My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7507 E HEATHER WAY 2025-04-16
>
Address Records
>
E HEATHER WAY
>
7507
>
7507 E HEATHER WAY 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:07:08 PM
Creation date
2/3/2025 1:47:30 PM
Metadata
Fields
Template:
Address Document
Street Name
E HEATHER WAY
Street Number
7507
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> CITY OF EVERET r0 -2Et,`: '� :52 <br /> ,t13 ��tJ., �.,,�lj�.TH�i; � <br /> it EL-1 026938 <br /> 38 <br /> EVERETT Permit Services �;E ,I; 19120 ET <br /> WASHINGTON <br /> 1. NC $126.91 <br /> T $126.91 <br /> CASH $127.00 <br /> n j $0.0 <br /> Plan Check No.: B1912-007 <br /> Application Date: 12/5/2019 <br /> Tenant: [TenName] <br /> Owner: LANKFORD THEODORE D& DELACRUZ <br /> ELANYA N <br /> Job Address: 7507 E HEATHER WAY <br /> Proposed Use: SFR DETACHED <br /> Description of Work: REPLACE EXTG REAR UPPER LEVEL DECK <br /> STRUCTURE <br /> Plan Check Fee Paid: $126.91 <br /> The building permit application for the above-referenced project is being conditionally <br /> accepted for filing pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional <br /> information is required to complete your building permit application, it will be necessary <br /> to submit this additional information or acquire the additional land use approval prior to <br /> your application being considered complete for filing. If no other land use approval or <br /> additional information is required, your building permit application will be considered <br /> filed as of this date. Plan review-fees are estimates. Final plan review fees will be <br /> calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> 1 /01/fq <br /> Signature Date <br /> FILE COPY <br /> 0 3200 Cedar Street © 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.