Laserfiche WebLink
RIDGE <br />WEN HD <br />FLOO'', <br />MAIN FLOOR <br />E-J <br />b <br />Q <br />L�l -2 J <br />8 <br />Q <br />REAR E.LEV41-11'''\! <br />SCALE V4' '-0' <br />ELEVATION NOTES: <br />L CONTRACTOR SHALL VERIFY ALL NOTES, MATERIALS 4 CONDITIONS PRIOR TO <br />CONSTRUCTION. <br />2. CAULK ALL EXTERIOR JOINTS t PENETRATIONS. <br />3. PROVIDE GALVANIZED OR ANODIZED SHEET METAL FLASHING t COUNTER <br />FLASHING @ ALL ROOF PENETRATIONS, CHIMNEYS* SKYLIGHTS. <br />4. PROVIDE CONTINUOUS GUTTERS t DOWNSPOUTS @ ALL EAVES, TYP. <br />5. PROVIDE HEADER FLASHING @ ALL DOORS, WINDOWS 4 SHUTTERS PER DETAIL <br />6. ALL PAPER AND TAPE TO LAP FROM TOP DOWN <br />7. HOLD ALL 51DING MATERIAL 1�" OFF ROOF <br />B. HOLD ALL SIDING MATERIAL 6' OFF FINISHED GRADE <br />9. SOFFIT ALL FLAT AREAS w/ IV" OVERHANG @ HORIZ. EDGES <br />10. METAL FLASHING @ ALL HORIZ. TRIM 4 SIDING BREAKS <br />II, RUN 2ND LAYER OF TAR PAPER VERT, @ INTERIOR 4 EXTERIOR CORNERS <br />UNLESS TAR PAPER 15 CONTINUOUS <br />12. FOUNDATION VENTS TO BE SPACED PER PLAN <br />13. ALL FOUNDATION VENTS ON STREET SIDE OF HOUSE I.E. FRONT t/OR SIDE 4 <br />GABLE END t GARAGE FRESH AIR VENTS TO BE LOUVERED <br />14. EXTERIOR LIGHT BLOCKS AT ALL FRONT ENTRY'S SHALL BE INSTALLED AT <br />T-0 A.F.F. <br />15. THE TOP OF THE EXTERIOR LIGHT BLOCKS AT GARAGE SHALL ALIGN WITH <br />TOP OF THE GARAGE DOOR TRIM <br />16. ALL LIGHT BLOCKS ON STONE FACADE TO BE FURRED OUT AN ADDITIONAL U'i <br />21. GUTTERS TO LAP UNDER DRIP EDGE @ EAVES. HOLD %' DRIP EDGE OUT Y" <br />AWAY FROM FASCIA TO ACCEPT GUTTERS TO LAP UNDERNEATH <br />22. ALL TRIM WORK TO BE APPLIED PRIOR TO SIDING MATERIALS (SIDING TO <br />BUTT UP TO TRIM WORK) <br />23. CEILING OF EXTERIOR BACK DECK TO BE FLAT. <br />RIDGE <br />WDW <br />UPPE <br />MAIN <br />FRONT REAR <br />SIDE ELEVATION 'A' <br />SCALE: 1/4' = 1'-0' <br />SECTION A -A <br />SCALE: 1/4" - 1'-0" <br />