Laserfiche WebLink
PUBLIC WORKS Date 7/11/2005 <br /> Public Works Permit#F40507"016 <br /> PERMIT00507-009 <br /> Building Permit# <br /> OLTT PUBLIC WORKS DEPARTMENT Planning Reference# <br /> 3200 Cedar Street <br /> Everett,WA 98201 Public Works Fee$ $25.00 <br /> (425)257-8810 <br /> Guarantee$ <br /> OWNER NAMg D PARR L!{P.LK .bi APPLICANT NAMLOW <br /> AND ADDRESTO BOX 910 AND ADDRESS: <br /> CLINTON frig. 98236 <br /> PHONE: 4252368229 PHONE: <br /> TAX PARCEL I.D.#01014600002300 PROJECTADDRESS311 46TH ST SE #LOT 23 <br /> 1w-a HPUQE <br /> DESCRIPTION OF <br /> PROPOSED WORK: <br /> LCAT `,`j CAMBERL Y <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance-phone(425)257-8810 <br /> 2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br /> Standards and Specifications. <br /> 3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br /> 4. Connect side sewer per City of Standard #601. <br /> 5. Connect rooftop downspouts to the drainage system provided for this lot. I <br /> C/) <br /> W <br /> O <br /> -7, <br /> 0 <br /> V! <br /> O <br /> 0 <br /> TO POSTING //z 5/f <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> -97 "1-/o5" The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> A rov for Constructionto damages,costs,expenses,or causes of action that may arise <br /> / because of installation and maintenance of the improvement or <br /> ii) other right-of-way use hereto applied for and further agrees to <br /> remove sa i- upon notice from the City and to replace public <br /> FINAL INS TION prope aged th eb <br /> Approved as Constructed Date <br /> % 1,/ — Of <br /> Signature of App'cant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br /> TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />