My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
>
Address Records
>
18TH AVE W
>
9502
>
UNIT Q
>
Plans
>
9502 18TH AVE W 2023 UNIT Q Plans 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 8:32:43 AM
Creation date
2/3/2025 2:26:40 PM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT Q
Permit
B2310-030
Year
2023
Notes
NEW SFR - REFRB2306-005 - UNIT Q
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL FRAMING OR HARDWARE <br />NOT SHOWN OR SPECIFIED <br />TO REMAIN UNCHANGED <br />10Y" o 1u/", <br />3-CAR GARAGE OPTION - ELEV. 'B <br />FOUNDATION PLAN NOTES' <br />t. Siab-.EGmde shall be 4 thwk. Slab shall be poured over Frae Crabbing Granular Ftll per Geolechntral Report See Architectural <br />Drawings for Slab Elevation, Depression, and Slope requirements. <br />2. Coretruction/Control Joint in Slabs are optional but recommended to w,tr l cracking. When used slab areas between joists shall <br />be approximately square and 4001 less. <br />3. The Contraclar shall tletermine actual footing elevatlon5 based on foal grades and site conditions. Bottom of Footings shah be se[ <br />on mmpetan[, properly graded bearing soil below Frost Depth. <br />4. Anchor Bolts for Exterior Stud Walls shelf be In accordance wiN Pt-6 of Me Shear Wall Schedule of,/506, u.o.n. <br />5. See ,OIS06 for Simpson to USP hardware conversion table. <br />LEGEND <br />SX.X <br />DETAILCA1 -OUT <br />FP1-X <br />ANCHOR BOLTS FOR SHEAR WALLABOVE PER SCHEDULE OF,/SO6 <br />SLA&ON.GRADE PER PLAN NOTE , <br />L[J <br />FOUNDATION WALL <br />(- -I <br />RAISED FOUNDATION WALL <br />j <br />BEARING OR SHEAR WALL ABOVE <br />CRAWLSPACE POST BELOW <br />%X <br />FOOTING CALL -OUT SEE 5IS07 <br />STEP <br />STEP TOP OF STEM WALL <br />/4"-,-g. 0 1 8 16 S02.1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.