Laserfiche WebLink
" 'FOR <br /> 6 MEMBER REPORT PASSED <br /> upper floor,9'door header <br /> 1 piece(s)3 1/8"x 12" 24F-V4 DF Glulam <br /> Overall Length:9' 10" <br /> 0 <br /> a o <br /> All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. <br /> Design Results Actual 0 Location Allowed Result LDF Load:Combination(Pattern) System:Floor <br /> Member Reaction(Ibs) 4219 @ 2" 7109(3.50") Passed(59%) -- 1.0 D+0.75 L+0.75 S(All Spans) Member Type:Drop Beam <br /> Building Use:Residential <br /> Shear(Ibs) 2730 @ 1'3 1/2" 6625 Passed(41%) 1.00 1.0 D+1.0 L(All Spans) Building Code:IBC 2018 <br /> Pos Moment(Ft-Ibs) 8496 @ 4'11" 15000 Passed(57%) 1.00 1.0 D+1.0 L(All Spans) Design Methodology:ASD <br /> Live Load Defl.(in) 0.132 @ 4'11" 0.317 Passed(L/861) -- 1.0 D+0.75 L+0.75 S(All Spans) <br /> Total Load Defl.(in) 0.194 @ 4'11" 0.475 Passed(L/587) -- 1.0 D+0.75 L+0.75 S(All Spans) <br /> • Deflection criteria:LL(L/360)and TL(L/240). <br /> •Allowed moment does not reflect the adjustment for the beam stability factor. <br /> •Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L=9'6". <br /> •The effects of positive or negative camber have not been accounted for when calculating deflection. <br /> •The specified glulam is assumed to have Its strong laminations at the bottom of the beam.Install with proper side up as indicated by the manufacturer. <br /> •Applicable calculations are based on NDS. <br /> Bearing Length Loads to Supports(Ibs) <br /> Supports Total Available Required Dead Floor Live Roof Live Snow Total Accessories <br /> 1-Column-HF 3.50" 3.50" 2.08" 1343 2360 1180 1475 6358 Blocking <br /> 2-Column-HF 3.50" 3.50" 2.08" 1343 2360 1180 1475 6358 Blocking <br /> •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. <br /> Lateral Bracing Bracing Intervals Comments <br /> Top Edge(Lu) 9'10"o/c <br /> Bottom Edge(Lu) 9'10"o/c <br /> •Maximum allowable bracing intervals based on applied load. <br /> Dead Floor Live Roof Live Snow <br /> Vertical Loads Location(Side) Tributary Width (0.90) (1.00) (non-snow:1.25) (1.15) Comments <br /> 0-Self Weight(PLF) 0 to 9'10" N/A 9.1 <br /> 1-Uniform(PSF) 0 to 9'10"(Front) 12' 22.0 40.0 20.0 25.0 Default Load <br /> Member Notes <br /> Header for 9'garage door <br /> Supports roof and upper floor <br /> Use 12"depth for portal frame <br /> Weyerhaeuser Notes <br /> Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values.Weyerhaeuser expressly disclaims any other warrar ties <br /> related to the software.Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is <br /> responsible to assure that this calculation Is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at <br /> Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 <br /> and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to <br /> www.weyerhaeuser.com/woodproducts/docurnent-library. <br /> The product application,input design loads,dimensions and support information have been provided by Joel Niemi <br /> rForteWEB Software Operator Job Notes <br /> 5/11/2021 9:33:45 PM UTC <br /> Joel Niemi Garage replacement-Larry Blackmer contractor <br /> Joel Niemi Architect ForteWEB v3.2,Engine:V8.2.0.17,Data:V8.1.0.16 <br /> (425)422-4276 <br /> joel@jniemiarchitect.com Weyerhaeuser File Name: Blackmer-2522 Baker Garage <br /> Page <br /> 41/ <br />