Laserfiche WebLink
• Installationqualified installers only) <br /> Packing List Additional Items Required <br /> • Remote Control Vent(see"Venting Requirements"for details) <br /> • Propane Conversion Kit Gas Line Equipment(shutoff valve, pipe, etc.) <br /> • Log Set LP Units Require GSR Stepper Motor <br /> • '/2" FPT to 3/8" Flare Fitting (4-pack= 94400999, single=250-01463) <br /> • Rear Vent Cover <br /> Installation Overview <br /> See <br /> See "Vent "Clearances" <br /> Requirements" <br /> See "Electrical l <br /> Requirements" <br /> Grounded outlet <br /> required <br /> See "Gas Line <br /> Installation" <br /> See "Floor <br /> Protection <br /> Requirements" <br /> ❑8 Installation Hints <br /> • If converting to LP, convert the appliance prior to installation. <br /> • Install the logs last-they are fragile. <br /> • When determining the location of the stove, locate the wall studs (for horizontal penetrations) and <br /> ceiling trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure <br /> the vent does not intersect with a framing member. <br /> • Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start <br /> this heater. This is normal. We recommend you open windows to vent the room. <br /> ©Travis Industries 4/19/23- 1443 Greenfield GSR2 <br />