ABBREVIATIONS PLUMBING LEGEND 2021 GENERAL NOTES PROJECT INFORMATION
<br /> DOMESTIC COLD WATER(DCW) ADDRESS:2300 MERRILL CREEK PKWY,EVERETT,WA 98203
<br /> AAV AUTOMATIC AIR VENT CODE COMPLIANCE:
<br /> AD ACCESS DOORI AREA DRAIN ---- DOMESTIC HOT WATER(DHW) COMPLETE INSTALLATION SHALL BE PER THE FOLLOWING CODES: PARCEL#:28040200300200
<br /> AFF ABOVE FINISHED FLOOR 2021 UNIFORM PLUMBING CODE(UPC) AMechanicai
<br /> AG ABOVE GRADE ----- DOMESTIC HOT WATER RECIRC.(DHWR) 2021 WASHINGTON STATE ENERGY CODE(WSEC) ZONING:NIA
<br /> AL ALUMINUM 20211NTERNATIONAL BUILDING CODE(IBC)
<br /> ATM ATMOSPHERE WASTE(W) 2021 INTERNATIONAL MECHANICAL CODE(IMC) LEGAL DESCRIPTION:
<br /> SAS BUILDING AUTOMATION SYSTEM 2021 WASHINGTON STATE ENERGY CODE(WSEC) SEC 02 TWP 28 RGE 04LOT 5A OF SEAWAY CENTER FOUR BSP REC VOL 1 OF BSP'S P.O.Box 249
<br /> BFP BACKFLOW PREVENTER VENT(V) REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTIONS. PG 246-247 AF NO 9203025002 BEING PTN OF SW114 2623 West Valley Hwy.Auburn,
<br /> BFV BUTTERFLY VALVE WA 98071
<br /> BG BELOW GRADE O PIPE UP Tel:(253)838-9780
<br /> BGS BUG SCREEN Fax:(253)833-1384
<br /> BHP BRAKE HORSE POWER C PIPE DN 1. PLUMBING DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY REFLECT EVERY REQUIRED OFF-SET,FITTING,OR AU-BU-RM1163BA
<br /> BMS BUILDING MONITORING SYSTEM ACCESSORY.THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE DOCUMENTS THAT ARE NOT VICINITY MAP
<br /> BOB BOTTOM OF BEAM PIPE TEE UP DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY.THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST
<br /> BOD BOTTOM OF DUCT CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE
<br /> BOP BOTTOM OF PIPE - PIPE TEE DOWN ENGINEER BEFORE BEING INSTALLED.DO NOT SCALE DRAWINGS.
<br /> BTU BRITISH THERMAL UNITS
<br /> BTUIH BRITISH THERMAL UNITS PER HOUR [- CAP 2. ITEMS MARKED AS TYPICAL APPLY TO THAT DRAWING SHEET ONLY.UNLESS NOTED OTHERWISE,DETAILS MARKED AS TYPICAL 525
<br /> BV BALL VALVE APPLY TO THE DRAWING SET.
<br /> CB CATCH BASIN PIPE CONTINUATION
<br /> CC CONTROLS CONTRACTOR 3. COORDINATE EQUIPMENT INSTALLATION WITH BUILDING STRUCTURE AND ALL OTHER TRADES(ARCHITECTURAL,CIVIL,ELECTRICAL, LI9111h0use
<br /> CFH CUBIC FEET PER HOUR STRUCTURAL,LANDSCAPE,ETC)PRIOR TO FABRICATION,PURCHASE,AND/OR INSTALLATION OF SCOPE OF WORK.VERIFY
<br /> ON WALL CLEANOUT PBf.I(
<br /> Cl CAST IRON SPECIFICATIONS AND PROJECT REQUIREMENTS FOR CUTTING AND PATCHING.COORDINATE AND VERIFY CLEARANCES BEFORE
<br /> CND CONDENSATE DRAIN COMMENCING WORK.DIMENSIONS TO EQUIPMENT TO BE INCLUDED WITH AS-BUILT. 9
<br /> CNTR CONTRACTOR 6 FLOOR CLEANOUT
<br /> CO CLEAN OUT } HOSE BIBB 4. LOCATE ALL PLUMBING FIXTURES PER THE ARCHITECTURAL DRAWINGS.
<br /> DCBP DEMO MUICIIteO
<br /> DCBP DOUBLE CHECK BACKFLOW ASS PREV. 5. VERIFY SITE VOLTAGES AND ELECTRICAL LOADS PRIOR TO ORDERING ANY EQUIPMENT.
