Laserfiche WebLink
Labor:_ <br />Internal <br />Emolov Name Sian Date Finish Date Hours <br />Johnson. Darn 0N21/2024 0302 024 050 $19.17 <br />ToW Labor Cost <br />$19.19 <br />Material <br />External <br />Invoice No. DesurJon Units Date Cost <br />ME1`E36148 7 METER I NEPTUNE 1.00 0=1L 024 $412.13 <br />WIE-CODER RWOI IN CU FT <br />STUBANTENNA <br />Total Material Cost <br />$412.13 <br />Comments: <br />Joseph Stllllen-OW19I2024 <br />INVENTORY MATERIAL IN THEAMOUNT OF 412.13 <br />WAS JOURNALIZED IN 2024 <br />Page 2 of 2 11272024 <br />