Laserfiche WebLink
December 20,2019 -4 1, Am) Periat-c_K <br /> Ben Smith <br /> Custom Design l j� •—/�/� ,�n <br /> Sent via: Email <br /> / <br /> Subject: Deck Footings at 7507 East Heather Way <br /> Dear Ben, <br /> On Friday, December 20th,2019,I inspected the foundation prep for the deck support posts at 7507 East <br /> Heather Way in Everett for conformance with the deck design I provided on December 4t.At the time <br /> of inspection the subgrade was fully prepped and formwork in place for the concrete patio and deck post <br /> footings. Each of the post footings were dug out for minimum 24-inch square footings per my <br /> recommendations. #4 rebar grids were on site for each of the footings. Based on my inspection the deck <br /> support footings were prepared in accordance with my design. <br /> feel free to contact me if you would like to <br /> Attached to this letter arephotos from myinspection. Please <br /> p <br /> more detail or ifyou have anyquestions. You can reach me by phone at <br /> discuss any of these items in <br /> (206) 914-9536, or by email at JConner.Engineering@outlook.com. <br /> Sincerely, ."aH`AL ; <br /> $�ov w,a Sit?4, ° <br /> Jon Conner,PE, SE ,4 , 44872 � W4 <br /> Structural Engineer �Q civnAL �o,C ��� <br /> s!oNAti' 12/20/19 <br /> Attachments: Inspection photos <br /> 02102120 9:07 PM <br />