My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
>
Address Records
>
18TH AVE W
>
9502
>
UNIT Q
>
Plans
>
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 8:32:43 AM
Creation date
2/3/2025 2:26:40 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT Q
Permit
B2310-030
Year
2023
Notes
NEW SFR - REFRB2306-005 - UNIT Q
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL FRAMING OR HARDWARE <br />NOT SHOWN OR SPECIFIED <br />TO REMAIN UNCHANGED <br />I <br />r---L <br />3-CAR GARAGE OPTION - ELEV 'A' <br />� <br />I <br />— <br />I <br />�soa� <br />5 ^^5 <br />I <br />I <br />I <br />ALL FRAMING OR HARDWARE <br />I <br />I <br />1 <br />NOT SHOWN OR SPECIFIED <br />S07 <br />TO REMAIN UNCHANGED <br />- <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />EXTENDED GARAGE OPTION - ELEV. 'A' <br />FOUNDATION PLAN NOTES: <br />1. Sla n lade shall be 4" thick. Slab shall be poured ov rei) ra�Fli per GewecIm cal Report. See Architectural <br />Drew ngs for Slab Elevat on Depressor and Slope requirements. <br />Cfnslruct o Control Joint In Slabs are optional but recomme ldad to control cracking. When used slab areas between loiste shall <br />ba approz mately square and 400-sf or less <br />3, The Contractor shall determine actual fooling elevations based on final grafts and site conditions. Bottom of Footings snail be set <br />on competent, properly graded bearing soil below Frost Depth. <br />4. Anchor Bolts for Exterior Stud Walls shall be in accordance with P1-6 of the Shear Wall Schedule of 11S06, u.o.n. <br />5. See 1GIS06 for Simpson to US hardware comersifn table. <br />LEGEND <br />XX DETAIL CALL -OUT <br />X. <br />ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 11506 <br />SL48-0N-GRADE PER PLAN NOTE 1 <br />L I FOUNDATION WALL <br />---J <br />0 RAISED FOUNDATION WALL <br />BEARING OR SHEAR WALL ABOVE <br />CRAWL SPACE POST BELOW <br />XX FOOTING CALL -OUT SEE 5/S07 <br />STEP STEP TOP OF STEM WALL <br />
The URL can be used to link to this page
Your browser does not support the video tag.