Laserfiche WebLink
DEMISING SPACE // DEMISING SPACE DEMISING SPACE // DEMISING SPACE <br /> CS16 STRAP EXTENT OFBLOCKING ... _.. <br /> �.. t!• 'lI }- J_ O HEADER(NOT <br /> REDD WHENLOWER STRAP - <br /> - --- - -- EXTENDS FULL LENGTH OF <br /> RUN END TRUSS ---- _ ---- - -- SHEAR WALL) <br /> THRU DEMISING CS16 STRAP TO TRUSS-- SHEATHING PER PLAN <br /> SPACE TOP CHORD EXTEND - <br /> PAST DEMISING SPACE CS STRAP TO TRUSS TRUSS PER PLAN PARTY WALL PER PLAN <br /> TO NEAREST HEADER AT TOP CHORD EXTEND 1 _ <br /> SHEAR WALL OR TO TOP --- - ----- - - PAST DEMISING SPACE _ - •I <br /> PLATE(WHERE OCCURS) - - -- _-.-.- TO NEAREST HEADER I <br /> - -. 1 -_i _--_- SHFAR WALL EDGE �L <br /> RUN LOW END TRUSS x..,. AT SHEAR WALL ' - - NAILING <br /> THRU DEMISING SPACE BEHINDTBLOCKING - ` SHEATHING AND <br /> 8 BUTT TO END STUD -18", I,(f -18" / - 12d 6"oc NAILING PER PLAN <br /> BEHIND <br /> LOW END TRUSS ` - -WHERE NO OPENING <br /> i THRUDEMISING SPACE <br /> J ---- -- 8 BUTT TO END STUD OCCURS,EXTEND <br /> - - PFOR LENGTH i PLAN WHERE OCCURS BTL <br /> -- - ----- '- OF SHEAR WALL <br /> 2x41 --- <br /> STRAP _ <br /> - _ • HEADER OR BEAM PER <br /> ---_ FLAT BLOCKING 2%12 FLAT BLOCKING CON CE PER LT.TOP ATE 2x STUD WALL PER PLAN PARTSHEAY WALL PER PHING& LAN <br /> NG T .I EEAING P.S. <br /> BEHIND STRAP I <br /> (2)CS16 STRAP AT ENGIN <br /> (2)P PLAT RAP AT LOW <br /> LOW TOP LATE- TOP PLATE-EXTEND FULL ) RUN LOW END TRUSS <br /> No Ste EXTEND FULL LENGTH Step up to 12" LENGTH OF SHEAR WALL 12 <Step<25" gTHRU gUTTTOIENDSTUDE Step>25"(Max 36") <br /> p OF SHEAR WALL OR TO NEAREST OPENING - - o`T <br /> Exterior Wall @ Demising Wall(Floor Level) 18 17 16 .,«_� <br /> AIR SPACE PER ARCH'L AIRSPACE PER ARCH'L <br /> DO NOT CONTINUE SHEATHING <br /> OVER DEMISING WALL SPACE <br /> DO NOT CONTINUE SHEATHING PERMITSET mon <br /> FLAT WISE TRUSS BLOCKING SHEATHING PER IISO6 OVER DEMISING WALL SPACE - --- SHEATHING PER 1/SO6 DIAPHRAGM BOUNDARY NAILING <br /> W/VERTS @ 24"oc MAX SHEAR WALLS @ SHEAR WALLS (2)2.4 BLMG WHERE WALL <br /> (DRAG LOAD=240 PLF) FLAT WISE TRUSS BLOCKING <br /> W/VERTS @ 24"oc MAX - - PANEL EDGE NAILING EA WALL SHEATHING PER PLAN STRUT TRUSS PER PLAN ABOVE OCCURS <br /> (DRAG LOAD=240 PLF) <br /> PANEL EDGE NAILING EA WALL - _ I, / <br /> -- <br /> U) <br /> ADDL 2 2x4 VERT AT ... <br /> (I ,I <br /> TRUSS END FOR GWB FIRE - -- ! TRUSSES PER PLAN f RUN 2x8 LONG MIN PAST / J <br /> CAULKING PER ARCH'L ADD'L(2)2x4 VERT AT -EXTEND GWB EA.BAY TO EA.STRUT TRUSS <br /> (TOTAL OF 3 VERTS END _ 2x6 FLAT @ 18"oc FULL 12'MAX