Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2410-102 Description: 15 FT GAS PIPING W. RELOCATION OF GAS FURNACE- <br /> INTERIOR <br /> Applied: 10/28/2024 Approved: 10/29/2024 Site Address: 6426 BEVERLY LN <br /> Issued: 10/29/2024 Finaled: 12/10/2024 City,State Zip Code: EVERETT,WA 98203-4326 <br /> Status: FINALED Applicant:CM AIR PROS LLC(CONST) <br /> Parent Permit: Owner: DURBIN BRIAN/ROHDE MEAGAN <br /> Parent Project: Contractor: CM AIR PROS LLC(CONST) <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 11/21/2024 11/21/2024 GAS 01-ROUGH IN JASON APPROVAL see notes <br /> MORRISSEY <br /> Notes: <br /> Rough gas piping ok to new furnace location. Performed bubble leak test of all new gas connections in lieu of a pressure test. <br /> Rough gas piping ok to new furnace location. Performed bubble leak test of all new gas connections in lieu of a pressure test. <br /> 11/21/2024 11/21/2024 GAS 03-FINAL JASON PARTIAL <br /> MORRISSEY APPROVAL <br /> Notes: <br /> 11/21/2024 11/21/2024 MECH 04-ROUGH JASON APPROVAL eTRAKiT Inspection Request <br /> IN MORRISSEY <br /> Notes: <br /> 11/12/2024 4:00 PM CM AIR PROS LLC(CONST) <br /> NEEDS TO BE IN AM <br /> Contact Name:BRIAN DURBIN <br /> Site Address:6426 BEVERLY LN <br /> Phone:6309657715 <br /> e-Mail:PERMITS@CMHEATING.COM <br /> 11/21/2024 11/21/2024 MECH 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> -Maintain minimum 1"airspace to combustibles around b vent exhaust in attic.B vent is very close to roof sheeting.-Install insulation shield around b <br /> vent exhaust in attic per the IRC:G2427.5.10(503.5.11)Insulation ShieldWhere a factory-built chimney passes through insulated assemblies,an <br /> insulation shield constructed of steel having a thickness of not less than 0.0187 inch(0.475 mm)(nominal 26 gage)shall be installed to provide <br /> clearance between the chimney and the insulation material.The clearance shall be not less than the clearance to combustibles specified by the chimney <br /> manufacturer's installation instructions.Where chimneys pass through attic space,the shield shall terminate not less than 2 inches(51 mm)above the <br /> installation materials and shall be secured in place to prevent displacement. <br /> I <br /> Printed:Thursday,30 January, 2025 1 of 2 rk <br /> SUPERION <br />