<br /> DCVA DOUBLE CHECK VALVE ASSEMBLY � MIXING VALVE
<br /> DOC DIRECT DIGITAL CONTROL 6. EQUIPMENT SHALL BE REGULARLY CATALOGED FROM THE MANUFACTURER.ALL EQUIPMENT SHALL BE FREE FROM DEFECTS IN
<br /> DFU DRAINAGE FIXTURE UNIT BALL VALVE MATERIAL,WORKMANSHIP,AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN.EQUIPMENT SHALL BE APPROVED FOR I
<br /> DIN DOWN r� BUTTERFLY VALVE INSTALLATION IN THE STATE OF WASHINGTON.ALL EQUIPMENT SHALL BE LABELED AND TAGGED PER THE DRAWINGS.
<br /> E,(E) EXISTING
<br /> ELEC ELECTRICAL 7. EQUIPMENT AND VALVES SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS UNLESS SHOWN ON THE ARCHITECTURAL
<br /> ELEV ELEVATION �- CHECKVALVE DRAWINGS.REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR.OBSERVE EQUIPMENT _Z
<br /> EWT ENTERING WATER TEMPERATURE CLEARANCES.ALL MECHANICAL EQUIPMENT CLEARANCES NOTED ON THE DRAWINGS AS 36"FOR MECHANICAL ACCESS OR
<br /> EXH EXHAUST 141 CHECK VALVE(WITH ARROW) ELECTRICAL ACCESS LESS THAN 460V,42'FOR ELECTRICAL ACCESS OF 460V,OR SPECIFIED FOR OTHER CLEARANCES PER THE
<br /> EXP EXPANSION MANUFACTURER. OeRlg Future Of Fllght (126
<br /> EXP EXPANSION BALANCING VALVE
<br /> F,(F) FUTURE 8. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'RECOMMENDATIONS,
<br /> FC FLEXIBLE CONNECTION PRESSURE REDUCING VALVEIREGULATOR CONTRACT DOCUMENTS,AND APPLICABLE CODES AND REGULATIONS. `\
<br /> FCO FLOOR CLEAN OUT ci
<br /> FCU FAN COIL UNIT VALVE(GENERIC) 9. REFER TO STRUCTURAL FOR ALLOWABLE METHODS AND ACCEPTABLE LOADS FOR HANGING PIPES FROM THE STRUCTURAL
<br /> FD FLOOR DRAIN MEMBERS.
<br /> FPM FEET PER MINUTE [x1 GATE VALVE
<br /> FPS FEET PER SECOND 10. VERIFY PROJECT SEISMIC REQUIREMENTS.REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR THE LOCATIONS OF P81 rle Field
<br /> COStCO
<br /> FS FLOOR SINK �4- GLOBE VALVE SEISMIC JOINTS AND EXPANSION JOINTS.PROVIDE JOINTS FOR ANY PIPING CROSSING A SEISMIC OR EXPANSION JOINT.UNLESS
<br /> FTD FOOTING DRAINAGE PROVIDED BY THE STRUCTURAL ENGINEER,USE THE SMACNA SEISMIC RESTRAIN MANUAL FOR GUIDELINES.
<br /> FU FIXTURE UNIT STRAINER
<br /> GALV GALVANIZED 11. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE,
<br /> GC GENERAL CONTRACTOR CIRCULATING PUMP
<br /> GI PH GREASE INTERCEPTOR f SITE MAP
<br /> G GALLONS PER HOUR FLOW ARROW
<br /> GPM GALLONS PER MINUTE
<br /> GWB GYPSUM WALL BOARD Q PRESSURE GAUGE 0 F
<br /> HB HOSE BIBB 2021 WASHINGTON STATE ENERGY CODE NOTES
<br /> HP HEAT PUMP,OR HORSE POWER TEMPERATURE GAUGE
<br /> HX HEAT EXCHANGER "•� -
<br /> ID INSIDE DIMENSION jh TEMPERATUREIPRESSURE RELIEF VALVE g,..
<br /> IE INVERT ELEVATION
<br /> INS INSULATION 1. THE COMPLIANCE PATH IS PRESCRIPTIVE.