A' <br /> OF EA.TRUSS) , TRUSS END FOR GWB FIRE UNDERSIDE OF FLOOR LENGTH OF SHEAR WALL SHEAR WALL EDGE NAILING -TOP CHORD BEARING TRUSSES BEAM PER PLAN TOP CHORD BEARING TRUSSES <br /> CAULKING PER ARCH'L SHEATHING AS REQUIRED <br /> EXTEND GWB EA.BAY TO w/P LATESDWS22500(STAGGERED) <br /> • PER PLAN-ATTACH TO BEAM (GIRDER WHERE OCCURS) PER)12d TOENAIL TO BEAM <br /> 12d FACENAIL @ 8"oc UNDERSIDE OF FLOOR (TOTAL OF 3 VERTS END PER ARCH'L TOP PLATE(STAGGERED) HEADER PER PLAN w/(2)12tl TOENAILS(BOTH wl(2)12d TOENAILS(BOTH w <br /> EA WALL SHEATHING AS REQUIRED OF EA.TRUSS) 8(2)SDWS22300 INTO EA. (WHERE OCCURS) SIDES,WHERE OCCURS) SIDES,WHERE OCCURS) r) <br /> PER ARCH'L --PANEL EDGE NAILING EA WALL TRUSS(STAGGERED) Ili` 2x STUD WALL PER PLAN BEAM PER PLAN <br /> 12d FACENAIL @ 6"oc <br /> PANEL EDGE NAILING EA WALL EA WALL CONTINUOUS TOP PLATE <br /> GWB PER ARCH'L (SPLICE PER 13/SO6) li; SHEATHING PER 1/S06 <br /> SEE B/S08 SEE 61S08 <br /> FOR <br /> IN COMMONTS GWB PER ARCH'L R CALL-OUT 1 5 Fry COMMONS 14 13 12 11 <br /> AIR SPACE PER ARCH'L /A AIR SPACE PER ARCH'L cnn� <br /> 12d @ Woe 12d <br /> BOUNDARY W <br /> - 12d 6"oc(FACENAIL PER 1/SO6 NAILING 12d @ 6"oc(FACENAIL PER 1/SOB <br /> WHERE SPLICE OCCURS) WHERE SPLICE OCCURS) <br /> DO NOT CONTINUE SHEATHING DIAPHRAGM BOUNDARY PROVIDE SQUASH BLK'G <br /> OVER DEMISING WALL SPACE -- SHEATHING PER 1/SO6 NAILING UNDER POSTS AND BUILT UP O <br /> Ili SHEATHING PER I/SOB @SHEAR WALLS DIAPHRAGM <br /> @ SHEAR WALLS BOUNDARY NAILING STUDS ABOVE(MATCH SIZE <br /> �I SHEATHING PER PLAN SHEAR WALL EDGE NAILING ABOVE SHEAR WALL EDGE NAILING C J <br /> PANEL EDGE NAILING EA WALL SHEATHING SHEATHING J <br /> ` PER PLAN O = <br /> TRUSS PER PLAN - PER PLAN <br /> PANEL EDGE NAILING EA WALL \ �� WALL 1 ♦1� \�� SPLICE SHEATHING(LEVEL 0 <br /> SPLICE SHEATHING(LEVEL L <br /> ... SHTG TO - ---� 2 FLOOR ONLY) "� 2 FLOOR ONLY) r C <br /> 4 - BE CONT. i t <br /> 1 TO TOP fy0 UU <br /> - PLATE - SHEAR WALL SHEAR WALL L �j o <br /> (NO EDGE NAILING EDGE NAILING <br /> ADDL TRUSS OVER WALL w/ '� SPLICES) ♦ � Q <br /> VERTS @ 24"oc,MAX.(DRAG - }.� 'I', _ _ ---J SPLICE SHEATHING _ / SPLICE SHEATHING y U <br /> LOAD-240p1F),BEAM AT SIM ADDL TRUSS OVER WALLwI :I '.` SPLIC PLATES) ` (BTWN PLATES) > LL <br /> VERTS @ 24 oc MAX.