical rough in inspection. <br /> 3.When the above has been completed,reschedule for framing and wall insulation inspection <br /> I <br /> Printed:Wednesday, 29 January,2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.