My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 MAPLE ST 2025-03-31
>
Address Records
>
MAPLE ST
>
931
>
931 MAPLE ST 2025-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 11:35:55 AM
Creation date
1/30/2025 1:58:52 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
931
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62 Optional Equipment (for qualified installers only) <br /> 11 Remove the control panel to access the gas control valve. The stepper motor(adjustable regulator) <br /> has an installation sheet included with it—make sure to follow all of the directions. Place the stepper <br /> motor on the gas control valve (see pictures below)—MAKE SURE IT IS CORRECTLY ORIENTED. <br /> Secure using the screws included with the motor—tighten to 25 Lb-inches. Leak test this area after <br /> installation to verify proper installation. <br /> NOTE: Install the identification label that is included with the conversion kit, to the valve body where it <br /> can be easily seen. <br /> 11 Restore the appliance to the correct configuration. Make the gas line connection, bleed the gas line <br /> (if applicable), start the heater and thoroughly leak-test all gas connections and the gas control valve. <br /> NOTE: See page 37 for information regarding proper operation of the appliance. Test all functions <br /> described in the operation section to verify that everything is operating as expected. <br /> ©Travis Industries 4/19/23- 1443 Greenfield GSR2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.