My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
535 VIEW RIDGE DR 2025-03-31
>
Address Records
>
VIEW RIDGE DR
>
535
>
535 VIEW RIDGE DR 2025-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:41:10 PM
Creation date
1/31/2025 2:02:21 PM
Metadata
Fields
Template:
Address Document
Street Name
VIEW RIDGE DR
Street Number
535
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 6:Protect Slopes <br /> The TESC General Notes, Site Grading Notes, and Seeding Notes included in the construction plan set are <br /> intended to address the following requirements for slope protection. <br /> • Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. <br /> • Consider soil type and its potential for erosion. <br /> • Reduce slope runoff velocities by reducing the continuous length of slope with terracing and diversions, <br /> reduce slope steepness, and roughen slope surface. <br /> • Divert upslope drainage and run-on waters from off-site with interceptors at top of slope. Off-site <br /> stormwater should be handled separately from stormwater generated on the site. Diversion of off-site <br /> stormwater around the site may be a viable option. Diverted flows shall be redirected to the natural <br /> drainage location at or before the property boundary. <br /> • Contain downslope collected flows in pipes, slope drains, or protected channels_ <br /> • Provide drainage to remove ground water intersecting the slope surface of exposed soil areas. <br /> • Excavated material shall be placed on the uphill side of trenches, consistent with safety and space <br /> considerations. <br /> • Check dams shall be placed at regular intervals within trenches that are cut down a slope. <br /> • Stabilize soils on slopes, as specified in Element#5. <br /> There are no steep slopes on this project. The site pad will be graded out to 1.0%. <br /> Relative BMPs for this Category <br /> BMP C120: Temporary and Permanent Seeding <br /> BMP C121: Mulching <br /> BMP C123: Plastic Covering <br /> BMP C124: Sodding <br /> BMP C206: Level Spreader <br /> BMP C234: Vegetated Strip <br /> /S <br />
The URL can be used to link to this page
Your browser does not support the video tag.