Laserfiche WebLink
I <br /> Langford Deck Replacement 5 <br /> Structural Calculations <br /> Check pickets <br /> 1p := hp —4 — 5.5.2 =21 Span of pickets(in) <br /> PAP <br /> Mpicket•= P 4 = 1.05 x 103 Moment to pickets(in-Ibs) <br /> _ Mpicket <br /> Sreq • = 1.01 Section modulus required(inA3) <br /> Fb•CF <br /> Use 2x2 cedar pickets @ 4"o.c.(S=1.6875 in^3/ft) <br /> Fasten to rails w/(2)8d nails <br /> By:J. Conner, PE, SE Deck Structural Calcs.xmcd <br /> 12/5/2019 <br />