<br /> T TEMPERATUREIPRESSURE TEST PORT 2 SST 1N Hq
<br /> UNT LEAVING WATER TEMPERATURE
<br /> MBH 1,000 BTUIH III UNION 2. WSEC C103.6:CLOSEOUT DOCUMENTS SHALL BE PROVIDED TO THE OWNER. f,� " �r •�� - �• C>'p`v � ror S
<br /> MECH MECHANICAL
<br /> MH MAN HOLE 3. WSEC C408.1:BUILDINGS SHALL BE COMMISSIONED FOR ALL MECHANICAL AND PLUMBING SYSTEMS.TOTAL MECHANICAL SYSTEMS +. -
<br /> N,(N) NEW WITH COOLING CAPACITY LESS THAN 240,000 BTUIH AND HEATING CAPACITY LESS THAN 300,000 BTUIH ARE EXEMPT FROM THE
<br /> NC NORMALLY CLOSED COMMISSIONING PROCESS PER WSEC C408.1 EXCEPTION 1.THE LARGEST SERVICE WATER HEATING SYSTEM WITH CAPACITY LESS --
<br /> NCI
<br /> NOT IN CONTRACT THAN 200,000 BTUIH WHERE THERE ARE NO POOLS OR PERMANENT SPAS ARE EXEMPT FROM THE COMMISSIONING PROCESS PER °rarese°G�Z
<br /> NO NORMALLY OPEN GENERAL LEGEND WSEC C408.1 EXCEPTION 2.WHEN REQUIRED,COMMISSIONING SHALL BE PERFORMED PER WSEC C408 AND SHALL INCLUDE: `S7ONAL
<br /> NPCW NON-PORTABLE COLD WATER A. COMMISSIONING PLAN
<br /> OC ON CENTER B. SYSTEMSEQUIPMENT
<br /> AND BALANCING 11 99�08�2024
<br /> OD OUTSIDE DIMENSION SYMBOL DESCRIPTION C. HVAC EQUIPMENT AND CONTROLS FUNCTIONAL TESTING
<br /> OFCI OWNER FURNISHED CNTR INSTALL. D. SUPPORTING DOCUMENTATION IN THE FORM OF OPERATION AND MAINTENANCE AND RECORD DOCUMENTS WE
<br /> OPNG OPENING EQ-01-01 EQUIPMENTTAG E. COMMISSIONING REPORT
<br /> PLBG PLUMBING
<br /> POC POINT OF CONNECTION 2"FX-1 FIXTURE TAG 4. WSEC C408.2.2:PROVIDE BALANCING DEVICES FOR SUPPLY AIR OUTLETS,ZONE TERMINAL DEVICES AND HYDRONIC COILS,AND AS
<br /> PRV PRESSURE REDUCING VALVE INDICATED ON THE CONTRACT DOCUMENTS.BALANCING DEVICES SHALL INCLUDE,BUT ARE NOT LIMITED TO,DAMPERS,
<br /> PSIA POUND PER SQUARE INCH(ABSOLUTE) � FLAG NOTE TEMPERATURE AND PRESSURE TEST CONNECTIONS,AND BALANCING VALVES.CONTACT THE ENGINEER FOR CLARIFICATION AND ANY
<br /> PSIG POUNDS PER SQUARE INCH(GAUGE) VARIANCES.AIRAND WATER FLOW RATES SHALL BE MEASURED AND ADJUSTED TO DELIVER FINAL FLOW RATES WITHIN TOLERANCES.
<br /> PW PUMPED WASTE POINT OF CONNECTION
<br /> QD QUICK DISCONNECT
<br /> R,(R) RELOCATE
<br /> RD ROOF DRAIN 1 DETAIL SYMBOL
<br /> RIO ROUGH IN ONLY M1.00 SCOPE OF WORK
<br /> RPBA RED.PRIES.EAMCBACKFLOW CONDENSATE
<br /> PLUMBING NOTES
<br /> SCND STEAM CONDENSATE
<br /> SSTL STAINLESS STEEL 1 1. INSTALL OFCI SINK WITH ASSOCIATED PLUMBING.PROVIDE SUMP PUMP.
<br /> STBY STANDBY SECTION SYMBOL
<br /> Mi.W 1. CONTRACT DOCUMENT DRAWINGS ARE SCHEMATIC.THEY ARE INTENDED CONVEY SCOPE AND GENERAL ARRANGEMENT.THEY DO
<br /> STD STANDARD NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAYBE REQUIRED..THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL 2. PROVIDE RPBP FOR WATER CONNECTIONS TO EQUIPMENT.
<br /> STL STEEL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
<br /> SUSP SUSPENDED 3. INSTALL OFCI EMERGENCY SHOWER WITH ASSOCIATED PLUMING.PROVIDE
<br /> TO TOP OF DUCT ZONE 1-1-01 ZONE TAG 2. MATERIALS,METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE CURRENT OF THE UNIFORM PLUMBING THERMOSTATIC MIXING VALVE. O PERMIT 11/08/2024
<br /> TOP TOP OF PIPE B00 FT2 CODE AND REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTION.