(DRAG EXTEND GWB TO UNDERSIDE fN f TRUSSES I 111 <br /> LTP4 27"oc EA TRUSS I OF FLOOR SHEATHING AS FLATWISE TRUSS - 12d TOENAILS TRUSSES PER PLAN SHEAR WALL EDGE NAILING PER PLAN SHEAR WALL EDGE NAILING <br /> @ LOAD=240plo,BEAM AT SIM REQUIRED PER ARCH'L BLOCKING(DRAG @ 6"0c Q <br /> EXTEND GWB TO UNDERSIDE LOAD=180PLF) STIR NGBACKS PER 2x4 RIM BOARD D_ <br /> OF FLOOR SHEATHING AS LTP4 @ 27"oc EA TRUSS TRUSS MFR. HEADER PER PLAN TOP 8 BOTTOM HEADER PER PLAN <br /> REQUIRED PER ARCH'L - PANEL EDGE NAILING EA WALL 12tl FACENAIL @ 4"oc • SHEAR WALL (WHERE OCCURS) (WHERE OCCURS) O <br /> (BLOCK SO TT.CHORD END TRUSS w/STUDS 4— <br /> PANEL EDGE NAILING EA WALL <br /> TO PLATE) 1` EDGE NAILING @16"oc(STRUT TRUSS r— <br /> GWB PER ARCH'L AT SIM) A♦ <br /> CONT.TOP PLATE--- HEADER PER PLAN 2x STUD WALL PER PLAN 2x STUD WALL PER PLAN <br /> SEE 7/SOB GWB PER ARCH'L SEE 71808 -- (SPLICE PER 13/806) 1 (WHERE OCCURS) CONT.TOP PLATE <br /> FOR CALL-OUTS FOR CALL-OUTS (SPLICE PER 131SO6) CONT.TOP PLATE <br /> IN COMMON 10 <br /> IN COMMON O 2x STUD WALL PER PLAN SHEATHING 8 SHEATHING PER 1/SO6 7 (SPLICE PER 13/SO6) SHEATHING PER 1/806 6 <br /> N PER 1/SO6 <br /> SHEATHING PER 1/806 <br /> SHEATHING PER 1/S06 'I <br /> \ � 2x STUD WALL PER PLAN I <br /> \ SHEATHING NAILS @ 4"0c • FACENAIL PER 1/S08 `v <br /> DIAPHRAGM BOUNDARY v1 <br /> NAILING DIAPHRAGM BOUNDARY <br /> 2x4 BLOCKING- O `w <br /> PLAN VIEW LUS28 HGRS(SEE GEN. HANDRAIL PER ARCH'L NAILING — SHEAR WALL <br /> 1 NOTES FOR HGR.REQ'MENTS . 2x4 BLOCKING W(2)ROWS EDGE NAILING _ <br /> LOCATE 2x8 BLOCKING @ TREATED WOOD) DECKING PER ARCH'L -_ { 12d @ IF'- SHEATHING PER PLAN a <br /> FACENAIL PER 1/SOB ---- - <br /> 1.".APART AND SPLICE SHEATHING <br /> - <br /> CENTERED w/DTT1Z DECKING PER ARCH'L 2x8 BLOCKING 4x4 POSTS @ 48"oc,MAX W/ - <br /> DIAPHRAGM BOUNDARY <br /> (2N"0THRU-BOLTS - - - Q <br /> J 1 NAILING p - - SHEAR WALL ' <br /> EDGE NAILING <br /> p 1 SHEATHING PER PLAN SHEAR WALL { JOB NO.: <br /> / _r/ EDGE NAILING 1 23-239-06 <br /> 1 L / 2"1%/ PLOT DATE <br /> JOISTS PER PLAN JOISTS PER PLAN(@ FLUSH BEAM PER PLAN <br /> - HANDRAIL POSTS, O6/OB/2023 <br /> (2)2x6 AT DTT1Z DTT1Z PER PLAN W/sa O SANDWICH POST W/ / - TRUSSES PER PLAN DATE: 06/08/2023 <br /> w/A35 TO TRUSS LAG SCREW(2 MIN EMBED DBL-JOIST) -___. / -` L STRONGBACKS PER HANGERS PER TRUSS MFR <br /> TOP CHORD TO END TRUSS TOP CHORD) - TRUSS MFR. SCALE: a".1'-0" <br /> 2-PLY END TRUSS W/ TRUSSES PER PLAN MONO TRUSSES PER PLAN FLUSH BEAM PER PLAN DRAWN: BDS <br /> STUDS @ i6"oc AND P.T.2x10 LEDGER W/SDWS22400DB TOP VIEW <br /> ST <br /> ST TOP CHORD SCREW @ 12bc TO TOP CHORD BEAM PER PLAN CHCKD: RMH <br /> AND EA.TRUSS VERT. HANGER PER TRUSS MFR <br /> SEE 7/SOB SEE B/SOB BLDG: SHEET NO.: <br /> FOR CALL-OUTS G BEAM PER PLAN FOR CALL-OUTS <br /> IN COMMON C 4 3 2 IN COMMON 1 <br /> - B S08 <br />