My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9626 19TH AVE SE I 2025-05-13
>
Address Records
>
19TH AVE SE
>
9626
>
9626 19TH AVE SE I 2025-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2025 2:53:31 PM
Creation date
2/3/2025 1:39:58 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9626
Unit
I
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Install Water Meter <br />Work Order ID: 2024002990 <br />EVERETT <br />Address: 9626 19Th Ave S E Unit I <br />Priority: <br />Zone: Meter Shop <br />Status: Records Review <br />....................................................................................................................................... <br />Category: General Maintenance <br />Details: <br />Initiated By: WesNang, Teny <br />Initiated Date: 3121/ 024 10:15:14AM <br />Requested By: WesNang, Tary <br />Supervisor: WesNang, Terry <br />Submit To: WesNang, Terry <br />Submit to Date: T21/2024 10:17:30AM <br />Projected Stan: 312112024101000 M <br />Projected Finish: <br />Actual Start <br />Actual Finish: <br />Completed By: Holloway, Daniel <br />Closed By: <br />Closed Date: <br />Account 401 000005]101196]6 <br />Location Dennis: <br />Custom Fields: <br />Meter Number 1578156418 <br />SeMce Size: 1 <br />Meter Size: 1 <br />Current Read: 0 <br />Customers: <br />Customer Messes Home Phone Cell Phone Cell Date <br />....................................................................................................................................... <br />Instructions: <br />Assets <br />Teoe <br />Asset 1D(UlDI Location <br />WATER METERS <br />0 <br />Cost Summary: <br />Labor Cost <br />$19.07 <br />Equipment Cost: <br />$3.95 <br />Materiel Cost <br />$412.13 <br />Total Cost: <br />$435.15 <br />Page 10l3 11272024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.