My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7507 E HEATHER WAY 2025-04-16
>
Address Records
>
E HEATHER WAY
>
7507
>
7507 E HEATHER WAY 2025-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:07:08 PM
Creation date
2/3/2025 1:47:30 PM
Metadata
Fields
Template:
Address Document
Street Name
E HEATHER WAY
Street Number
7507
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: X1912-002 Description: REPLACE APPLIANCES IN EXTG LAYOUT,ADD GAS LINE FOR <br /> FUTURE <br /> Applied: 12/5/2019 Approved: 12/6/2019 Site Address: 7507 E HEATHER WAY <br /> Issued: 12/6/2019 Finaled:8/14/2020 City,State Zip Code: EVERETT,WA 98203-5456 <br /> Status: FINALED Applicant:<NONE> <br /> Parent Permit:W2002-011 Owner: LANKFORD THEODORE D&DELACRUZ ELANYA N <br /> Parent Project: Contractor: CUSTOM DESIGN BUILDERS LLC <br /> Details: <br /> UPGRADES <br /> OTHER MECH=BAR B QUE <br /> REPLACE APPLIANCES IN EXTG LAYOUT,ADD GAS LINE FOR FUTURE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 1/17/2020 1/17/2020 GAS 01-ROUGH IN SHELLIE PONS APPROVAL <br /> Notes: <br /> Gas line tested at 15#ok for service. <br /> Note: Main gas line inside the building was covered,contractor stated that pipe was fished through the ceiling from the outside.Inspector only saw the <br /> outlets and the outside piping. <br /> Please call your inspections in before cover and per our policy. <br /> 2/11/2020 2/11/2020 MECH 06-FINAL DAROLD WALDEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> 425-754-4612 <br /> (2/11/2020 11:42 AM DXW) <br /> complete anti tip at range. <br /> 2/11/2020 2/11/2020 PLUMB 06-FINAL DAROLD WALDEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> 425-754-4612 <br /> (2/11/2020 11:41 AM DXW) <br /> remove S trap on lay. <br /> 2/14/2020 2/14/2020 MECH 06-FINAL DAROLD WALDEN CORRECTION <br /> REQUIRED <br /> Notes: <br /> 425-754-4612 <br /> (2/14/2020 2:56 PM DXW) <br /> obtain all req.permits. <br /> expose all work done with out inspection. <br /> I <br /> Printed: Monday,03 February,2025 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.