My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3617 UPLAND AVE 2025-03-28
>
Address Records
>
UPLAND AVE
>
3617
>
3617 UPLAND AVE 2025-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:12:38 PM
Creation date
1/31/2025 1:50:41 PM
Metadata
Fields
Template:
Address Document
Street Name
UPLAND AVE
Street Number
3617
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 7/24/2023 <br /> City of Everett Permit Services Public Works Permit#: PW2307-012 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EV E R E T T Everett, WA 98201 Planning Reference#: <br /> everettwa.gov/permits Public Works Fee: $1178.63 <br /> WASHINGTON Perm itSeryices@eyerettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> TUCKER JUSTIN KEN & RHEALENE S JUSTIN & RHEALENE TUCKER <br /> 3617 UPLAND AVE <br /> EVERETT,WA 98203-1241 <br /> PHONE: PHONE:4252396003 <br /> SITE ADDRESS:3617 UPLAND AVE TAX PARCEL ID#:00433700000500 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:SITEWORK FOR 2-LOT SHORT PLAT-TUCKER <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at all <br /> times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. Full lane width grind and overlay is required for trenches greater than 100' in length, multiple cuts within a 100'length section, <br /> and/or as directed by the City PW Inspector. <br /> 7. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under <br /> a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8. As-builts of water,sanitary sewer,and storm systems are required to be submitted to the PW Inspector per City"Design and Construction <br /> Standards and Specifications for Development" prior to the utilities being brought online.Water,sewer,and storm as-builts may be <br /> submitted separately as they become available.Water as-builts MUST be submitted prior to the Water Department making connection to <br /> the public water system and putting the new water main in service. It is encouraged for the water system to be surveyed prior to cover. <br /> 9. A Declaration of Covenant for Stormwater BMPs shall be submitted to the City prior to final approval/close out of the permit. <br /> 10. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 11. A recorded Easement document(5ft Right of way dedication)shall be submitted prior to permit final. <br /> 12. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained from <br /> the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic control plan <br /> to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 13. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this <br /> permit. <br /> PERMIT FEE BREAKDOWN: <br /> Erosion Control......................................................................$60.00 <br /> Grade/Fill/Excavate(180 CY).................................................$70.00 <br /> Paving(3225 SF)....................................................................$45.00 <br /> PW Plan Review.....................................................................$20.00 <br /> PW Site Inspection.................................................................$20.00 <br /> Stormwater System Development Fee(3225 SF)................$963.63 <br /> Page 1 of 2 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.