<br /> TOS TOP OF STEEL No. Revision/Issue Date
<br /> VFD VARIABLE FREQUENCY DRIVE 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS.SD VARIABLE KEY PLAN
<br /> VTR VENT TOROOFDDRIVE PLUMBING SHEET INDEX
<br /> 4. SLOPE ALL WASTE PIPING AT 2%UNLESS OTHERWISE NOTED ON DRAWINGS.OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE
<br /> WC WATER COLUMN INSTALLING PIPING AT LESS THAN 2%(EVEN IF LESSER SLOPE ID INDICATED ON DRAWINGS). SHEET DESCRIPTION
<br /> WCO WALL CLEANOUT
<br /> WH WALL HYDRANT 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313.3 OF THE 2021 UNIFORM PLUMBING CODE& P0.00 PLBG COVERSHEET
<br /> WSFU WATER SOURCE FIXTURE UNIT SECTION 1613.3 OF THE 2021 IBC,PROVIDE EARTHQUAKE SWAY BRACING AT 40'INTERVALS FOR ALL PIPING WHICH IS GREATER THAN P2.01 LEVEL 1-AREA'B"-PLBG PLAN&SCHEDULES
<br /> ZCV ZONE CONTROL VALVE 3"WHICH HAVE HANGERS THAT EXCEED 12"IN LENGTH AS DESCRIBED BY THE SMACNA BRACING MANUAL.
<br /> 6. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO
<br /> MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL.
<br /> 7. FOR EXACT ROUGH-IN LOCATIONS AND ELEVATIONS OF PLUMBING FIXTURES REFER TO ARCHITECTURAL DRAWINGS.
<br /> COLD WATER PIPE SIZING TABLE HOT WATER PIPE SIZING TABLE B. PROVIDE LOOSE KEY STOPS OR ANGLE VALVES AT ALL FIXTURES.
<br /> PIPE SIZE MATERIAL MATERIAL FLOW RATE VELOCITY FIXTURE UNITS FIXTURE UNITS PIPE SIZE FLOW RATE VELOCITY FIXTURE UNITS 9. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS.IF THE ELECTRICAL IS GROUNDED TO THE PIPE SYSTEM,THEN
<br /> (INCHES) (GPM) (FTIS) (FLUSH TANK) (FLUSH VALVE) (INCHES) (GPM) (FTIS) (FLUSH TANK) ALL DIELECTRIC CONNECTIONS REQUIRE AJUMPER TO MAINTAIN ELECTRICAL GROUNDING.
<br /> 1/2" COPPER L 4.8 6.6 0-2 0-1 1/2" COPPER L 3.6 5.0 0-2 10. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR,WALL,AND FOOTING SLEEVES.
<br /> 3/4" COPPER L 12 8 3-8 2-3 3/4" COPPER L 7.5 5 3-4 ^4�'�•^•=^e�dm,
<br /> 1" COPPER L 23.6 9.2 9-35 4-9 1" COPPER L 12.9 5 5-9 ZAP ENERGY WET LAB
<br /> 1-1/4" COPPER 39.2 10 36-90 10-30 1-1/4" COPPER 19.6 5.0 10-20 SANITARY WASTE PIPE SIZING
<br /> 1-1/2" COPPER L 55.4 10 91-160 31-70 1-11T COPPER L 27.7 5.0 21-45 2300 MERRILL CREEK
<br /> 2" COPPER L 96.5 10 161-400 71-250 2" COPPER L 48.2 5.0 46-140 MAXIMUM UNIT LOADING AND MAXIMUM LENGTH OF DRAINAGE AND VENT PIPING-SEE UPC TABLE 703.2 FOR PARKWAY
<br /> NOTES: NOTES: DETAILS. EVERETT,WA 98203
<br /> 1. PIPING MATERIAL:COPPER TYPE L 1. PIPING MATERIAL:COPPER TYPE L SIZE OF PIPE INCHES 1 1/4 1 1/2 2 3 4 5 6 8 10 12
<br /> 2. VELOCITY:MAX=7 FT/S 2. VELOCITY:MAX=5 FT/S MAXIMUM UNITS-DRAINAGE PIPING
<br /> VERTICAL 1 2 16 48 256 600 1380 3600 5600 8400 "
<br /> 3. ABS.ROUGHNESS:e=0.000005 FT 3. ABS.ROUGHNESS:e=0.000005 FT HORIZONTAL-114"SLOPE 1 1 8 35 216 428 720 2640 4680 8200
<br /> HORIZONTAL-118"SLOPE 172 342 576 2112 3744 6560 P O"O O
<br /> MAXIMUM LENGTH•DRAINAGE PIPING
<br /> VERTICAL 45 65 85 212 300 390 510 750 _
<br /> VENT PIPING-MINIMUM 112 DIAMETER OF DRAIN.
<br /> MAXIMUM UNITS 1 8 24 84 256 600 1380 3600 - - PLBG COVERSHEET
<br /> MAXIMUM LENGTHS,(FEET) 45 60 120 212 300 390 510 750
<br /> - KH "GZ cMW
<br /> �1110812024
<br /> NO SCALE
<br />
|